| Ref # |  | JS95002 |
| Year of birth |  | 1955 |
Current Location/Address |
| City or Town |  | Pitesti |
| State |  | 110043 |
| Country |  | ROMANIA |
Permanent/Home Location/Address |
| City or Town |  | Al -Jubail |
| Country |  | SAUDI ARABIA |
Languages |
| Primary Language |  | Fluency |
| Other |  | Read, write and speak fluently |
Nationalities |
| Nationality |  | ROMANIA |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Field Superintendent |  | 30+ |
| Area Superintendent |  | 15 |
| Commissioning Manager |  | 5 |
|  | |
|  | |
| Industry |  | Years Experience |
| Oil and Gas |  | 30+ |
|  | |
|  | |
|  | |
|  | |
Qualifications |
| Highest Qualifications |  | Masters |
| Qualification | Subject | Establishment/Country | Year |
| Masters or Higher | Chemical engineer | Romania | 1980 |
|
Work Locations |
| Are you willing to move or relocate? | Countries NOT Willing To Work In! |
Yes - I will travel internationally
Yes - I will relocate internationally | AFGHANISTAN
IRAQ
IRAN
ALGERIA |
Availability |
| Start Immediately? |  | Available Now |
| Earliest Start Date |  | Given 1 weeks notice |
Ideal Next Job |
Commissioning (production) Superintendent oil & gas
open to all offers |
Required Salary & Conditions |
| 500 Euro/day |
Employment History |
| Total Years of Work Experience: |  | 32 |
| Commenced Full Time Work: |  | 1980 |
| Job Title: |  | Production Superintendent |
| Duration |  | From : 2003 To: 2008 |
Summary |
June 2006-June 2008 Process production Superintendent for
PRC Career-Holdings,Kazakhstan,
Karachaganak Development Project
Aksai,KAZAKHSTAN
I coordinated all the activities in Process Water
Treatment,Slop Oil,Closed Drain,Flare System,
Fire Water,Potable Water,Demin Water,Instrumental
Air,Nitrogen System,Steam Condensate System
Fuel Gas System,Incinerators
Sep.2003-June.2006 Process production Supervisor for
Dietsmann S.p.a Italy, Karachaganak
Development Project, Aksai
KAZAKHSTAN
In this position I have commissioned and started up
the Condensate Splitter,Condensate Stabilisation,
Fuel Gas Sweetening and Amine Regeneration,Fuel
Gas Dehydration and Dew Point Control,LP and MP
Sour Gas Dehydration and Dew Point Control and
Process Water Treatment and after that I coordinated
all the activities in process area.
Feb.2003-Sep.2003 Commissioning, start-up and operation for Snamprogetti S.p.a ( Italy ) NGL4 Project Messaied-Dukhan
QATAR
I have participated effectively at start-up and normal
operation, supervising the activity on control room,DCS Honeywell TDC 3000 GUS,as DCS supervisor
Apr.2001-Oct.2002 Commissioning, start-up and operation for ABB LUMMUS GLOBAL Inc. (U.S.A), Ethylene Plant,140,000 MTA, Shurtan Gas Chemical Complex Project , Shurtan , UZBEKISTAN
At this position, commissioning specialist, I have elaborated procedures, supervision for precommissioning works made by subcontractors for following areas Utilities, Hot section, Cold section and Off-Sites, for following activities:
-washing, blowing of the units circuits
-chemical washing of compressors circuits and equipment’s
-equipment inspection: vessels, columns and tanks
-instrument loops checking and testing of PLC, ESD,DCS logic’s for compressors, dryers system boilers furnaces and other equipment’s (pumps, fans etc)
I have participated effectively at start-up and normal operation, operating on panel, DCS Honeywell TDC 3000 GUS.
Aug.2000-Feb.2001 DCS specialist for PETRONAS GAS BERHAD, MALAYSIA, Gas Processing Plant Complex B, Kg.ToK , Arun , Paka , Terengganu Darul Iman, MALAYSIA
At this position I have supervised the activity on contol room ,DCS Foxboro system..
Also, trained Malaysian operators for normal operation, keep in operation, troubleshoot, organize process, and improve efficiency.
Jun.1998–Jun.2000 Commissioning, start-up and operation for SNAMPROGETTI S.p.a.,ITALY, Peninsular Gas Utilisation Project GPP 5 & 6, Pipelines and Marine Terminal, Paka , Terengganu Darul Iman , MALAYSIA
Performing the pre-commissioning, commissioning and start-up operations (including client’s personnel training on DCS Foxboro).
