| |
|
| Ref # |  | JS7102 |
| Year of birth |  | 1970 |
Current Location/Address |
| City or Town |  | dubai |
| Country |  | UNITED ARAB EMIRATES |
Permanent/Home Location/Address |
| City or Town |  | Dubai |
| Country |  | UNITED ARAB EMIRATES |
Languages |
| Primary Language |  | Fluency |
| Arabic |  | Read, write and speak fluently |
Nationalities |
| Nationality |  | EGYPT |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Architect |  | 14 |
|  | |
|  | |
|  | |
|  | |
| Industry |  | Years Experience |
| Building and Construction |  | 14 |
|  | |
|  | |
|  | |
|  | |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | Bsc of fine arts | Architecture | 1994 |
Other Qualifications, Memberships, Certification
Egypt Engineer Syndicate. |
Computer Skills and Software Used |
| Acad-2006/Photo shop CS2/3D max? MS Office |
Work Locations |
| Are you willing to move or relocate? | Countries NOT Willing To Work In! |
| Yes - I will relocate internationally | UAE
QATAR
|
Availability |
| Start Immediately? |  | Available Now |
| Earliest Start Date |  | Given 4 weeks notice |
Ideal Next Job |
Senior Project Architect
Technical Manager
Architectural Construction manager |
Required Salary & Conditions |
| 9000-10000 $ per month |
Employment History |
| Total Years of Work Experience: |  | 16 |
| Commenced Full Time Work: |  | 1996 |
| Job Title: |  | Senior Project Architect |
| Duration |  | From : 2009 To: 2011 |
Summary |
A professional, results-driven Senior Architect / Design Manager with over 14years of experience( 10 years in Dubai) in Construction Industry, project execution and project coordination & delivery of engineering solutions for multi-million dirham major projects for reputed companies in UAE/QATAR & EYGPT.
|
Work Experience |
SENIOR PROJECT ARCHITECT/ TECHNICAL MANAGER
Executive Credentials
A professional, results-driven Senior Architect / Design Manager with over 14years of experience( 10 years in Dubai) in Construction Industry, project execution and project coordination & delivery of engineering solutions for multi-million dirham major projects for reputed companies in UAE/QATAR & EYGPT.
• Ability to handle all site civil &Architecture work from execution to handover phase. Managed all technical aspects of highly complex engineering projects.
• Particular talent in producing cost-effective solutions leading to productivity increase, labor costs mitigation, and quality improvement. Quick problem solving ability and decision making using data, design goals and local industry standards.
• Demonstrated ability to direct a team of technical professionals to meet and exceed project goals. Recognized for attention to detail, adherence to standards, with highly developed technical expertise with exceptional skills in managing teams.
Executive Competencies
►Extensive experience in residential& mixed use buildings ► Fit out and Interior works & Execution
►Project Execution & Coordination Management
►Value Engineering and design &construction costs.
►Team Building and Leadership
►Fast Track Project Management
►Quality Control Management
►Mobilization / Demobilization of Staff ►Time & Cost Project Management
►Material Procurement
►Executive Level Negotiating Skills
►EHS Compliance Management
►Site Supervision
►Profit Maximization
Professional Experience
Al Ahmadiah Aktor LLC-Dubai Feb 2009 to present
Sr.Project Architect/Technical manager.
1-American School of Dubai ASD -Al Barsha- Dubai
Client : ASD. Consultant :RMJM.
Value:400 Million Dhs
2-Qatar-New Doha International Airport NDIA.
Cargo Complex Facilities -Emiri Hangers(Design&Build).
Client :Qatar Government .
Consultant :ADPi / Bechtel . Value :2.1 Billion QR.
Objectives & Responsibilities
• Prepare project execution strategy, ensured the implementation of quality control standards and cost control on project for on time completion.
• Deterring , verified and enforced specification compliance of materials at various stages of project. Managed and
Integrating all the project elements in to unified designs considering the interfacing with other disciplines MEP
Structures,...
• Implementing more build able ideas and presenting them to construction team ,management as well as Client.
Page- 2
• Coordinate and communicate with client and the Consultants as required. And conducting the necessary and regular technical meetings with all parties .
• Creating prototypes, detailing of design attributes and coordinating with other construction team members in order for accomplishing overall project’s objectives.
