| Ref # |  | JS5667 |
| Year of birth |  | 1949 |
Current Location/Address |
| City or Town |  | Junction |
| State |  | Texas |
| Country |  | USA |
Permanent/Home Location/Address |
| City or Town |  | Junction |
| State |  | Texas |
| Country |  | USA |
Languages |
| Primary Language |  | Fluency |
| English |  | Read, write and speak fluently |
Nationalities |
| Nationality |  | USA |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Area Superintendent |  | 3 |
| Construction Superintendent |  | 5 |
| Consultant |  | 1 |
| Fitter |  | 18 |
| HSE Manager |  | 10 |
| Industry |  | Years Experience |
| Oil and Gas |  | 10 |
| Pipelines |  | 1 |
| Petrochemical - Refinery |  | 10 |
| Power |  | 2 |
| Water |  | 2 |
Qualifications |
| Highest Qualifications |  | Trade Qualification |
| Qualification | Subject | Establishment/Country | Year |
| Trade Qualifications | Pipefitting | Neches Butane Prod. Co., USA | 1974 |
|
Computer Skills and Software Used |
| some |
Work Locations |
| Are you willing to move or relocate? |  |
| Yes - I will relocate internationally |  |
Availability |
| Start Immediately? |  | Available Now |
| Earliest Start Date |  | Given 1 weeks notice |
Ideal Next Job |
| Open to all offers |
Required Salary & Conditions |
| Minimum salary of USD 12,550 per month commensurate with conformity to national labor laws, transportation, housing, meals, computer with internet service assigned to my positon, airfare to/from designated home location for mobilization, leaves and demobilization. Completion bonus for each contract length of sevice, payable at end of service length. All bank transfers paid and a minimum of two bank direct transfers allowed. |
Employment History |
| Total Years of Work Experience: |  | 43 |
| Commenced Full Time Work: |  | 1969 |
| Job Title: |  | Piping Superintendent |
| Duration |  | From : 2007 To: 2009 |
Summary |
| Multiple types of projects from 1975 to present in oil,gas, petrochemical, up line and down line, pipelines and storage facilities, offshore work in Gulf of Mexico & Kenai penensula, overseas work from 1995 to 2001 and 2006 to present. Positions worked in these fields include Piping Superintendent, Construction Superintendent and Safety Manager. |
Work Experience |
SUMMARY OF EXPERIENCE:
Thirty-four years experience in all phases of heavy construction. Responsibilities have included Safety Program implementation and Contract Administration of Safety Schedules and Riders on LSTK, LSPB, and Unit rate contracts. Facilities have included Petrochemical Plants, Oil, and Gas Refineries. Project types have included Grass Roots, Revamp, Modification and Expansion of existing facilities. Particular skill sets include a very strong background in Safety Administration, Safety Supervision with an emphasis in Field Operations as well as Safety Consultant work, primarily Heavy Equipment Safety Training and compilation of Safety Manuals/Handbooks with current OSHA upgrades and revisions within all disciplines.
EDUCATION:
Lamar University – Beaumont, Texas – Pipe Fitting
Hamshire-Fannett High School – Hamshire, Texas
EXPERIENCE:
October 2008 – September 1, 2009
Chicago Bridge & Iron (CBI) – Piping Superintendent
• Assigned to Sabic Refinery (SASREF) - Upgrade ULSD Project, Al-Jubail, Kingdom of Saudi Arabia
1) Responsible for piping logistic fabrication
2) Prioritizing area fabrication for greatest cumulative production
3) Assigned control of tie-in and hot-tap activities: 28 hot-taps and 147 tie-ins all done within schedule, 0 incidents
July 2007 – September 2008
Shaw Stone & Webster Arabia Co. LTD – Piping Supervisor
• Assigned to BBTX Plant, Yanbu Industrial City, Kingdom of Saudi Arabia
October 2006 – July 2007
Consolidated Contractors Company (Kuwait) WLL – HSE Manager
• Assigned OL2K Ethylene Plant OEP Project, Kuwait
January 2006 – May 2006
S & H Services LLC – Advisor/Consultant
• Assigned to 3 ExxonMobil locations – Everett, Massachusetts; Springfield, Massachusetts and Providence, Rhode Island
September 2005 – January 2006
Teton – Site Safety Manager
