; ;
CV - Sr. Piping Designer, Oil and Gas Mining - js99521
 

CV - Sr. Piping Designer, Oil and Gas Mining

 
 
Ref #JS99521
Year of birth1964

Permanent/Home Location/Address
City or TownARAYAT
State 2012
CountryPHILIPPINES

Current Location/Address
CountryMALAYSIA

Languages
Primary LanguageFluency
TagalogRead, write and speak fluently

Nationalities
Main NationalityPHILIPPINES

Experience Classification
Job FunctionYears Experience
Piping Designers17
IndustryYears Experience
Oil and Gas16
Mining1

Qualifications
Highest QualificationsDegree

QualificationSubject Establishment/Country Year
DegreeINDUSTRIAL TECHNOLOGYEARIST, PHILIPPINES1987
Trade QualificationsTECHNICAL DRAFTINGEARIST, PHILIPPINES1985



Computer Skills and Software Used
Software used includes Plant Space Design Series (PSDS 3D Microstation Triforma v8), Pipe Support Modeler, AutoCad (Rel. 14, 2005 & 2006), Microstation, Smart Plan Review (SPR), AutoPlant Explorer, Windows (Word, Excel and Access)

Work Locations
Are you willing to move or relocate? Countries NOT Willing To Work In!
Yes - I will travel internationally- West Africa
- North Africa



Availability
Start Immediately? Available Now
Earliest Start DateGiven 2 weeks notice

Ideal Next Job
PIPING DESIGNER / CHECKER, CONSTRUCTION SUPERVISOR, CLIENT SITE REP., PMT

Required Salary & Conditions
USD40-45/hr. or USD4,000-ABOVE

Employment History
Total Years of Work Experience: 23
Commenced Full Time Work: 1989
NameAKER Solutions Malaysia Sdn. Bhd.
Job Title:Sr. Piping Designer
DurationFrom : 2010 To:

Summary
With 17 years piping design and construction experience for onshore/offshore facilities, skidded process systems and topsides for clients such as Shell, Petrobras, MODEC, Petronas, BP, Saudi Aramco, Petrokemya, ExxonMobil, Mutineer & Exeter, CNOOC and Qatar Petroleum.

Proven piping design prior to fabrication and construction, construction supervision and involvement with project management team/client support representative.

Work Experience
Nov. 2010 - Present
Sr. Piping Designer
AKER Engineering Malaysia Sdn. Bhd.
(seconded basis under Composite Dynamic Sdn. Bhd.))

Worked as Client Site Representative (CSR) to provide engineering support and resolved queries and discrepancies between design and construction. Review pipe routing to check clashes using Plant Design Review. Provide pipe re-routing sketches, additional pipe supports and other related drawings prior to fabrication. Provide construction supervision as required.

Project(s):
-ICPR – Process Platform for ONGC (fabrication located in Indonesia)


April 2009 – Oct. 2010
Piping Design Engineer / Checker
Malaysia Marine & Heavy Eng’g.
(formerly Malaysia Shipyard & Eng’g.)
(seconded basis under Azdaman Eng’g. Sdn. Bhd.)

Check and ensure that all piping deliverables (isometrics, MTO and pipe support drawings) from consultants (WorleyParsons (HULL) and Technip (TOPSIDE)) are consistent and based on project specifications prior to fabrication and construction. Review and revised pipe routing, pipe support drawings and pipe spooling based on DCN requirements. Field verify discrepancies between engineering and construction. Monitor daily activities of PDMS designers as well as work progress.

Project(s):
-Gumusut/Kakap Semi-Submersible Floating Production System (FPS) for SHELL International Exploration and Production (SIEP)


March 2008 - March 2009
Sr. Piping Designer
HATCH Africa (Pty) Ltd.
Johannesburg, South Africa

Prepare piping layout, piping isometrics, material take off and rerouting of piping using Plant Space Design Series (PSDS-3D Plant Design Series Modeling, Microstation v8). Review piping routing done by designers from other HATCH global offices. Assist lead engineer in solving discrepancies between engineering and construction. Prepare pipe support design and 3D model using Pipe Support Modeler. Check and ensure that all piping deliverables are consistent and based on project specifications.

Project(s):
-Anglo Platinum Expansion Project for Rustenburg Base Metal Refiners (Pty) Ltd.-(EPC)


June – Nov. 2007 (Project Hire)
Sr. Piping Design Checker
Bechtel Int’l (Thailand) Ltd.
(Seconded basis under The Consultants, UK)

Review and check piping drawings prior to fabrication and construction. Prepare demolition and tie-in drawings, isometrics and material take off. Assist lead engineer in solving discrepancies between engineering and construction. Field verified new tie-ins on existing lines. Ensure all deliverables are consistent and based on project specifications. Lead CADD draftsmen for incorporating of data to existing drawings.