• Identified, selected appointed sub-contractors.and monitoring all their performances such submittals , mockups, meetings ,RFIs ..etc
• Lead the development of a technical strategy , Shodrawings , material submittals ,..
• Provide necessary coordination with planning team for the required information due to design changes and to the subcontractors deliverables related to project schedule .
• Assisting the procurement team as to qualify the required materials due to project’s specification, as well as identified , selected suppliers and subcontractors.
• Liaise with the Project manger /Leader for all technical aspects & deliverables
Laing O’rourke LLC- Dubai Feb. 2007 to Dec 2008
Senior Architectural Coordinator / Asst Design Manager. Dubai, UAE
• Perform preparation of relevant documents.
• Carry out and create with Value Engineering with its associated costs.
• Contribute in Risk Management workshops and registers.
• Monitor the flows of RFI, Shop drawings, submittals and other site activities.
• Attend site meetings with the Client and the Consultants.
• Prepare Correspondence, Minutes of Meetings,progress Charts,..etc .
• Liaised with the Consultants / Project Manager PMC.
• Coordinate and communicate with Client and the Consultants as required.
• Coordinate structural drawings with architecture and MEP drawings.
• Reporting to Design Manager /Project Leader in order to update the status of project.
1-Major Project – Motor City –Area 01 – (14 Residential Towers)
Location : Nad El Sheba-South Barsha
Client : Union Properties
Consultant : Burt Hill
Value : AED 1.02 Billion
2-Major Project- Dubai University Hospital
Location : Dubai Health Care City
Client : TATWEER
Consultant : Ellerbe Backer (USA) & GHD (Australia)
Value : AED 3.00 Billion.
Civilco Engineering & Contracting April. 2005 to Feb. 2007
Project Architect Dubai, UAE
• Directed and supervised an engineering team of 5 technicians. Responsible for project coordination, verification of architectural and structural drawings with other trade services.
• Performed verification of the contract drawings with the specifications and other tender documents.
• Prepared, monitored and revised the required Shop drawings in accordance with the specialized sub-contractors to ensure compliance with the Project specifications.
• Coordinate and communicate with client and the Consultants as required. Coordinate structural drawings with architecture and MEP drawings.
• Performed preparation of relevant documents
• Attend site meetings with the Client and the Consultants.
• Liaised with the Consultants / Project Manager.
Page-3
Major Project – Dubai Arch Tower – (4 B + G +40 Stories)
Location : Jumeirah Lake Towers (Plot/G1)
Client : Aber Facilities Management
Consultant : Schuster Pechtold
Value : AED 135 Million
Al Hamed Development and Construction LLC. Dec. 2003 – Apr. 2005
Architectural Coordinator Dubai, UAE
• Planned, directed and controlled a team of 3 responsible for project coordination, verification of architectural and structural drawings with other trade services.
• Performed verification of the contract drawings with the specifications and other tender documents.
• Prepared, monitored and revised the required Shop drawings in accordance with the specialized sub-contractors to ensure compliance with the Project specifications.
• Coordinated and communicated with client and the Consultants as required. Coordinated structural drawings with architecture and MEP drawings.
• Performed preparation of relevant documents
• Attended site meetings with the Client and the Consultants.
• Liaised with the Consultants / Project Manager.
• Responsible for preparation of method of statements.
• Major Project – The Palm Jumeirah – Shore Line Apartments (Package # 4) 4 Nos Luxury Residential Towers
Contain (2 Basement + G+ 13 Floor) Valued at AED. 270 Million.
Client : Nakheel
Consultant : Associated Consultant Engineers (ACE)
Project Manager : Turner
Dhabi Contracting Est. 2000 – 2003
Project Engineer / Manager Dubai / Abu Dhabi
Provided technical leadership as Project Manager / Engineer for the Dhabi Contracting Est responsible for planning, directing, managing, coordinating and expediting through Civil Engineering team the execution of the customer assigned Civil Engineering projects related to Construction of Shopping / Residential Complex / Villas/ Residential /Commercial Buildings within cost, schedule and contract limitations through administration of the contracts while ensuring total customer satisfaction. Reporting to the Project Manager. Directly supervised 4 staff and managed a team of 150. .
• Prepare project execution strategy, ensured the implementation of quality control standards and cost control on project for on time completion.
• Executed daily operations of monitoring the work executed by the engineering team at site and prepare interim and completion project reports.
