| |
|
| Year of birth |  | 1960 |
Permanent/Home Location/Address |
| City or Town |  | Bromley |
| State |  | BR2 7QP |
| Country |  | UK |
Current Location/Address |
| Country |  | UK |
Languages |
| Primary Language |  | Fluency |
| English |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | UK |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Piping Designers |  | 28 |
| CAD Designers |  | 25 |
| Industry |  | Years Experience |
| Oil and Gas |  | 28 |
Qualifications |
| Highest Qualifications |  | HNC/Certificate |
| Qualification | Subject | Establishment/Country | Year |
| HNC/ONC/Certificate | Mechanical | South East London Technical College, UK | 1981 |
|
Computer Skills and Software Used |
| PDMS Modelling |
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will travel domestically
Yes - I will relocate domestically
Yes - I will travel internationally
Yes - I will relocate internationally |  |
Availability |
| Earliest Start Date |  | Given 1 weeks notice |
Ideal Next Job |
| Senior Piping Designer - PDMS |
Required Salary & Conditions |
| Negotiable |
Employment History |
| Total Years of Work Experience: |  | 34 |
| Commenced Full Time Work: |  | 1976 |
| Name |  | Kellogg Brown and Root Limited |
| Job Title: |  | Senior Piping Designer |
| Duration |  | From : 2002 To: 2008 |
Summary |
CAREER SUMMARY
KELLOGG BROWN AND ROOT, LEATHERHEAD, SURREY
Dates: 2008 to date
Position: Senior Piping Designer
Project: Gorgon Project, Barrow Island LNG Plant (Feed Phase)
Client: Chevron Australia Pty Ltd
Using PDMS for the following:-
To layout and model Structural Steelwork, Equipment, Piping and Escape Routes for the feed phase of the Inlet Processing Modules Gorgon and Jansz along with there associated Battery Limit Valve Stations.
KELLOGG BROWN AND ROOT, BAKU, AZERBAIJAN
Dates: 2004 to 2008
Position: Senior Piping Designer
Project: Central Azeri CW&P Platform
Client: BP/AIOC
Project: Deep Water Gunashli PCWU Platform
Client: BP/AIOC
Assigned to the ATA Yard, Baku, Azerbaijan to give technical assistance to the BP/AIOC/ATA site team for any problems with the design and construction of the CA C&WP and DWG PCWU Topsides.
Liaising between the Sutton design office and site on any technical issues that arise during construction and fabrication.
Using PDMS Draft to create GA’s, System Isometrics for hydrotesting and isometric views to assist in the construction and fabrication of the platforms for all disciplines.
Vendor Coordination for the offshore commissioning of the C&WP Platform.
Duties include raising Vendor Service Requests to put funds into the budget for vendor visits.
Raising and issuing Vendor Call-Out Notices, checking the vendor’s offshore certification, booking hotels, arranging meet and greets at the airport, making appointments for medical examinations and BOSIET courses.
Using PDMS to layout the temporary equipment and pipework for the onshore commissioning prior to sail away of the PCWU Topsides.
Equipment includes a Diesel Filter Storage Tank, Diesel Transfer Pump Package, Diesel Coalescer Package, Seawater Lift Pump Caisson Package and Seawater Coarse Filter Package.
Temporary commissioning pipework includes Diesel, Seawater, Instrument Air and Water Injection.
Using PDMS to layout and model pipework for the pre commissioning of the MOL Pumps and the commissioning of the Methanol Pump Package, the Fuel Gas Knockout Drum and the Fuel Gas Condensate Pump.
Using PDMS Draft to produce a Plot Plan for the temporary commissioning equipment, Piping Plans for the temporary commissioning pipework and fabrication isometrics.
Study undertaken to place West Chirag (Phase 4) Gas Pig Receiver, Water Injection Pig Launcher, Produced Water Pig Receiver and Gas Lift Pig Launcher onto PCWU Topsides.