Project(s):
-TPX Revamp Project for ThaiOil and Thai Lube, Sriracha, Thailand – (EPC)

Jan. – June 2007 (Project Hire)
Sr. Piping Engineer
WorleyParsons (Thailand) Ltd.
(Seconded basis under Technilink (Singapore)Pte. Ltd.)

Responsible in preparing piping layout, equipment layout and tie-in locations, pipe support details, isometrics and material take-off base on project scope of work (SOW). Review and check piping model using AutoPlant Explorer. Assist lead engineers in reviewing deliverables, vendor drawings, hook-up drawings, data sheets and other documents prior to final submission. Monitor daily progress and PDMS activities.

Project(s):
- Funan Water Injection Platform for Chevron, Thailand – (Design)


Feb. – Nov. 2006
Sr. Facilities / Piping Designer (Offshore Dept.) (Project Hire)
Qatar Petroleum (Ras Abu Abboud, Doha, Qatar)
(Seconded basis under IPEDEX Production-AMEC SPIE, Abu Dhabi)

Prepare conceptual designs, piping layout, tie-in locations, pipe support details, isometrics and material take-off using AutoCad 2006. Verify and update P&ID’s, piping plans and isometrics based on the comments and as-built. Retrieve existing drawings to be used for new tie-ins using Technical Data Management System (TDMS).

Project(s):
- Various wellhead tie-ins on production platforms (PS-2 and PS-3) Bul Hanine & Maydan Mahzam - (Rehabilitation and permanent hook-up of existing and new wellheads-Design)


Aug. 2003 – Feb. 2006
Piping Design Engineer/Lead Piping Designer
AKERKVAERNER Process Systems Asia Pac Sdn. Bhd.
(Seconded basis under Laksana Spektrum Sdn. Bhd.), Malaysia

Responsible in producing piping layout, equipment layout and tie-in locations, pipe support details, isometrics and material take-off. Assists project engineers in material selections, preparation of data sheets and technical query from the client. Lead a group of drafting personnel for piping CADD works. Check and monitor progress of piping on drafting and fabrication works. Site activities as required for the new tie-ins. Review vendor’s equipment drawings. Prepare and directly report to Engineering Manager for piping design progress.

Project(s):
- Various process packages for FPSO and offshore platforms such as TEG, MEG, water injection, fuel gas, nitrogen, chemical injection and separator skids for Shell, Petrobras, Petronas, Saipem, CNOOC, MES, Talisman, Otway, ERHA, Mutineer & Exeter and Qatar Petroleum. – (Design and Fabrication)

July 2002 – July 2003
Sr. Piping Designer / Constr. Piping Engineer (Client Site Representative)
AkerKvaerner Petrominco Eng’g. Sdn. Bhd.
(Seconded basis under Laksana Spektrum Sdn. Bhd.), Malaysia

Involved in FEED to developed piping plan, equipment locations, pipe support details and location. Review isometrics and material take-off generated from PDS. Coordinate with other disciplines for interfacing connections. Assist PDS operators to achieve design correctness and requirements. Assigned to BP Petronas Acetyls as Construction Piping Engineer-CSR to assists contractor on design changes, interferences, material requisitions and technical queries.

Project(s):
- Bunga Raya-A (BR-A) topside platform for Talisman, Malaysia – (Design)
- BP Petronas Acetyls Sdn. Bhd. (TAR & Debottleneck Proj.), Terengganu, Malaysia – (Constr.)


Feb. 2002 – July 2002
Piping Engineer I
C & E Corporation
(Chiyoda – EEI Philippines)
Pasig City, Philippines

Prepare piping layout, pipe support locations and details. Design checking from PDS using Smart Plan Review (SPR). Review isometric drawings and material take-off generated from PDS. Assist project engineer in reviewing vendor’s equipment drawings and incorporating client’s comments.

Project(s):
- Ras Laffan Liquified Natural Gas (LNG) Expansion Project Train 3 for QGPC – (EPIC)


April – Nov. 2001 (Project Hire)
Design Checker
ABB-Lummus Alireza Ltd. Co.
Al-Khobar, Saudi Arabia

Review/check piping layout, equipment layout and pipe support design based on client’s requirements. Prepare piping layout and pipe support design as required. Supervision and monitoring of site activities for the new piping tie-ins, resolved technical queries and walk-thru with clients prior to pre-commissioning.

