| Ref # |  | JS200700 |
| Year of birth |  | 1968 |
Permanent/Home Location/Address |
| City or Town |  | Tripoli |
| Country |  | LIBYA |
Current Location/Address |
| Country |  | LIBYA |
Languages |
| Primary Language |  | Fluency |
| Arabic |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | LIBYA |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Area Engineer |  | 13 |
| Area Supervisor |  | 10 |
| Industry |  | Years Experience |
| Oil and Gas |  | 13 |
Qualifications |
| Highest Qualifications |  | Masters |
| Qualification | Subject | Establishment/Country | Year |
| Masters or Higher | Corrosion Engineering | School of Materials, Corrosion and Protection Center, UMIST University, Manchester, United Kingdom | 2004 |
| HND/Diploma | Cathodic Protecion effectiveness for some Libyan Oil Companies Pipelines | AL-FATEH UNIVERSITY, Faculty of Engineering, Chemical Engineering Department, Tripoli, Libya | 1993 |
Other Qualifications, Memberships, Certification
Libyan Corrosion Society |
Computer Skills and Software Used |
| Microsoft Office 98/2000/2003/XP |
Work Locations |
| Are you willing to move or relocate? |  |
| Yes - I will travel domestically |  |
Availability |
| Earliest Start Date |  | Given 12 weeks notice |
Ideal Next Job |
| Corrosion Engineer |
Required Salary & Conditions |
| "Minimum salary USD 5,000 per month plus paid housing and schooling for my four children" etc. |
Employment History |
| Total Years of Work Experience: |  | 16 |
| Commenced Full Time Work: |  | 1996 |
| Name |  | SOGEPI |
| Job Title: |  | Corrosion Engineer |
| Duration |  | From : 2005 To: 2010 |
Summary |
I am working in Corrosion Field since 1996 and in this capacity I have developed a broad range of experience in Corrosion Control Methods, including Cathodic Protection (CP), Paint and Coating, Internal corrosion and Material Performance. I have worked with international contractors on several projects.
My experience base has expanded greatly to provide me with both a broader scope of knowledge and understanding of the industry and a substation base on interpersonal relations. |
Work Experience |
Dec. 2005 – Present:
Cathodic Protection Engineer - QC/QA
SOGEP s.r.l. (ITALIAN COMPANY), Mabruk Field, Libya
SOGEPI Cathodic Protection Engineer in Contract Nš: FO-114-2004-MA “Upgrading of the Existing CP System at Mabruk Field for TOTAL Libya Branch- Mabruk Oil Operations - MOO” - (Supervision of Construction and Commissioning of 30 deep anode ground beds, 27 transformer rectifiers and 3 solar power units).
Complete monitoring of a new CP system including pipe to soil potential measurements (“on”/ “off”), anode ground bed outputs, line current measurements, as well as earthing resistance measurements covering all CP system in the Mabruk Field (well casing and associated flow lines, trunk lines, export line & GOSP facilities) starting from July, 2007.
Jan. 2010 – April 2010
Part time with TECNOMONTAGGI s.r.l.- Italian company to Design, supply of materials, install and commissioning of a new CP system (Zinc sacrificial anodes) to protect underground cooling water system pipe site work at Misurata Steel Plant:
1. Preparation of complete design package including (Design calculations, bill of materials, material specifications, construction specifications, engineering drawings, scope of work and commissioning procedure),
2. Supervision all the CP construction activities,
3. Pre-commissioning and final commissioning of the new CP system.
Sept. 1998 – Dec. 2005
Engineer Specialist
Sirte Oil Company, Marsa El Brega, Libya
Sharing with others for preparation of CP specification to protect Attahaddy Gas Field facilities (36 Well Casing, Flow lines and Plant Facilities).
Preparation of CP specification for 34” Brega-Zueitina-Bengahzi Gas Pipeline and Compressor Station (7 shallow ground beds and 3 open hole deep anode ground beds using Magnetite anodes).
Preparation of design package for replacement existing deep anode ground bed for cooling water pipes (Gas Plant/ Brega).
Preparation of CP requirements for Petrochemical Fire Fighting System (Brega).
Preparation of sacrificial anodes (Galvalum III) CP design package (scope of work, Drawings, Bill of Material, and Design Calculation) for 7.5km, 30” sea line.
Supervision of installation (7 SAGB) and (3) open hole deep ground beds impressed current CP systems installed by MAN from Germany along 34” Brega-Zueitina-Benghazi Gas Pipeline (245 km).
Responsible for overseeing the Pre-commissioning and commissioning of a new CP system along 34” gas pipeline network Brega-Zueitina-Benghazi (245 Km).
Supervision of installation Earthing systems at pipe crossing with High Voltage AC along 34” Brega-Zueitina-Benghazi Gas Pipeline 245 Km (installed by MAN of Germany) and along 34” El Khoms-Tripoli Gas Pipeline 140 Km (installed by ZANGAS of Russia).
Sirte Oil Company Site Engineer for upgrading of CP System at Jebel Field, (supervision of construction and commissioning of 25 deep anode ground beds, 2 shallow anode ground beds, 25 transformer rectifiers and 2 solar power units) by BOSSNA-S COMPANY
Cathodic Protection Engineer with qualifications in areas relating to Pipelines, Well Casings, Acid Jetties, Tug Berths, Sea lines, Tanks, Heat Exchangers and Vessels. Conducted complete site surveys and trouble shooting for existing CP systems.
Preparation of CP design packages including scope of work, drawings, bill of material and design calculations. Preparation of CP specification for newly constructed projects, reviewed CP document specifications and commissioned new CP systems.
Sept. 1996 – Sept. 1998
CP Technician
Sirte Oil Company, Marsa El Brega, Libya
Conducted complete routine monitoring of cathodic protection (CP) systems, pipe to soil potential measurements (“on”/ “off”), anode ground bed outputs, line current measurements, as well as earthing resistance measurements covering all CP systems in the field, industrial, and marine areas.
Conducted soil resistivity measurements for new and/or replacement of depleted shallow and deep anode ground beds using four pin methods.
Accomplished with others E log I test for twenty five (25) well casings at different environments.
Installation with others (20) impressed current shallow anode ground beds; (7) ground beds along Brega-Zuetina-Benghzi gas pipeline, (1) along main transmission Lines (36” Gas, 36” Oil, and 30” Gas) Brega-Zelten and the remains along 34” Brega-Misurata gas pipeline.
Conducting Close Interval Potential Survey (CIPS) and Direct Current Voltage Gradient (DVG) along Main Transmission Lines (36” Gas, 36” Oil, and 30” Gas) 172km each.
Mitigation of interference for pipeline crossing and plant areas.
|