}
CV Piping Designers Piping Engineer Designer from INDIA (JS51698) - Engineering Jobs - Expat Engineer
 
 

CV Piping Designers Piping Engineer Designer from INDIA (JS51698)

 
 
Ref #JS51698
Year of birth1973

Current Location/Address
City or TownKrishna Nagar, chromepet, chennai
State tamilnadu
CountryINDIA

Permanent/Home Location/Address
City or TownKrishna Nagar, chromepet, chennai
State tamilnadu
CountryINDIA

Languages
Primary LanguageFluency
EnglishRead, write and speak fluently

Nationalities
NationalityINDIA

Experience Classification
Job FunctionYears Experience
Piping Designers11
Piping Engineer5
IndustryYears Experience
Oil and Gas5
Power4
Petrochemical - Refinery3

Qualifications
Highest QualificationsDegree
QualificationSubject Establishment/Country Year
Degreebachelor in engineeringannauniversity, chennai, india2005
HND/DiplomaDMEcentral polytechnic, chennai, india1993



Computer Skills and Software Used
autocad, microstation (obtained training), unigraphics,

Work Locations
Are you willing to move or relocate? Countries NOT Willing To Work In!
NOSAUDI ARABIA




Availability
Earliest Start DateGiven 6 weeks notice

Ideal Next Job
Looking to work as piping engineer in the Middle east preferably on a Married status

Required Salary & Conditions
USD 5000 + Accomodation + transportation + Medical + other applicable benefits.

Employment History
Total Years of Work Experience: 18
Commenced Full Time Work: 1994
Job Title:Designer
DurationFrom : 2000 To: 2004

Work Experience
Period: from 01/11/09 to Till Date

Job/Role: Piping Site Co-ordination Engineer/Deputy Lead/Field Piping Engineer

Company: Kuwait Oil Company (KOC) Department: Piping

Country/Location: Kuwait / Burgan Oil Field
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: INSTALLATION OF NEW COMPRESSORS AT GC-07, 08 AND 21, EPC
Replacing the existing two electric motor driven wet screw compressors together with its associated equipment with a new single train variable speed electrically driven centrifugal compressor complete with suction & discharge scrubbers, air cooled after cooler, power and control system, one at each Gathering Centre’s, GC-07, 08 and 21.
MAIN ACTIVITY: Verifying the existing site conditions with contract documents through Site Survey. Preparation of Demolition plot plan. Preparation of Demolition Tie-in Isometrics, Preparation of Demolition Tie-in list, Preparation of Demolition package manual. Coordinating and Guiding the task force for Preparation of piping layout based on site survey taking into consideration the existing hindrance. Performing re-routing studies of existing piping services.
Period: from 01/07/09 to 10/10/09

Job/Role: Project Specialist Leader

Company: Abu-Dhabi Company for Onshore Oil Operations (ADCO) Department: Piping

Country/Location: UAE / Bab, Thamama, Habshan
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: 1.8 MMBOPD PHASE-I DEVELOPMENT PROJECT, EPC (PRE-BID)
As part of developing ADCO’S new oil fields to achieve the production target of 1.8 MMBOPD. Two new reservoirs (THAMAMA-G, HABSHAN 2) at BAB are developed to produce a sustainable rate of 80 MMBOPD.
MAIN ACTIVITY: Coordinating and Guiding the task force for Preparation of MTO Based on Tender documents, Reviewing of all Tender Documents to ensure consistency with the information provided and to take into consideration all points which have economical impact, FEED Endorsement of Tender Documents, Study of Layout and Plot Plan to identify FEED deficiency and propose alternative and economical solutions, Providing inputs for other engineering disciplines for estimating their respective MTO.

Period: from 20/08/08 to 31/05/09

Job/Role: Project Specialist Leader

Company: Abu-Dhabi Gas Liquification Company Ltd. (ADGAS) Department: Piping

Country/Location: UAE / Das Islands
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: INTEGRATED GAS DEVELOPMENT PROJECT, EPC (PRE-BID)
Transferring 900 mmscfd of Gas from Umm-Shaif Super Complex to Habshan
After Conditioning and Boosting at Das Islands.
MAIN ACTIVITY: Coordinating and Guiding the task force for Preparation of MTO Based on Tender documents, Reviewing of all Tender Documents to ensure consistency with the information provided and to take into consideration all points which have economical impact, FEED Endorsement of Tender Documents, Study of Layout and Plot Plan to identify FEED deficiency and propose alternative and economical solutions, Providing inputs for other engineering disciplines for estimating their respective MTO.

