| |
|
| Ref # |  | JS99521 |
| Year of birth |  | 1964 |
Permanent/Home Location/Address |
| City or Town |  | ARAYAT |
| State |  | 2012 |
| Country |  | PHILIPPINES |
Current Location/Address |
| Country |  | MALAYSIA |
Languages |
| Primary Language |  | Fluency |
| Tagalog |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | PHILIPPINES |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Piping Designers |  | 17 |
| Industry |  | Years Experience |
| Oil and Gas |  | 16 |
| Mining |  | 1 |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | INDUSTRIAL TECHNOLOGY | EARIST, PHILIPPINES | 1987 |
| Trade Qualifications | TECHNICAL DRAFTING | EARIST, PHILIPPINES | 1985 |
|
Computer Skills and Software Used |
| Software used includes Plant Space Design Series (PSDS 3D Microstation Triforma v8), Pipe Support Modeler, AutoCad (Rel. 14, 2005 & 2006), Microstation, Smart Plan Review (SPR), AutoPlant Explorer, Windows (Word, Excel and Access) |
Work Locations |
| Are you willing to move or relocate? | Countries NOT Willing To Work In! |
| Yes - I will travel internationally | - West Africa
- North Africa
|
Availability |
| Start Immediately? |  | Available Now |
| Earliest Start Date |  | Given 2 weeks notice |
Ideal Next Job |
| PIPING DESIGNER / CHECKER, CONSTRUCTION SUPERVISOR, CLIENT SITE REP., PMT |
Required Salary & Conditions |
| USD40-45/hr. or USD4,000-ABOVE |
Employment History |
| Total Years of Work Experience: |  | 23 |
| Commenced Full Time Work: |  | 1989 |
| Name |  | AKER Solutions Malaysia Sdn. Bhd. |
| Job Title: |  | Sr. Piping Designer |
| Duration |  | From : 2010 To: |
Summary |
With 17 years piping design and construction experience for onshore/offshore facilities, skidded process systems and topsides for clients such as Shell, Petrobras, MODEC, Petronas, BP, Saudi Aramco, Petrokemya, ExxonMobil, Mutineer & Exeter, CNOOC and Qatar Petroleum.
Proven piping design prior to fabrication and construction, construction supervision and involvement with project management team/client support representative.
|
Work Experience |
Nov. 2010 - Present
Sr. Piping Designer
AKER Engineering Malaysia Sdn. Bhd.
(seconded basis under Composite Dynamic Sdn. Bhd.))
Worked as Client Site Representative (CSR) to provide engineering support and resolved queries and discrepancies between design and construction. Review pipe routing to check clashes using Plant Design Review. Provide pipe re-routing sketches, additional pipe supports and other related drawings prior to fabrication. Provide construction supervision as required.
Project(s):
-ICPR – Process Platform for ONGC (fabrication located in Indonesia)
April 2009 – Oct. 2010
Piping Design Engineer / Checker
Malaysia Marine & Heavy Eng’g.
(formerly Malaysia Shipyard & Eng’g.)
(seconded basis under Azdaman Eng’g. Sdn. Bhd.)
Check and ensure that all piping deliverables (isometrics, MTO and pipe support drawings) from consultants (WorleyParsons (HULL) and Technip (TOPSIDE)) are consistent and based on project specifications prior to fabrication and construction. Review and revised pipe routing, pipe support drawings and pipe spooling based on DCN requirements. Field verify discrepancies between engineering and construction. Monitor daily activities of PDMS designers as well as work progress.
Project(s):
-Gumusut/Kakap Semi-Submersible Floating Production System (FPS) for SHELL International Exploration and Production (SIEP)
March 2008 - March 2009
Sr. Piping Designer
HATCH Africa (Pty) Ltd.
Johannesburg, South Africa
Prepare piping layout, piping isometrics, material take off and rerouting of piping using Plant Space Design Series (PSDS-3D Plant Design Series Modeling, Microstation v8). Review piping routing done by designers from other HATCH global offices. Assist lead engineer in solving discrepancies between engineering and construction. Prepare pipe support design and 3D model using Pipe Support Modeler. Check and ensure that all piping deliverables are consistent and based on project specifications.
Project(s):
-Anglo Platinum Expansion Project for Rustenburg Base Metal Refiners (Pty) Ltd.-(EPC)
June – Nov. 2007 (Project Hire)
Sr. Piping Design Checker
Bechtel Int’l (Thailand) Ltd.