At this position I have participated at test-run and normal operation of the units, up to hand over, and my major responsibilities have been:
-knowledge of start-up and shut-down procedures of the units
-after start-up, tuning of instruments in collaboration with instrument Department
-during the test run of the units to maintain the parameters and the products quality as per designer instructions
-after test-run I was involved in Manuals Instruction upgrading activity
Oct.1997-May.1998 Process engineer for TRE PI S.p.A. (ITALY) in operation of Hard Bitumen Plant ( TRE PI project) 100,000 t/y, Alexandria Petroleum Company
ARABIC REPUBLIC OF EGYPT.
At this position I have coordinated the start-up of the plant and the test run. Scheduled assembly activities, analysed and identified the alternatives, prepare punch lists and system hand-over/acceptance.
Feb.1997–Sep.1997 Commissioning engineer for TRE PI S.p.A. /EMCO Ltd. (THAILAND) Limited Joint Venture( TRE JV ), PTT Lumlukka Oil Depot Project, Patumtanee , THAILAND.
Involved in some technical/technological modifications of this depot to improve final products yields and qualities.
Sept.1996-Feb.1997 Start up superintendent for TRE PI S.p.A. (ITALY) ,APC Hard Bitumen Plant ( TRE PI project), 100,000 t/y, Alexandria Petroleum Company,
ARABIC REPUBLIC OF EGYPT.
At this position I have coordinated all the activities regarding commissioning of this plant. I elaborated procedures, I issued the works program, monitored erection works, coordinated hydro testing, pneumatic tests and chemical cleaning, trained the personnel how to start,etc.
May 1996-Aug.1996 Commissioning and start up for ABB LUMMUS GLOBALINC. (U.S.A.), CTIP (ITALY) Olefins Plant project,(ABB LUMMUS License), 140,000 MTA Ethylene Steam Cracker, Puyang, Henan Province
PEOPLE’S REPUBLIC OF CHINA
Commissioning specialist involved in commissioning, start-up and operations of Steam Generation Unit, Boiler Feed Water Treatment, Cracking Furnaces, Gas Columns, Cracked Gas Compressor, Sulphur Removal System, Dryers, Cold Box, Separations Systems, and Refrigeration Systems. Responsible for routine inspection, checking and adjusting parameters.
May 1994-Feb.1996 Commissioning, start up and operation with CHIYODA Nigeria Ltd. (JAPAN), EPCL project,(M.W.KELLOG License), 300,000 MTA Ethylene, Ethylene Steam Cracker, Port Harcourt, NIGERIA.
Performed the pre-commissioning, commissioning, start-up and initial operations on the hot section ,as field supervisor . Closely cooperated with I.F.P. and M.W.KELLOG’Sspecialists. Trained Nigerian operators for the start-up and initial operations. Also, I worked on DCS Yokogawa System.
Sept.1980-May1994 Worked in SC ARPECHIM SA PITESTI, ROMANIA.
Jun.1991-May1994 Technical superintendent in Ethylic Derivatives Section. This section was made up of three plants that use ethylene as feed supply: Ethylene oxide, Ethyl benzene and Ethylic Alcohol plus Toluendesalkilation.
Analyzing the technological performances of the plants and establishing proper measures to increase them. Participating in the activities of technological analysis, fault detection and solving, to ensure compliance with the designed parameters. Proposing technical solutions for the solving same technological problems and improving of the technological process.
Sept.1987–Jun.1991 Shift superintendent in Olefins Plant. Attended to start up of Olefins Plant in SC PETROMIDIA Năvodari (LURGI License) , 200,000 MTA Ethylene Steam Crackers.
At this position I was responsible with:
-the technological survey of the plant. I lead a team of 60 employees, that is: 5 foremen, 25 panel operators and 30 field operators.
-the quality assurance, according ISO 9002.
-I issued/approved the projects that have a result the reduction of costs, material and energy consummations and the growth of plant’s efficiency in the safety conditions.
-I prepared all papers work for technical improvements for all projects or for different changes which can bring economy or safety for all equipment
-I was involved in all feasibility studies, concerning the plant.
-preparing operation and maintenance for all new equipment that are mounted.
-during annual remounts and repairs I issued the works program that consists of the main revisions and repairs that must be done in the plant.
-I prepared the schedule for the normal shut down of the plant, the blind plan of all ends and I prepared the schedule for all steaming and cleaning for equipment and piping.
-I supervised all maintenance and repair works, I inspected all plant’s equipment and I supervised all tests done after revisions and repairs.