Preliminary pipe routing undertaken from risers to launchers/receivers and from launchers/receivers to a future Slug Catcher, Water Injection Pump Discharge Manifold, Water Injection Pump Suction Manifold and Gas Lift Manifold
Project: Dew Point Control Unit 2, Sangachal Terminal, Salyan Highway, Azerbaijan
Position: Engineering Coordinator
Client: BP/AIOC
Interfacing with the BP/AIOC Construction, Commissioning and Operations Teams on a day to day basis to monitor, review and expedite engineering progress to ensure key deliverables are issued on time and key engineering milestones are met.
KELLOGG BROWN AND ROOT, SUTTON, SURREY
Dates: 2002 to 2003
Position: Senior Piping Designer
Project: West Azeri PDQ Platform
Client: BP/AIOC
Using PDMS for the following:-
To layout and model piping in the Bulk Tank Area (Cellar Deck)
Liaising with KCA (Drilling) for the routing of tie-ins to the Drilling Support Module and Derrick Equipment Set from topsides piping
Study on Diverter Overboard Line North and South.
Modeling of Equipment
KELLOGG BROWN AND ROOT, BAKU, AZERBAIJAN
Dates: 2002
Position: Senior Piping Designer
Project: ACG Full Field Development Phase 2/Brown Field
Client: BP/AIOC
Using PDMS for the following:-
To layout and model Piping in the Power Generation Area, Utilities Area, Off Spec Tank Area, Pig Receiver Area, Pipeline Corridor, Produced Water Storage Area and the Phase 1 Crude Oil Storage Tank Area.
Modeling of Equipment and Civils.
AMEC PROCESS AND ENERGY LTD, CROYDON
Dates: 2002
Position: Senior Piping Designer
Project: Piltun Astokhskoye Field Platform “PA-B”
Client: Sakhalin Energy Investment Co. Ltd
Using PDMS for the following:-
Study on the main Piperacks for the Lower Deck EL24400 and Upper Deck EL35400
ALSTOM POWER LIMITED, BADEN, SWITZERLAND
Dates: 1998 to 2002
Position: Senior Piping Designer
Project: Mizushima Combined Cycle Power Plant
Client: Kawasaki Heavy Industries Limited
Project: Chiba Mill Combined Cycle Power Plant
Client: Kawasaki Heavy Industries Limited
Project: Sarnia/Edmonton Regional Cogeneration Plant
Client: Transalta Energy
Using PDMS for the following:-
To layout and model piping in the Gas Turbine, Generator and Combustor Acoustic Enclosures.
To layout a proposal for the Gas Turbine, Generator and Combustor Acoustic Enclosures including Access Platforms, Ladders and Stairs.
Modelling of Equipment, HVAC, Cable Trays, Junction Boxes and Civils.
Production of Piping GA’s, Equipment GA’s, Junction Box Location Plans, Instrument Location Plans, Isometrics and Clash Check.
ABB LUMMUS GLOBAL GmbH, MAINZ-KASTEL, GERMANY
Dates: 1998
Position: Senior Piping Designer
Project: Shurtan Gas Chemical Complex
Client: National Corporation Uzbekneftegaz (UNG)
Using PDMS for the following:-
To layout and model piping in the Feed Saturator Area.
Modelling of Equipment, Structural Steelwork and Civils for the Feed Saturator Area.
Preparation of Equipment Nozzle Orientation Drawings.
Production of Isometrics, Clash Check and Piping General Arrangements
KVAERNER OIL AND GAS LIMITED, CROYDON, SURREY
Dates: 1997 to 1998
Position: Senior Piping Designer
Project: Eldfisk Water Injection Project (Conceptual Design)
Client: Philips Petroleum Company Norway
Using PDMS for the following:-
To layout and model Equipment, Structural Steelwork, Civils and Escape Routes for the finalisation of Plot Plans for the Hull Deck, Main Deck and Upper Deck.
Production of Plot Plans for the Hull Deck, Main Deck and Upper Deck
To layout and model piping for the Compression Area
Bulk MTO for weight control
Project: Triton FPSO – Abbot Field
Client: Amerada Hess Limited
Using PDMS for the following:-
To layout and model Piping and Equipment on the Utilities Pallet T0U1 and the Power Generation Pallets T0U2A and T0U2B.
