| Ref # |  | JS195347 |
| Year of birth |  | 1970 |
Permanent/Home Location/Address |
| City or Town |  | Yalova |
| Country |  | TURKEY |
Current Location/Address |
| Country |  | TURKEY |
Languages |
| Primary Language |  | Fluency |
| English |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | TURKEY |
| Other Nationality |  | TURKEY |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Piping Designers |  | 20 |
| PDMS/PDS Designers |  | 6 |
| CAD Designers |  | 15 |
| Industry |  | Years Experience |
| Oil and Gas |  | 10 |
| Petrochemical - Refinery |  | 10 |
| Pipelines |  | 10 |
| Power |  | 4 |
Qualifications |
| Highest Qualifications |  | HND/Diploma |
| Qualification | Subject | Establishment/Country | Year |
| HND/Diploma | Yalova Technical High School | Turkey | 1987 |
|
Computer Skills and Software Used |
| Certified user of AutoCAD 13/14, 2000 Microstation 1995, Windows-NT, Microsoft Office Programs, Intergraph 3D Equipment, 3D Piping, Isometric, 2D P&ID, Rebis and Auto PLANT 97 3D Piping programs, CADWorx PIPE 2004 programs. Mechanical Desktop And Genius mechanical designing, solid modeling programs at intermediate level. Certified user of Tribon M1 Pipe Designer & Pipe Modeling at advanced level especially on design purposes. Aveva PDMS 12.0 3D Plant Design. SPR and PDS Frame Works Plus. |
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will travel domestically
Yes - I will relocate domestically
Yes - I will travel internationally
Yes - I will relocate internationally |  |
Availability |
| Start Immediately? |  | Available Now |
| Earliest Start Date |  | Given 4 weeks notice |
Ideal Next Job |
| Piping Design |
Required Salary & Conditions |
| usd 7000 per month |
Employment History |
| Total Years of Work Experience: |  | 22 |
| Commenced Full Time Work: |  | 1990 |
| Job Title: |  | Piping Designer |
Summary |
| Technical Piping Designer - Expert on Industrial piping design HVAC, heating and plumbing design, building mechanical system installation. |
Work Experience |
01 July 2007 – Present
...... PİPE FAB. AND TRADING LTD. CO.
1. AVEVA PDMS 12.0 – The 3D plant design application for accurate and clash-free plant design.
• Project Drawing Administration, lasts 2 days.
• System Administration (Basic), lasts 2 days.
• PDMS Foundations, lasts 2 days.
• Drawing Production (Basic), lasts 2 days.
• Pipework Modelling, lasts 2 days.
• Design Utilities, lasts 2 days.
• Piping Catalogues and Specifications, lasts 2 days.
• Isometric Production, lasts 2 days.
• Structural Modelling (Basic), lasts 2 days.
• Multi-Dicipline Supports Administration, lasts 2 days.
• Multi-Discipline Supports, lasts 2 days.
2. Technical courses were reviewed on Inroduction to Process Piping Design, Pumps&Turbines, Exchangers, Piping components, Fired Heater, Vessel Pumps, Stress&support, Tower, Compressor, Plot Plan, Drafting, Branch Reinforcement and Pump Performance. (From June2007 to July 2007)
3. Technical trainings were reviewed on Pipe rack design, microstation with Instrumentation design. (From July2007 to August 2007)
4. Technical trainings were reviewed on SPR and PDS Frame Works Plus, Equipment Modelling and Piping Design. These courses mentioned above given by expert Italian and English trainers.
5. Within the extent of design and manufacturing tanks with 1596 m3 capasity and piping works of İzmir Aliağa Petkim Petrokimya Holding A.S. (PETKIM).
• Designation of tie-in points in the field and feasibility work.
• Plot plan preparation and isometric creation in office setting.
• Tracing manufacturing processes.
• Preparation of MTO list.
6. Within the extent of spool creation and preparing spools for hydro test works of Karachaganak 4th Stabilization and Sweetening Train Project carried out by Petrofac International Co. Ltd.
• Making spools ready for fabrication and hydro test application. Produced about 1000 isometric drawings.
7. Within the extent of Thermal Power Plant 2x350 MW Gas/Oil Fired Unites which are El Tebbin and Cairo West Projects belong to Cairo Electricity Production Co. in Egypt.
• Making spools of Main Steam System and High Pressure Steam lines ready for fabrication.