(Seconded basis under The Consultants, UK)
Review and check piping drawings prior to fabrication and construction. Prepare demolition and tie-in drawings, isometrics and material take off. Assist lead engineer in solving discrepancies between engineering and construction. Field verified new tie-ins on existing lines. Ensure all deliverables are consistent and based on project specifications. Lead CADD draftsmen for incorporating of data to existing drawings.
Project(s):
-TPX Revamp Project for ThaiOil and Thai Lube, Sriracha, Thailand – (EPC)
Jan. – June 2007 (Project Hire)
Sr. Piping Engineer
WorleyParsons (Thailand) Ltd.
(Seconded basis under Technilink (Singapore)Pte. Ltd.)
Responsible in preparing piping layout, equipment layout and tie-in locations, pipe support details, isometrics and material take-off base on project scope of work (SOW). Review and check piping model using AutoPlant Explorer. Assist lead engineers in reviewing deliverables, vendor drawings, hook-up drawings, data sheets and other documents prior to final submission. Monitor daily progress and PDMS activities.
Project(s):
- Funan Water Injection Platform for Chevron, Thailand – (Design)
Feb. – Nov. 2006
Sr. Facilities / Piping Designer (Offshore Dept.) (Project Hire)
Qatar Petroleum (Ras Abu Abboud, Doha, Qatar)
(Seconded basis under IPEDEX Production-AMEC SPIE, Abu Dhabi)
Prepare conceptual designs, piping layout, tie-in locations, pipe support details, isometrics and material take-off using AutoCad 2006. Verify and update P&ID’s, piping plans and isometrics based on the comments and as-built. Retrieve existing drawings to be used for new tie-ins using Technical Data Management System (TDMS).
Project(s):
- Various wellhead tie-ins on production platforms (PS-2 and PS-3) Bul Hanine & Maydan Mahzam - (Rehabilitation and permanent hook-up of existing and new wellheads-Design)
Aug. 2003 – Feb. 2006
Piping Design Engineer/Lead Piping Designer
AKERKVAERNER Process Systems Asia Pac Sdn. Bhd.
(Seconded basis under Laksana Spektrum Sdn. Bhd.), Malaysia
Responsible in producing piping layout, equipment layout and tie-in locations, pipe support details, isometrics and material take-off. Assists project engineers in material selections, preparation of data sheets and technical query from the client. Lead a group of drafting personnel for piping CADD works. Check and monitor progress of piping on drafting and fabrication works. Site activities as required for the new tie-ins. Review vendor’s equipment drawings. Prepare and directly report to Engineering Manager for piping design progress.
Project(s):
- Various process packages for FPSO and offshore platforms such as TEG, MEG, water injection, fuel gas, nitrogen, chemical injection and separator skids for Shell, Petrobras, Petronas, Saipem, CNOOC, MES, Talisman, Otway, ERHA, Mutineer & Exeter and Qatar Petroleum. – (Design and Fabrication)
July 2002 – July 2003
Sr. Piping Designer / Constr. Piping Engineer (Client Site Representative)
AkerKvaerner Petrominco Eng’g. Sdn. Bhd.
(Seconded basis under Laksana Spektrum Sdn. Bhd.), Malaysia
Involved in FEED to developed piping plan, equipment locations, pipe support details and location. Review isometrics and material take-off generated from PDS. Coordinate with other disciplines for interfacing connections. Assist PDS operators to achieve design correctness and requirements. Assigned to BP Petronas Acetyls as Construction Piping Engineer-CSR to assists contractor on design changes, interferences, material requisitions and technical queries.
Project(s):
- Bunga Raya-A (BR-A) topside platform for Talisman, Malaysia – (Design)
- BP Petronas Acetyls Sdn. Bhd. (TAR & Debottleneck Proj.), Terengganu, Malaysia – (Constr.)
Feb. 2002 – July 2002
Piping Engineer I
C & E Corporation
(Chiyoda – EEI Philippines)
Pasig City, Philippines
Prepare piping layout, pipe support locations and details. Design checking from PDS using Smart Plan Review (SPR). Review isometric drawings and material take-off generated from PDS. Assist project engineer in reviewing vendor’s equipment drawings and incorporating client’s comments.
Project(s):
- Ras Laffan Liquified Natural Gas (LNG) Expansion Project Train 3 for QGPC – (EPIC)
April – Nov. 2001 (Project Hire)
Design Checker
ABB-Lummus Alireza Ltd. Co.
Al-Khobar, Saudi Arabia
Review/check piping layout, equipment layout and pipe support design based on client’s requirements. Prepare piping layout and pipe support design as required. Supervision and monitoring of site activities for the new piping tie-ins, resolved technical queries and walk-thru with clients prior to pre-commissioning.