To layout all Platforms and Support Structures on the Power Generation Pallet T0U2A in liaison with the Structural Department.
Production of Plot Plans for the Utilities Pallet T0U1, Power Generation Pallets T0U2A and T0U2B and the stern area T0U3 of the FPSO.
Liaising with vendors and marking up Vendor Drawings and the preparation of Nozzle Orientation Drawings for Equipment on the Utilities Pallet T0U1 and the Power Generation Pallets T0U2A and T0U2B.
SINGLE BUOY MOORINGS INC, FONTVIEILLE, MONACO
Dates: 1997
Position: Senior Piping Designer
Project: Laminaria and Corallina Development (FPSO Turret)
Client: Woodside Petroleum
Using PDMS for the following:-
To layout and model the Production Manifold, Test Manifold, Production Risers, Future Production Risers, Gas Lift Risers, Future Gas Lift Risers and Gas Injection Risers to the Swivel in the FPSO Turret.
ABB KRAFTWERKE AG, BADEN, SWITZERLAND
Dates: 1995 to 1997
Position: Senior Piping Designer
Project: Bao Shan Combined Cycle Power Plant
Client: Bao Steel KK
Using PDMS for the following:-
To layout and model piping in the Gas Turbine and Combustor Acoustic Enclosures
To layout a proposal for the Gas Turbine and Combustor Acoustic Enclosures including Access Platforms, Ladders and Stairs
Modelling of Equipment, HVAC, Cable Trays, Junction Boxes and Civils
Production of Piping GA’s, Equipment GA’s, Junction Box Location Plans, Instrument Location Plans, Isometrics and Clash Check.
ABB KESSELANLAGEN AG, WINTERTHUR, SWITZERLAND
Dates: 1995
Position: Senior Piping Designer
Project: Ludwigshafen Combined Cycle Power Plant
Client: RWE GmbH
Using PDMS for the following:-
To layout and model piping for the Forced Circulation Heat Recovery Steam Generators.
Modeling of Equipment, Structural Steelwork and Civils
AMEC PROCESS AND ENERGY LIMITED, LONDON
Dates: 1994 to 1995
Position: Senior Piping Designer
Project: Britannia Gas/Condensate Production Platform
Client: Conoco/Chevron Alliance
Using PDMS for the following:-
To layout and model Equipment for finalisation of Plot Plans for the Production Deck, Main Deck and Weather Deck.
Production of Plot Plans for the Production Deck, Main Deck and Weather Deck
COMPRIMO ENGINEERS AND CONSTRUCTORS BV, AMSTERDAM, THE NETHERLANDS
Dates: 1994
Position: Senior Piping Designer
Project: Phernis Oil Refinery
Client: Shell Netherlands Raffinaderij
Using PDMS for the following:-
To layout and model piping in the Battery Valve Limit Station, the East/West Piperack and the LP Steam Manifold.
Production of Isometrics and Clash Check
BAHRAIN NATIONAL OIL COMPANY, AWALI, BAHRAIN
Dates: 1993 to 1994
Position: Senior Piping Designer
Project: Bahrain National Oil Field Well Program
Client: Banoco
Field surveys for routing of piping from Oil Wells to Well Production Manifolds.
Design layout and draughting of Piping GA’s for Oil Flowing Wells, Gas Injection Wells and Intermittent Gas Injection Wells to Well Production Manifolds at Gas and Oil Separation Plants.
Design layout and draughting of Piping GA’s for Well Production Manifold Extensions at Gas and Oil Separation Plants.
Draughting of Isometrics.
JOHN BROWN ENGINEERS AND CONSTRUCTORS LIMITED, LONDON
Dates: 1992 to 1993
Position: Piping Designer
Project: North Morecombe Development Project
Client: British Gas Exploration and Production Limited
Using PDMS for the following:-
Modelling of Piping for Product Gas Compression Area, PAU51 and PAU52.