April 2002 – June 2007
Tekfen Engineering C.O., Levent – Istanbul
1. Determined the existing pipe and electricity lines section details and performing predesign works at site for Enhancemenet of Crude Export Facilities Project in Kuwait.Worked on producing approximately 860 isometrics (including MTOs) and 3D design of the project by using AutoCAD Cadwork computer programs and with the help of engineers analyzing the support stresses using Caesar 2 computer program at the head office of Tekfen Engineering in Istanbul.
2. Worked at SAMIR REFINERY upgrade project in Morocco for about 6 months. Responsibilities were checking piping layouts, preparing isometrics drawings and piping design. Produced about 600 isometric drawings. Within the extent of the modernization, the capacity of production was increased, the security of production process was increased through the brand-new technology applied with the sulphur decomposition function. The project, costs 600 million dolars, belongs to Coral Group of Suud. The project was carried out in a consortium with Snamprogetti of Italy.
3. Worked at mechanical department for preparing of the 3D onshore and offshore piping design and material take off by special purpose software related Baku-Tbilisi-Ceyhan Pipeline Project Ceyhan Marine Terminal.
4. Worked at Azerbaijan-Baku BTC Sangachal project. Responsibilities were preparing Alignment Sheet and detail projects for 8”-14”-26” underground piping.
March 2000 – April 2002
Demta Isi ve Endustri Tesisatlari Sanayi C.O., Acıbadem – Istanbul
1. Employed at the corporate office and worked in parallel with the teams from the construction sites.
2. Took responsibility for Adana Hilton-SA Hotel, Maya Residence, Elit Residence and Arpaş Ambarlı Seaport premises administrative, HVAC, heating sanitary riser diagrams design and drawings, supplied building project.
May 1997 – February 2000
Tuzla Shipyard C.O., Tuzla – Istanbul
1. Worked with Italian, Russian and British design teams for piping drilling system and the structural design for the petroleum SCARABEO 7 offshore drilling platform, mutually constructed with an Italian Saipem SpA company, for renovation purposes. And, I had an under platform piping experience with a Yugoslavian piping design team.
2. 5500 DWT Oil / Chemical Tanker Project Worked in the design team for pipe design of the engine room and cargo piping systems and also prepared all workshop drawings for both manufacturing and fitting with Tribon System M1
April 1995 – April 1997
Foster Wheeler Bimas C.O., Kozyatağı –Istanbul
Worked at piping design department for purification system projects related to
Petrochemical/Pharmaceutical sector, also took responsibility in designing energy production centers.
April 1992 – April 1994
Yalova Aksa Acrylic Chemical Industry, Istanbul
Prepared system projects about factory production which includes piping and general equipment layouts.
|
Comments/ Hobbies/ Interests etc: |
SEMINARS & TRAININGS
2007 Aveva PDMS 12.0 3D Plant Design programs.
2009 SPR and PDS Frame Works Plus programs.
2001 One month training program on Tribon System M1 Pipe Design & Pipe Modeling by Tribon Solutions.
1999 Participated in AutoCAD 2000 seminar organized by Pargem Bilgisayar A.Ş.
1998 Attended seminars on Rebis – AutoPLANT industrial plant design at Hyatt Regency Hotel instructed by Sayısal Grafik A.Ş. In addition, participated in CAD – CAM fair with AutoCAD 14 and Rebis programs.
1996 Participated at one month training program in Milan, Italy organized by Foster Wheeler:
- Intergraph 2D P&ID training at Milan, Italy
- Industrial Plant and Piping Design training at Milan, Italy
PRESENTATIONS
Presented AutoCAD and Rebis programs at CAD CAM Fair/Seminar, Istanbul, Turkey, organized by Sayısal Graphic C.O.
Presented AutoCAD14, Rebis, Mechanical Desktop, SPI Sheet Metal, Genius Programs at Fair and Seminar in Konya, Turkey organized by Kontek Machine Company
Presented AutoCAD14, Rebis, AutoPLANT 3D Piping, 3D Equipment, 2D P&ID, Mechanical Desktop, Genius Programs at a seminar organized by Izmir Computer Fair Center.
Worked as a Trainer/Instructor and Technical Expert at Ares Computer C.O.
LECTURES
Gave Rebis training to below companies on Piping Design:
1. AkEnergy Factory (Bozüyük, Turkey) – 2 Day
2. Dusa Factory (Izmit, Turkey) – 1 Week
3. Trakya Glass Factory (Tekirdağ, Turkey) – 2 Day
4. KordSA Factory (Izmit, Turkey) – 2 Week
5. Can Yatching (Tuzla, Turkey) – 1 Week
|