-when the revisions and the repairs are ended I prepared the schedule for starting -up of the plant.
Sept.1985-Aug.1987 Chief engineer in Cyanide Chloride Plant.
During this period I received two innovations
patents.
Sept 1983-Aug.1985 Chief engineer in Tertbutylamine Plant
During this period I received an innovation patent.
Sept.1982-Aug.1983 Foreman in Tertbutylamine Plant
Sept.1980-Aug.1982 Engineer in probation period in Acrylonitril
plant
|
Work Experience |
Apr.2010- May.2011 Senior consultant ,LIBOR Consulting ,Pitesti,Romania
The company performs professional brokerage and consulting services for chemical products, market studies.
Sept.2009- Mar.2010 Commissioning and Start up Superintendent for SHAW STONE & WEBSTER ARABIA CO.LTD SHARQ 3rd Expansion Ethylene Project, Al-Jubail, KINGDOM OF SAUDI ARABIA
Commisioning activities in hot section and coordinated start up of cold section,light separation.(HP/LP Deethanizer,C2 Hydrogenation,Demethanizer,Cold box,C2 Splitter,C2 Refrigeration compressor,C3 Refrigeration compressor )
Sept.2008- July 2009 General Precommissioning Superintendent for Aker Solutions Gulf, Saudi Yansab Polyolefin’s Project, Yanbu, KINGDOM OF SAUDI ARABIA
Coordinating all the pre-commissioning and commissioning activities for Polypropylene plant LLDPE and PHU (punch lists, inspecting the equipments, chemical cleaning of the lines, flushing the lines, purging the lines, blowing the lines, leak test, check sheets, extruder’s trial, starting all the compressors, starting all the incinerators put in service all the utilities ).Liaise with vendors, manufacturers and contractors for engineering problems. Support all issues that came up during precommissioning and commissioning.Participating together with HSE to the evaluation of the safety aspects during the project, Risk Assessments meeting.Reporting to the site project management on regular basis about contract development. Attend meetings with contractors and customer and participate with Project Team to the debate on the Site Management Execution
June 2006-June 2008 Process production Superintendent for PRC Career-Holdings, Kazakhstan Karachaganak Development Project Aksai, KAZAKHSTAN Coordinating all the activities in Process Water Treatment, Slop Oil, Closed Drain, Flare System Fire Water, Potable Water, Demin Water, Instrumental Air, Nitrogen System,Steam Condensate System Fuel Gas System, Incinerators
Sep.2003-June.2006 Process production Supervisor for Dietsmann S.p.a Italy, Karachaganak Development Project, Aksai, KAZAKHSTAN
Commissioning and start up the Condensate Splitter, Condensate Stabilisation,
Fuel Gas Sweetening and Amine Regeneration, Fuel Gas Dehydration and Dew Point Control, LP and MP Sour Gas Dehydration and Dew Point Control and Process Water Treatment and after that coordinating all the activities in process area.
Feb.2003-Sep.2003 Commissioning, start-up and operation consultant for Snamprogetti S.p.a (Italy) NGL4 Dukhan, QATAR
Participating effectively at start-up and normal operation, supervising the activity on control room, DCS Honeywell TDC 3000 GUS, as DCS supervisor
Apr.2001-Oct.2002 Commissioning, start-up and operation for ABB LUMMUS GLOBAL Inc.(U.S.A), Ethylene Plant,140,000MTA,Shurtan Gas Chemical Complex Project ,UZBEKISTAN
Elaborating, procedures, supervision for precommissioning works made by subcontractors for
following areas Utilities, Hot section, Cold section, and Off-Sites, for following activities:
washing, blowing of the units circuits; chemical washing of compressors circuits and equipment’s
equipment inspection: vessels, columns and tanks ; instrument loops checking and testing of PLC, ESD,DCS logic’s for compressors, dryers system boilers furnaces and other equipment’s
(pumps, fans etc). Participating effectively at start-up and normal operation, operating on panel, DCS Honeywell TDC 3000 GUS.
Aug.2000-Feb.2001 DCS specialist for PETRONAS GAS BERHAD,MALAYSIA, Gas Processing Plant Complex B,Kg.ToK Arun , Paka , Terengganu, Darul Iman, MALAYSIA
Supervising the activity on control room, DCS Foxboro system. Also, training Malaysian operators for normal operation, keep in operation, troubleshoot, organize process, and improve efficiency.