• Assigned to Luna Power Plant – Deming, New Mexico
January 2005 – September 2005
L-Con Constructors – Site Safety Manager
• Assigned to Current Creek Power Plant – Mona, Utah
September 2004 – January 2005
Sulzer – Chemtech USA, Inc. – Site Safety Manager
• Assigned to Valero Plant – Kenner, Louisiana
January 2004 – May 2004
Harmony – Site Safety Manager
• Assigned to demolition of Global – La Porte, Texas
September 2003 – November 2003
Harmony – Site Safety Manager
• Assigned to shutdown, ConocoPhillips Refinery – Sweeny, Texas
May 2003 – September 2003
Shivers Enterprises, Inc. & Hull Oilfield Hauling, Inc. – Safety Consultant and Trainer
• Instructed Safety Training for Shivers Enterprises, Inc. & Hull Oilfield Hauling, Inc. personnel and produced Company Safety Manual and Handbook with current guidelines and OSHA requirements – Hull, Texas
June 2000 – October 2001
Al-Hoty Establishment (AHE) – Safety Supervisor
• Assigned to Haradh Gas Field Development for Saudi Aramco, a 1.6 billion US-dollar grass roots gas field development; responsibilities included but were not limited to contract administration of Schedule “D” and Saudi Aramco Loss Prevention Program with 8 LSTK/LSPB contractors assigned to 8 packages (BI’s)
June 1995 – September 1999
ABB Lummus Global, Inc. – Site Safety Manager
• Assigned to ABB Lummus Domestic Operations from 1995 to 1997
• Assigned to heater installation for E. I. DuPont; logged 569,000 man hours with 0.0 LTI and RIR of 0.0
• Assigned to Ethylene Project, Westlake, Louisiana, after project reorganization took place; 1.3 million man hours logged with 5 LTI’s and RIR of 1.2
• Assigned to Saudi Arabia to work on Hawtia GOSP-2 for Saudi Aramco with successful completion; included all EPC work for GOSP-2 200 kms south of Riyad
• Assigned to Berri Gas Plant, also for Saudi Aramco with successful completion; LSTK contract for the de-bottlenecking and expansion of existing facilities in Jubail; logged 3.8 million man hours with 0.0 LTI and RIR of 0.157 KOP; was a grass root ethylene plant located in Jubail. KOP logged 12 million man hours with 0.0 LTI and RIR of 0.416
• Assigned to Kemya Olefins Project. ABB Lummus had 2 LSTK contracts with Saudi Aramco and 1 LSTK with SABIC/EXXON.
July 1994 – February 1995
Williams Brothers Construction – Site Safety Manager
• Clean Room construction logging 389,000 man hours with 0.0 LTI
April 1992 – October 1993
Litwin Engineering – Site Safety Manager
• Completed revamp and installation of new gas processing unit and systems in existing refinery; 785,000 man hours logged with 0.0 LTI and 0.753 RIR; duties included developing and implementing project and corporate safety program
April 1991 – November 1991
Ref-Chem Construction – Safety Supervisor
• New desulphurization unit; 180,000 man hours logged with 0.0 LTI and 2 recordables
February 1990 – October 1990
Berry Construction – Mechanical Superintendent
• Supervised subcontractors on Champlin shutdown; responsible for schedule and time sheets; supervised shutdown and rebuilding of decoker drum and piping as well as insulation of systems at Oxy-Chem facility
May 1988 – October 1989
Veco Construction – Welder/Pipe Fitter/Pipe General Foreman
• Assigned to the North Slope, Alaska, for all offshore development for 5 drilling pad modules
January 1986 – February 1988
Pittsburgh Plate Glass – Mechanical Superintendent
April 1984 – September 1985
Veco Construction – Mechanical Superintendent
• Assigned to North Slope and Seward, Alaska, overseeing steam injection system and module tie-ins; oversaw coal-loading facility in Seward
1975 – 1984
Local 195 – Pipe Fitter
Beaumont, Texas
1969 – 1975
Neches Butane Products Company – Apprentice Pipe Fitter
Port Neches, Texas
|
Comments/ Hobbies/ Interests etc: |
| camping, hunting, fishing, shopping resale/antique shops with my wife, spending time knocking around on the weekends with my wife |
 |  |  |
 |  |  |
 |  |  |
Last Updated on 28-Feb-11
-- End of CV/Resume --
Full CV/Resume available to paid companies/recruiters as an attachment
|