Project(s):
- Detailed designed of Neat Khuff Condensate (ARAMCO-Abqaiq/Ras Tanurah) – (Design)
- Upgrading of Ras Tanurah North Pier Shipping Wharves (ARAMCO-Ras Tanurah) – (Constr.)


Aug. 1999 – Aug. 2000
Piping Engineer (PMT)
Saudi Arabian PARSONS Ltd.
Jubail, Saudi Arabia

Involved in project management team (PMT) for Petrokemya to verify and monitor all the piping works. Coordinate with contractor on material requisitions, design changes, technical queries and pipe spool fabrication. Liaise with client and contractor for the cleared punch list prior to pre- commissioning.

Project(s):
- Construction of Petrokemya’s Olefins III Plant (Jubail, Saudi Arabia) – (EPCM)

May 1998 – July 1999
Mechanical Design Engineer
Halliburton, Brown and Root (Thailand) Ltd.
(thru Technilink (Thailand) Ltd.), Rayong, Thailand

Involved in FEED to developed piping layout, equipment layout and isometric drawings. Prepare preliminary piping and equipment layout for client’s approval. Lead drafting personnel to achieved basic design requirements. Review vendor’s equipment drawings.

Project(s):
- Design of a compounding plant with a by-product of polyethylene and benzene for MBJ.


Feb. 1997 – March 1998
Piping Designer I
Bugshan, Stone and Webster
Al-Khobar, Saudi Arabia

Assigned to:
Saudi Petrochemical Co. (SADAF)
Piping CADD Designer (PMT)

Prepare piping layout, isometric drawings, pipe support details and material take-off. Update P&ID and piping drawings using Microstation. Prepare routing for various piping modifications. Assist project engineer in test package preparation and design change notice (DCN).

Project(s):
- Modernization of product distribution facilities (East and West Area-ARAMCO) – (Design)
- Expansion of MTBE and ETBE (SADAF) – (Design & Construction)


Apr. –Oct. 1996
Piping Supervisor
Chiyoda Corporation
Ras Laffan, Qatar

Prepare hydrotest package, punch lists report and construction supervision for piping works. Coordinate with contractor for design changes, material requisition and technical queries. Check pipe fabrication to avoid clashing and interfering with other structures. Update P&ID and piping plan based on actual condition using AutoCad. Implement HSE procedures to avoid major incidents. Liaise with client for the cleared punch list prior to completion.

Project(s):
- Construction of Liquefied Natural Gas (LNG) Plant for QATARGAS – (EPCM)

Oct. 1991- Feb. 1996
Piping Designer I
Petrocon Arabia Limited
(formerly Eagleton Saudi Arabia Ltd.)
Al-Khobar, Saudi Arabia

Prepare detailed design and drafting works particularly on piping such as plan and profiles, piping plan, isometrics and other related drawings for both onshore and offshore. Perform line checking and preparing as-built drawings after consolidation of mark-ups and comments. Updating of P& ID and other related drawings using MicroStation.

Project(s):
- Various ARAMCO wellhead pipeline covering flowlines, trunklines, testlines and water injections
- As-built of Abqaiq Refinery (Phase 1 & 2)
- Maintain Potential Project (MPP-Offshore Platform) – (Design)


Dec. 1992 – Apr. 1994
Piping Design Draftsman
Offshore Pipeline Maritime Industrial Co. (OPMI)
(Seconded basis by Petrocon Arabia Ltd.)

Prepare fabrication drawings and material take-off. Develop isometric drawings for piping design changes. Review material take-off and isometric drawings against piping plan. Check pipe spool fabrication. Update P&ID based on actual condition. Design special pipe support as required.

Project(s):
- Marjan & Zuluf New Tie-in Platforms (MNTP-1 and ZNTP-1), Saudi Arabia – (Construction)
- Bukha Petroleum Offshore Platform, Oman – (Construction)
- QGPC Offshore Platform, Qatar – (Construction)


Apr. 1989 – Oct. 1991
Mechanical Draftsman II
DCCD Engineering Corporation
Makati City, Philippines

Prepare mechanical drawings (HVAC, fire protection and sanitary piping). Develop piping isometric together with material take-off. Site activities as require.

Project)s):
- Various 5-star hotels, commercial complex, office buildings and airports.

Comments/ Hobbies/ Interests etc:
interested in the latest technology with regards to my profession


Last Updated on 21-Feb-11



-- End of CV/Resume --



Full CV/Resume available to paid companies/recruiters as an attachment

If you would like to contact this person, you will need to purchase
access to our CV/Resume database.

Please contact our sales department for pricing

sales@expatjob.net



www.expatengineer.net, International Expat Engineering Jobs | Engineering Job Vacancies | Site Map