Production of Isometrics and Clash Check.
Assigned to site at Barrow in Furness for follow-on engineering.
AMEC ENGINEERING LIMITED, LONDON
Dates: 1990 to 1992
Position: Piping Designer
Project: East Brae Block 16/3a and 36 (UK)
Brae ‘E’ Production Platform
Client: Marathon Oil UK Limited
Using PDMS for the following:-
Modeling of Piping and Equipment in Module 02.
Responsible for the supervision and the running of AMEC’s own in house software package ‘PROCLASH’ (progressive clash checking program using the PDMS Module Clasher).
DOW CHEMICAL BV, ROTTERDAM, THE NETHERLANDS
Dates: 1989 to 1990
Position: Piping Designer
Project: Polycarbonate Production Building
Client: Dow Chemical BV
Using PDMS for the following:-
Modeling of Piping and Equipment.
Production of Isometrics and Clash Check.
LUMMUS CREST GmbH, WEISBADEN, WEST GERMANY
Dates: 1989
Position: Piping Designer
Project: Ethyl Benzene Dehydrogenation Unit
Client: Huels GmbH
Using PDMS for the following:-
To layout and model Piping and Equipment.
Modeling of Structural Steelwork and Civils.
Production of Plot Plans Isometrics, Clash Check and Piping GA’s
Checking Isometrics
BROWN AND ROOT VICKERS LIMITED, LONDON
Dates: 1988 to 1989
Position: Piping Designer
Project: Ravenspurn North Production Platform
Client: Hamilton Brothers Oil and Gas Limited
Using PDMS for the following:-
Modelling of Piping and Equipment.
Production of Isometrics, Clash Check Piping GA’s
MATTHEW HALL ENGINEERING LIMITED
Dates: 1988
Position: Piping Designer
Project: Leman 27/AC Camelot Reception Facilities
Leman ‘AC’ Cantilever Platform
Client: Amoco UK Exploration Company
Using PDMS for the following:-
Modelling of Piping, Equipment and Structural Steelwork.
Production of Plot Plans, Isometrics, Clash Check, Piping GA’s and Sections.
Offshore survey in the Leman 49/27 field on Platforms ‘AC’ and ‘AP’ for tie-in connections to the ‘AC’ Cantilever Platform
MCDERMOTT ENGINEERING LONDON LIMITED, WEMBLEY, MIDDLESEX
Dates: 1984 to 1987
Position: Piping Designer
Project: Alwyn North Project Block 3/9
Production Platform NAB
Client: Total Oil Marine PLC
Using PDMS for the following:-
Modeling Piping, Equipment and Structural Steelwork on the Module Support Frame.
Production of Isometrics, Clash Check Piping GA’s for the Module Support Frame.
Manually draughting Piping GA’s and Isometrics on Module 04
Project: Southern North Sea Gas Project
Cleeton Production and Quarters Platform
Client: BP Development Limited
Phoenix training course (intelligent 2D CAD System).
Using Phoenix to draft PFD’s, UFD’s, P&ID’s and U&ID’s.
Using PDMS for the following:-
Modeling Piping, Equipment, Structural Steelwork, HVAC and Cable Trays.
Production of Plot Plans, Isometrics, Clash Check and Piping GA’s
Assigned to site at William Press Offshore, Wallsend, Tyne and Wear for follow-on engineering
BABCOCK WOODHALL-DUCKHAMS LIMITED, CRAWLEY, SUSSEX
Dates: 1984
Position: Piping Designer
Project: Liquid Solvent Extraction Pilot Plant (Front End Design)
Client: National Coal Board
Using Schema to draft PFD’s UFD’s, P&ID’s and U&ID’s
Using PDMS for the following:-
Modeling Equipment, Structural Steelwork, Civils, and Piping
SHELL INTERNATIONAL PETROLEUM COMPANY LIMITED, LONDON
Dates: 1983 to 1984
Position: Piping Designer
Project: Shell Lubricants Centre, Stanlow, Essex
Client: Shell Oil UK
Using Schema to draft PFD’s UFD’s, P&ID’s, U&ID’s and Plant Layouts
Project: Mina Al Fahal Automated Lube Oil Blending Plant
Client: Oman Lubricants Company
PDMS training course
Using PDMS to model piping
MATTHEW HALL ENGINEERING LIMITED, LONDON
Dates: 1982 to 1983
Position: Flowsheet Draughtsman
Project: Brae ‘B’ Block 16/7a (UK) (Front End Design)
Client: Marathon Oil UK Limited
Using Dragon to draft PFD’s UFD’s, P&ID’s, and U&ID’s.