Jun.1998–Jun.2000 Commissioning, start-up and operation for SNAMPROGETTI S.p.a., ITALY Peninsular Gas Utilisation Project GPP 5 & 6, Pipelines and Marine Terminal,Paka , Terengganu, Darul Iman , MALAYSIA
Performing the pre-commissioning, commissioning and start-up operations (including client’s personnel training on DCS Foxboro). Participating at test-run and normal operation of the units, up to hand over and my major responsibilities have been: knowledge of start-up and shut-down procedures of the units; after start-up, tuning of instruments in collaboration with instrument
Department; during the test run of the units to maintain the parameters and the products quality as per designer instructions ; after test-run I was involved in Manuals Instruction upgrading activity
Oct.1997-May.1998 Process engineer for TRE PI S.p.A. (ITALY) in operation of Hard Bitumen Plant (TRE PI project) 100,000 t/y, Alexandria Petroleum Company, ARABIC REPUBLIC OF EGYPT
Coordinating the start-up of the plant and the test run. Scheduling assembly activities, analysed
and identified the alternatives, prepare punch lists and system hand-over/acceptance.
Feb.1997–Sep.1997 Commissioning engineer for TRE PI S.p.A. /EMCO Ltd. (THAILAND) Limited Joint Venture (TRE JV), PTT Lumlukka Oil Depot Project, Patumtanee, THAILAND.
Involved in some technical/technological modifications of this depot to improve final products yields and qualities.
Sept.1996-Feb.1997 Start up superintendent for TRE PI S.p.A. (ITALY) APC Hard Bitumen Plant (TRE PI project), 100,000 t/y, Alexandria Petroleum Company, ARABIC REPUBLIC OF EGYPT.
Coordinating all the activities regarding commissioning of this plant. elaborating procedures, issuing the works, program, monitoring, erection, works, coordinating, hydro testing, pneumatic tests and chemical cleaning, training the personnel how to start, etc
May 1996-Aug.1996 Commissioning and start up for ABB LUMMUS GLOBALINC. (U.S.A.), CTIP (ITALY) Olefins Plant project, (ABB LUMMUS License), 140,000 MTA
Ethylene Steam Cracker, Puyang, Henan Province PEOPLE’S REPUBLIC OF CHINA
Commissioning specialist involved in commissioning, start-up and operations of Steam Generation Unit, Boiler Feed Water Treatment Cracking Furnaces, Gas Columns, Cracked Gas
Compressor, Sulphur Removal System, Dryers, Cold Box, Separations Systems, and Refrigeration Systems. Responsible for routine inspection, checking and adjusting parameters.
May 1994-Feb.1996 Commissioning, start up and operation with CHIYODA Nigeria Ltd. (JAPAN), EPCLproject, (M.W.KELLOG License) 300,000 MTA Ethylene, Ethylene Steam Cracker, Port Harcourt, NIGERIA.
Performed the pre-commissioning, commissioning, start-up and initial operations on the hot section, as field supervisor. Closely cooperated with I.F.P. and M.W.KELLOG’Sspecialists
Training Nigerian operators for the start-up and initial operations. Also, I worked on DCS Yokogawa System.
Sept.1980-May1994 Worked in SC ARPECHIM SA PITESTI, ROMANIA
Jun.1991-May1994 Technical superintendent in Ethylic Derivatives Section (Ethylene oxide, Ethyl benzene and Ethylic Alcohol plus Toluendesalkilation )
Analyzing the technological performances of the plants and establishing proper measures
to increase them. Participating in the activities of technological analysis, fault detection
and solving, to ensure compliance with the designed parameters.
Sept.1987–Jun.1991 Shift superintendent in Olefins Plant. Attended to start up of Olefins Plant in SC.PETROMIDIA Năvodari (LURGI License),200,000MTA Ethylene Steam Crackers.
At this position I was responsible with: the technological survey of the plant ; the quality assurance, according ISO 9002; issuing/approving the projects that have a result the reduction of costs, material and energy consummations and the growth of plant’s efficiency in the safety conditions; preparing all papers work for technical improvements for all projects or for different changes which can bring economy or safety for all equipment.
Sept.1985-Aug.1987 Chief engineer in Cyanide Chloride Plant. During this period I received two innovations patents.
Sept 1983-Aug.1985 Chief engineer in Tertbutylamine Plant During this period I received an innovation patent.
Sept.1982-Aug.1983 Foreman in Tertbutylamine Plant
Sept.1980-Aug.1982 Engineer in probation period in Acrylonitril plant
|
 |  |  |
 |  |  |
 |  |  |
Last Updated on 01-Sep-11
-- End of CV/Resume --