• Supervised monitored and report Project progress throughout the project cycle to ensure on time completion. Attended Project Progress Meetings and coordinated with other departments.
• Managed Cash Flow Requirements for the Projects. Control expenditures within limitations of project budget. Prepared monthly payments for the project.
• Monitored, verified and enforced specification compliance of materials at various stages of project. Managed and controlled planning programs and controlled related tasks as per schedule.
• Perform material procurement and conducted quantities take off for materials and manpower requirements. Performed preparation of invoices, variance and claims and client follow up.
• Inspected and observe work in progress to ensure that procedures followed and materials used conformed to project specifications and quality standards.
• Establish and maintain effective QA/QC / Safety system in place for the Projects strictly adhering to standards and specifications.
• Identified, selected appointed sub-contractors.
• Managed landscaping, swimming work supervision. Liaised with local authorities for approval.
Major Projects Handled - Al Rahbaa Shopping complex, Residential Abu Dhabi as Project Engineer . Project Value – AED. 12.4 Million.
- 8 Villas at Um Suqiam for Development Board – Dubai (Dubai Government) value AED.5 Million as Project Manager.
- 4 Commercial & Residential Buildings – Abu Dhabi valued AED. 80 Million.
Page4
Kiviazi Tour tic Resort –Red Sea ( 5 Stars Hotel ). 1999 – 2000
Client Project Engineer Egypt
Responsible for directing, managing, coordinating and expediting through sub-contractors the execution of assigned customer Civil Engineering project 5 Start Hotel within cost, schedule and contract limitations through administration of the contracts while ensuring total customer satisfaction. Directly supervise a team of 400.
• Prepared project execution strategy, ensured the implementation of quality control standards and cost control on project for on time completion.
• Executed daily operations of monitoring the work executed by the sub-contractors at site and prepared interim and completion project reports.
• Supervised monitored and reported Project progress throughout the project cycle to ensure on time completion. Attend Project Progress Meetings and coordinate with other departments.
• Managed Cash Flow Requirements for the Projects. Controlled expenditures within limitations of project budget.
• Manage correspondence with the sub-contractors regarding the Progress, Valuation & Program, and Variations & Extension of time & Claims.
• Liaise with the client /Project Architect/ Structural Engineers etc.
• Responsible for certifying monthly / final payments depending on the progress of the projects.
Desert Beach Resort Sharm El Sheikh (Ritz Carlton Sharm)- 5 Star Resort 1996 – 1999
Project Engineer Egypt
Directed and supervised Civil Engineering team for involved in the execution of major civil engineering construction project related to Landscape, Playing Yards / Main Building / Swimming Pool / Health club/ Gym Building work for this 5 Star Resort. Directly supervise 300 staff. Reported to Construction Manager.
• Provided leadership to project team to accomplish project goals and monitor out-put.
• Coordinated with technical specialists and site personnel in identifying and resolving complex technical problems. Attend regularly project progress meetings.
• Monitored progress throughout the project cycle, ensuring cost and time constraints are met and acting to ensure problem resolution, as necessary.
• Responsible for site supervision and monitoring of work in progress at site, including quality control inspections.
• Prepared bills of quantities, estimate material required for the construction.
• Led squad to achieve and maintain highest rankings for Health, Safety & Environment standards.
• Interfaced with the consultants, clients and others outside the company for technical and commercial discussion.
• Assigned duties and monitored the performance of the staff involved in the execution of Project.
Academic Achievements
Bachelor of Engineering- Architect
Alexandria University-1994
Technical Skills
Proficient in the use of: MS-Office Windows XP (Word/Excel/PowerPoint), Outlook , Auto CAD-2006 ,3 D Max, Primavera 3.1, Adobe Photoshop
Training Attended
- IOSH ( 2 Days ) Safety Training ( ANLOR) and ACONEX.
Personal Details
Nationality : Egyptian
Visa Status : Resident
Driving License : UAE Since 2002
|
Comments/ Hobbies/ Interests etc: |
Preferable Location Qatar, Bahrain, Oman, Kuwait.
U A E Ihad a Band Till October 2003. |
 |  |  |
 |  |  |
 |  |  |
Last Updated on 08-Oct-11
-- End of CV/Resume --
Full CV/Resume available to paid companies/recruiters as an attachment
|