Project(s):
- Detailed designed of Neat Khuff Condensate (ARAMCO-Abqaiq/Ras Tanurah) – (Design)
- Upgrading of Ras Tanurah North Pier Shipping Wharves (ARAMCO-Ras Tanurah) – (Constr.)
Aug. 1999 – Aug. 2000
Piping Engineer (PMT)
Saudi Arabian PARSONS Ltd.
Jubail, Saudi Arabia
Involved in project management team (PMT) for Petrokemya to verify and monitor all the piping works. Coordinate with contractor on material requisitions, design changes, technical queries and pipe spool fabrication. Liaise with client and contractor for the cleared punch list prior to pre- commissioning.
Project(s):
- Construction of Petrokemya’s Olefins III Plant (Jubail, Saudi Arabia) – (EPCM)
May 1998 – July 1999
Mechanical Design Engineer
Halliburton, Brown and Root (Thailand) Ltd.
(thru Technilink (Thailand) Ltd.), Rayong, Thailand
Involved in FEED to developed piping layout, equipment layout and isometric drawings. Prepare preliminary piping and equipment layout for client’s approval. Lead drafting personnel to achieved basic design requirements. Review vendor’s equipment drawings.
Project(s):
- Design of a compounding plant with a by-product of polyethylene and benzene for MBJ.
Feb. 1997 – March 1998
Piping Designer I
Bugshan, Stone and Webster
Al-Khobar, Saudi Arabia
Assigned to:
Saudi Petrochemical Co. (SADAF)
Piping CADD Designer (PMT)
Prepare piping layout, isometric drawings, pipe support details and material take-off. Update P&ID and piping drawings using Microstation. Prepare routing for various piping modifications. Assist project engineer in test package preparation and design change notice (DCN).
Project(s):
- Modernization of product distribution facilities (East and West Area-ARAMCO) – (Design)
- Expansion of MTBE and ETBE (SADAF) – (Design & Construction)
Apr. –Oct. 1996
Piping Supervisor
Chiyoda Corporation
Ras Laffan, Qatar
Prepare hydrotest package, punch lists report and construction supervision for piping works. Coordinate with contractor for design changes, material requisition and technical queries. Check pipe fabrication to avoid clashing and interfering with other structures. Update P&ID and piping plan based on actual condition using AutoCad. Implement HSE procedures to avoid major incidents. Liaise with client for the cleared punch list prior to completion.
Project(s):
- Construction of Liquefied Natural Gas (LNG) Plant for QATARGAS – (EPCM)
Oct. 1991- Feb. 1996
Piping Designer I
Petrocon Arabia Limited
(formerly Eagleton Saudi Arabia Ltd.)
Al-Khobar, Saudi Arabia
Prepare detailed design and drafting works particularly on piping such as plan and profiles, piping plan, isometrics and other related drawings for both onshore and offshore. Perform line checking and preparing as-built drawings after consolidation of mark-ups and comments. Updating of P& ID and other related drawings using MicroStation.
Project(s):
- Various ARAMCO wellhead pipeline covering flowlines, trunklines, testlines and water injections
- As-built of Abqaiq Refinery (Phase 1 & 2)
- Maintain Potential Project (MPP-Offshore Platform) – (Design)
Dec. 1992 – Apr. 1994
Piping Design Draftsman
Offshore Pipeline Maritime Industrial Co. (OPMI)
(Seconded basis by Petrocon Arabia Ltd.)
Prepare fabrication drawings and material take-off. Develop isometric drawings for piping design changes. Review material take-off and isometric drawings against piping plan. Check pipe spool fabrication. Update P&ID based on actual condition. Design special pipe support as required.
Project(s):
- Marjan & Zuluf New Tie-in Platforms (MNTP-1 and ZNTP-1), Saudi Arabia – (Construction)
- Bukha Petroleum Offshore Platform, Oman – (Construction)
- QGPC Offshore Platform, Qatar – (Construction)
Apr. 1989 – Oct. 1991
Mechanical Draftsman II
DCCD Engineering Corporation
Makati City, Philippines
Prepare mechanical drawings (HVAC, fire protection and sanitary piping). Develop piping isometric together with material take-off. Site activities as require.
Project)s):
- Various 5-star hotels, commercial complex, office buildings and airports.
|
Comments/ Hobbies/ Interests etc: |
| interested in the latest technology with regards to my profession |
Last Updated on 21-Feb-11
|