Period: from 22/11/07 to 30/07/08

Job/Role: Field Piping Engineer

Company: QATOFIN (QAPCO & TOTAL) Department: Piping

Country/Location: Qatar / Mesaieed Industrial Estate
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: LINEAR LOW DENSITY POLYETHYLENE PLANT (465,000 MTPA)
MAIN ACTIVITY: Incorporating all vendor info’s and removing Holds’ in isometrics for Pre-Fabrication, Single point co-ordination between engineering office and site office for maintaining latest documents, Routing study and modification of pipe routing to avoid clashes in existing Plant, Site walkthrough survey for routing of new change order lines in existing plant, Preparation of As-built piping layout for all lines connecting QVC and QAPCO Plant, Preparation of Tie-In Dossier and issuing the same for client’s approval, responding to the Technical Queries from Sub Contractors, Modification of standard and special support sketches as per site condition.

Period: from 01/04/07 to 21/11/07

Job/Role: Area Lead Engineer

Company: Saudi Arabian Oil Company (ARAMCO) Department: Piping

Country/Location: SAUDI ARABIA / Khurais
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: KHURAIS CENTRAL PROCESSING FACILITIES,
Production and Distribution of Utilities for the GAS OIL SEPERATION
PLANT & GAS TREATMENT PLANT with High Pressure Sea Water
Injection Pumping System to facilitate extraction of CRUDE OIL from
Field Wells.
MAIN ACTIVITY: Co-coordinating the task force for completing the project in time with quality, Collecting necessary inputs from Client & assisting the task force on developing their activities and to solve possible discrepancies in drawings, specifications, etc., Guiding the task force to follow the applicable codes & standards, and ensuring uniformity in design and drafting activities, Reviewing, issues and follow-up the comments, on all drawings and specification related to other engineering disciplines, Ensuring proper documentation of drawings and documents until the job is Completed as per Company’s quality procedures, Providing feedback to the Lead Engineer, the pros and cons of standard working methods and work instructions, Conducting Piping Design Reviews on piping issues and also on overall project related issues, Other responsibilities are Preparing Schedule for Piping Deliverables, Vendor Drawing Reviewing, Checking of Piping General Arrangement, and Preparation of Equipment Nozzle Orientations, Preparation of Input for structural platform drawings and pipe supporting Cleats drawings & Checking of Supports as per Stress Analysis Requirements.

Period: from 01/10/06 to 31/03/07

Job/Role: Lead Engineer

Company: Reliance Industries Limited Department: Piping

Country/Location: INDIA /Hazira, Surat
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: PVC OH Condenser on polymerizer (De-Bottlenecking)
To increase reactor productivity from 336 KTA to 355 KTA with grade
Mix by providing Over Head condenser on top of polymerization reactor.
MAIN ACTIVITY: Preparation of Piping MTO, Schedule for Piping Deliverables, Piping Design Basis, Basis of Flexibility analysis, Critical Line List, Vendor Drawing Reviewing, Plot Plan, Equipment Layouts, Piping General Arrangement & Piping Sections, Equipment Nozzle Orientations, Platform drawings and pipe supporting Cleats drawings, Checking of Supports as per Stress Analysis Requirements & Pipe Support Detail Engineering.

Period: from 01/05/06 to 31/03/07

Job/Role: Lead Engineer

Company: Reliance Industries Limited Department: Piping

Country/Location: INDIA /Hazira, Surat
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: VCM Reliability Improvement Project (De-Bottlenecking)
Erection of New Quench Scrubbers with Valve trays to avoid coke Carry over
and processing part of EDC, VCM, HCL which are earlier processed in
Hi-boil column in new Recycle EDC column to minimize Pressure drop in
Hi-boil column and separation of VCM & HCL from Recycle EDC column &
Hi-boil column in a stripper and recover the EDC for recycling to furnace.
MAIN ACTIVITY: Preparation of Piping MTO, Schedule for Piping Deliverables, Piping Design Basis, Basis of Flexibility analysis, Critical Line List, Vendor Drawing Reviewing, Plot Plan, Equipment Layouts, Piping General Arrangement & Piping Sections, Equipment Nozzle Orientations, Platform drawings and pipe supporting Cleats drawings, Checking of Supports as per Stress Analysis Requirements & Pipe Support Detail Engineering.



