A Chartered Quality Professional (CQP) and a member of the Chartered Quality Institute (CQI) with a grade of Practitioner and with a competitive experience in construction having over 11 plus years gained experience in the large-scale construction projects for Oil & Gas, Petrochemical, Cobalt, Copper & Gold Mining Plant, Fertilizer Plant, Power Plant, and Infrastructure and with project cost up to USD1.2b. Ensuring an effective management of the QMS for the success of the project. My career started in the construction team where I gained experience in the on-site construction process, then switched to QA/QC which I maintain a progressive and effective management and supervision as well as implement series of change initiatives to overcome many major quality development challenges and improvement within the organization to deliver acceptable requirements to clients.

Last Resume Update October 20, 2017
Address Al Thumama, Qatar
E-mail hbabuanjr@yahoo.com
Phone Number +97450385078

Experience

Daewoo E&C Co. Ltd.
QA ENGINEER
Mar 2017 - Current
This is an EPC Infrastructure (Expressway) Project costs QAR 2.6B+ which deals with the construction of new Expressways with underpasses, Structures, and Utilities (wet & dry), under Qatar’s Public Works Authority PWA (ASHGHAL) with KBR as the Engineer and WSP|PB as the Supervision Consultant. This is part of the government’s development program, including the preparation for the 2022 World Cup which will be held in the area.
Hyundai E&C Co. Ltd.
QA MANAGER
Sep 2014 - Mar 2017
This is an EPC Infrastructure Project (Amusement) owned by UAE-based company MERAAS Holding LLC costs AED 800M+, with UK-based company MACE as the client representative, TUV-SUD as the Inspection Engineer and WSP|PB as the Consultant. Our scope is to fabricate and install components of the world’s largest Ferris wheel (a Guinness World Record Project), the Dubai-I. Our project involves steel structure (fabrication & installation), painting, machining, erection, piling works, concrete works, and earthworks for the wheel’s foundation, and including MEP works.
Daewoo E&C Co. Ltd.
QA ENGINEER
Nov 2012 - Aug 2014
This is an EPC Project 2000MW Independent Power Plant Project in Sur Industrial State, Oman (Oman’s Largest Power Plant in operation) owned by the government of Oman and US-based company Phoenix Power Company costs USD 1.2B+ and MOTT MACDONALD as the consultant. This is a multi-discipline project involving Civil, E&I, Mechanical, Piping (fabrication and installation), Structural, Insulation, Painting, Commissioning and all other construction work scopes.
Daewoo E&C Co. Ltd.
QA ENGINEER
Sep 2009 - Sep 2012
This is a joint venture with MHI Ltd. It’s an EPC type, Urea Fertilizer Plant project located in Oran, Algeria owned by the joint venture of Algeria’s SONATRACH and Oman’s SUHAIL BAHWAN Group costs USD 800M+, this is a multi-discipline project covers Civil, Electrical, Instrumentation, Mechanical, Piping (fabrication and Installation), Structural, Painting, Insulation, Commissioning and all other construction work scopes.
BJC Construction Industries Ltd.
QA/QC ENGINEER
Aug 2008 - Mar 2009
This is a short-term EPC project which we fabricated and installed components of the Acid Plant (Piping, Pipe racks, Column Vessels, Stack, Boiler, CO2 Converter, Cooling Tower, Storage Tanks, Including insulation works for piping assemblies and other vessels for the Cobalt and Copper mining plant, for the US-based company, FREEPORT-MCMORAN Inc. as the client and GRD MINPROC as the client representative.
ARCC-EEI Construction Co. Ltd.
SENIOR QA/QC ENGINEER
May 2007 - May 2008
These were Oil and Gas projects, the SABIC’s SHARQ 3rd Ethylene Plant Expansion Project in Jubail which SABIC as the Owner, Shaw Stone and Webster as the main contractor; and also the Petro Rabigh U02 Plant Refinery Expansion Project in Rabigh which the joint venture of Saudi ARAMCO and SUMITOMO Chemical as the owner, and also AL HOTY as the PMT. These were a multi-discipline project involving Mechanical, Piping (fabrication and installation), Structural, Painting, Insulation, E&I, Civil and all related works concerning the project.
EEI Corporation / TIC-IP
FIELD ENGINEER
Jul 2005 - Jul 2006
This project is an open pit gold mining plant and an EPC type. I was supplied by my company EEI Corporation to the main contractor of the project, a US-based company, TIC-International Projects and with the US-based company, NEWMONT Ghana Gold Limited as the owner and the Australian-based company, LYCOPODIUM as the consultant. This is a multi-discipline project deal with Piping erection works, Steel Structure assembly and erection works, Tank Assembly works, including Mechanical works (Static and rotating) and E&I.
EEI Corporation
JUNIOR ENGINEER
May 2004 - Sep 2004
This was a short-term Infrastructure project owned by Procter & Gamble Philippines and with the main contractor FLOUR DANIELS Pacific. In this project, we have built the liquid facilities expansion plant, including the installation of its necessary equipment and facilities.
ARCC-EEI Construction Co. Ltd.
PIPE FITTER
Jan 2002 - Jul 2003
This was an Oil & Gas projects in which our company had subcontracted a Mechanical, E&I, Structural, Piping, and Civil works cope for the main contractor, UK based company, AMEC BKW Arabia Ltd. with the Saudi ARAMCO as the owner.