CE LUMMUS, LONDON
Dates: 1981 to 1982
Position: Piping Designer
Project: Fife Ethylene Project, Mossmorran, Scotland
Client: Esso Chemicals Limited
Petrochemical Contractor Group Training Scheme.
Dragon Training Course.
Using Dragon to draft PFD’s UFD’s, P&ID’s, and U&ID’s.
Draughting of Piping GA’s and Isometrics.
CHARLPORT MECHANICAL LIMITED, CROYDON, SURREY
Dates: 1980
Position: Mechanical Draughtsman
Draughting GA’s of Emergency Hydraulic Rudder Arrest Systems.
MUIRHEAD DATA COMMUNICATIONS LIMITED, BECKENHAM, KENT
Dates: 1979 to 1980
Position: Trainee Mechanical Fitter
FORUM ENGINEERING LIMITED, LONDON
Dates: 1977 to 1979
Position: Trainee Mechanical Fitter
ENGINEERING INDUSTRIAL TRAINING BOARD, CROYDON, SURREY
Dates: 1977 to 1979
Position: Trainee Engineering Technician
|
Work Experience |
DRAWING OFFICE EXPERIENCE
A total of 28 years experience as a Designer/Draughtsman on Offshore and Onshore projects in the following:-
Draughting and preparation of PFD’s, UFD’s, P&ID’s, U&ID’s, Plot Plans, Piping GA’s, Piping Design and Fabrication Isometrics, System Isometrics, Equipment Nozzle Orientation Studies and Stress Sketches.
Piping and Layout experience in Refinery, Offshore, Chemical, Blending, and Power Generation.
SITE AND OFFSHORE EXPERIENCE
12 months on site at Press Offshore, Wallsend, Tyne and Wear on the Southern North Sea Gas Project (BP Development Limited) for McDermott Engineering London Limited (1987).
Offshore survey in the Leman 49/27 field on Platforms ‘AC’ and ‘AP’ for tie-in connections to ‘AC’ Cantilever Platform for Matthew Hall Engineering Limited (1988).
6 months on site at the British Gas North Morecombe Onshore Gas Terminal, Barrow in Furness, Cumbria (British Gas Exploration and Production Limited) for John Brown Engineers and Constructors Limited (1993).
Field surveys for routing of pipelines from Oil Wells to Well Production Manifolds at Gas and Oil Separation Plants for the Bahrain National Oil Company (1993/94).
49 months on site at the ATA Yard, Baku, Azerbaijan on the Central Azeri C&WP Platform and the Deep Water Gunashli PCWU Platform for Kellogg Brown and Root Limited.
CAD EXPERIENCE
PDMS (25 years experience) - the design and modelling of three dimensional models of Onshore and Offshore installations, producing Plot Plans, Equipment GA’s, Piping GA’s, Isometrics and Clash Checks.
Phoenix/ Dragon/Schema – Draughting of PFD’s, UFD’s, P&ID’s and U&ID’s
OTHER AREAS OF EXPERIENCE
Vendor Coordination for the offshore commissioning of the C&WP Platform at the ATA Yard, Baku, Azerbaijan
Engineering Coordinator for the Dew Point Control Unit 2 at the Sangachal Terminal, Salyan Highway, Azerbaijan
|
Last Updated on 09-Jul-10
-- End of CV/Resume --
Full CV/Resume available to paid companies/recruiters as an attachment
|