Period: from 01/03/06 to 31/04/06

Job/Role: Designer

Company: Cairn Energy India Pty Ltd Department: Piping

Country/Location: INDIA /Rajasthan
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: Southern Field Development Project at Rajasthan.
MAIN ACTIVITY: Preparation of Equipment & Piping Layout for Raageshwari-1 Well Pad, Raageshwari-2 Well Pad, Raageshwari-3 Well Pad and Saraswathi-4 Well Head.

Period: from 16/01/05 to 28/02/06

Job/Role: Designer

Company: Shariket Kahraba Berrouaghia Department: Piping

Country/Location: Algeria / Berrouaghia
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: 2x271 MW Power Project
Simple cycle Gas Turbine Power Plant with Diesel oil as Emergency Fuel.
MAIN ACTIVITY: Preparation of Overall Plot Plan, Overall Composite Piping Layout, Equipment & Piping Layout – Fuel Oil Tank Farm Area, Equipment & Piping Layout – GT building Area, Equipment & Piping Layout – Water Storage & Treatment Area, Equipment & Piping Layout – Gas Treatment Area, Fire Fighting System Piping, Utility Piping, Piping Isometrics, Support Arrangement Detail Engineering, Vendor documents reviewing, Preparation of BOQ.


EXPERIENCES – OUTSIDE SAIPEM GROUP


Period: from 01/01/04 to 07/01/05

Job/Role: Designer

Company: Electricity Authority of Cyprus Department: Mechanical

Country/Location: Cyprus / Vasilikos
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: 120 MW, Vasilikos Power Station, Phase II,
Reheat, Regenerative, Heavy Fuel oil based Thermal Power Plant
MAIN ACTIVITY: Preparation of Piping layout - Boiler Area, Piping layout - STG Building, Piping layout – Steam Blowing Piping, Piping layout – HFO Pump House, Fabrication Piping Isometrics, Stress Isometrics, Hanger Engineering & Support Arrangement Detail Engineering for Critical Piping System, Auxiliary Steam Piping System, Boiler Integral Piping System and Fire Fighting System.

Period: from 01/07/03 to 31/12/03

Job/Role: Designer

Company: Kingdom of Saudi Arabia Department: Mechanical

Country/Location: Saudi Arabia
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: Riyadh Power Plant No – 9
Simple cycle Gas Turbine Power Plant
MAIN ACTIVITY: Preparation of Piping Layout – Gas Turbine Module, Fabrication Piping Isometrics for Natural Gas Piping.



Period: from 01/07/02 to 30/06/03

Job/Role: Designer

Company: CHENNAI PETROCHEMICALS LTD., Department: Mechanical

Country/Location: India / Chennai
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: 1x130 TPH, Cogen Power Plant.
Reheat, Heavy Fuel oil based Thermal Power Plant
MAIN ACTIVITY: Preparation of Piping Layout – Boiler Area, Piping Layout – Fuel Forwarding Area, Integral Piping Layout – Boiler Area, Piping Layout – Boiler Area Fuel Oil System, Fabrication Piping Isometrics, Stress Isometrics and Hanger Engineering & Support, Arrangement Detail Engineering for Critical Piping System, Fuel Oil Piping and Boiler Integral Piping.

Period: from 01/04/01 to 31/06/02

Job/Role: Sr. Draught’s person

Company: TAMILNADU ELECTRICITY BOARD Department: Mechanical

Country/Location: India / Perungulam, Tamilnadu
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: 95 MW, Combined Cycle Power Project
MAIN ACTIVITY: Piping Layout-CCW Pump Area, Piping Layout-Boiler Feed Pump and De-aerator Area, Piping Layout-Pipe Rack 2nd and 3rd Tier, Piping Layout-Natural Gas Compressor Area, Piping Layout-Gas Turbine Generator Area, Piping Layout-STG Building Area, Piping Layout-Pipe Sleepers, P&ID’s, Fabrication Piping Isometrics, Stress Isometrics, BOQ, and Support Detail Engineering for Critical piping systems, Gas piping, Closed Cooling Water System, Utility & Service Piping.

Period: from 01/01/01 to 31/03/01

Job/Role: Sr. Draught’s person

Company: LANCO KONDAPALLI POWER LIMITED Department: Mechanical

Country/Location: India / Vijayawada, Andrapradesh.
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: 355 MW, Combined Cycle Power Project
MAIN ACTIVITY: Preparation of Fabrication Piping Isometrics, Support Detail Engineering For Critical Piping Systems and As-Built Drawings.

Period: from 01/10/00 to 31/01/01
Job/Role: Sr. Draught’s person
Company: GUJARAT STATE ENERGY GENERATION Ltd., Department: Mechanical
Country/Location: India / Gujarat.
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: 156.1 MW, Combined Cycle Power Project
MAIN ACTIVITY: Preparation of Piping Layout-CCW Pump Area, Fabrication Piping Isometrics, BOQ, Support Detail Engineering For Critical Piping Systems and Closed Cooling Water System.

Period: from 22/03/99 to 09/07/00
Job/Role: Quality Controller
Company: Zakum Development Company Department: Project
Country/Location: Abu-Dhabi.
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: As-Built Project
MAIN ACTIVITY: Checking of CAD converted Piping Layouts and Isometrics of Off-Shore Well Head Platforms and Fuel Oil Tank Farm Area located at Zakum, Zirku and Das islands (Abu-Dhabi) and Preparation of AS-BUILT P&IDS using PRO-P&ID for systems such as Water Injection lines, PIG Lines.

Period: from 01/01/98 to 19/03/99
Job/Role: CADD Draught’s person
Company: Indira Ghandhi Center for Atomic Research Department: Piping
Country/Location: India / Kalpakkam, Tamilnadu
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: Boron Enrichment Plant
MAIN ACTIVITY: Preparation of Equipment layout, Preparation of Piping Layout, Piping Isometrics, BOQ and Support Detail Engineering

Period: from 01/09/96 to 30/06/97
Job/Role: CADD Draught’s person
Company: ORCHID CHEMICALS LIMITED, CHENNAI Department: Piping
Country/Location: India / Alathur, Tamilnadu
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: Cephalosporin API's (Active Pharmacy Ingredients) De- Bottlenecking,
MAIN ACTIVITY: Preparation of Equipment layout, Piping Layout, Piping Isometrics, BOQ, Support Detail Engineering and As-Built.

Period: from 01/12/95 to 31/08/96
Job/Role: 3D Modeller
Company: Tata Consultancy Services Department: Piping
Country/Location: Chennai
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: Turbine 3D modeling for General electrics, Greenville, USA
MAIN ACTIVITY: Preparation of Piping 3D Solid Models and Drafting of same.

Period: from 01/05/95 to 30/11/95
Job/Role: CADD Draught’s person
Company: Indian Oil Corp. Ltd., Department: Piping
Country/Location: Vishakapattanam, Andhra Pradesh
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: De-Sulphurisation Plant,
MAIN ACTIVITY: Preparation of Piping Layout, Generating Piping Isometrics, BOQ, and Support Detail Engineering

Period: from 01/11/94 to 30/04/95
Job/Role: CADD Draught’s person
Company: Enron Ltd Department: Piping
Country/Location: India


Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: Revamp Project,
MAIN ACTIVITY: Preparation of Piping layout for NEW PIG LAUNCHER Piping in Off-Shore Platform and Piping Isometrics, and Support Detail Engineering.

Period: from 01/02/94 to 31/10/94
Job/Role: CADD Draught’s person
Company: SIMAO PAPER MILLS, Department: Piping
Country/Location: China
Main activities, responsibilities and brief description of Company/work environment:
PROJECT BRIEF: De-Bottlenecking Project,
MAIN ACTIVITY: Preparation of Piping Layout, Piping Isometrics, BOQ and Support Detail Engineering.



Comments/ Hobbies/ Interests etc:
hobbies - Reading

Interest - To Develop skills in piping to work in large functional area

Last Updated on 14-Jul-11


-- End of CV/Resume --


Full CV/Resume available to paid companies/recruiters as an attachment

If you would like to contact this person, you will need to purchase
access to our CV/Resume database.

Please contact our sales department for pricing

sales@expatjob.net



www.expatengineer.net | Engineering Jobs | Site Map