| Ref # |  | JS187141 |
| Year of birth |  | 1971 |
Permanent/Home Location/Address |
| City or Town |  | Hagonoy, Bulacan |
| Country |  | PHILIPPINES |
Current Location/Address |
| Country |  | UNITED ARAB EMIRATES |
Languages |
| Primary Language |  | Fluency |
| Tagalog |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | PHILIPPINES |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Quantity Surveyor |  | 6 |
| Area Supervisor |  | 6 |
| Field Engineer |  | 4 |
| Industry |  | Years Experience |
| Civil Engineering |  | 10 |
| Water |  | 6 |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | Bachelor of Science in Civil Engineering | Bulacan State University, Philippines | 1993 |
Other Qualifications, Memberships, Certification
Philippine Institute of Civil Engineers |
Computer Skills and Software Used |
Computer Literate (MS Office: Word, Excel, PowerPoint, Access)
Knowledge in Primavera 3.0, MS Project and AutoCAD |
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will travel internationally
Yes - I will relocate internationally |  |
Availability |
| Earliest Start Date |  | Given 8 weeks notice |
Ideal Next Job |
| Quantity Surveyor |
Required Salary & Conditions |
| Minimum salary USD 4,000 per month plus paid housing and transportation |
Employment History |
| Total Years of Work Experience: |  | 18 |
| Commenced Full Time Work: |  | 1994 |
| Name |  | Hedley International Emirates Contracting LLC |
| Job Title: |  | Quantity Surveyor |
| Duration |  | From : 2007 To: |
Work Experience |
August 2007 - Present
Quantity Surveyor
HEDLEY International Emirates Contracting L.L.C.
Dubai, United Arab Emirates
Project - R800/3A – Ras Al Khor Crossing, Dubai, UAE
Project Cost - AED 613 Million
The Project comprises of eleven (11) Bridges grouped into two major interchanges which connect the new Ras Al Khor Main Road to the existing OUD Metha and 2nd Za’abeel Roads. The OUD bridges also cross over the new Business Bay Canal with associated road works, consisting of a multitude of access roads, ramps and slipways including the widening and improvement to the existing OUD Metha and 2nd Za’abeel Roads..
Construction of 4.7km 5-lane dual carriageway Ras Al Khor Main Road, extending from the new Fourth Creek Crossing (Business Bay Crossing) to the limit of work with Contract R800/3B at Za’abeel area.
The Project also involves extensive construction of new utility services into specified reservations for water, electrical, telephone and internet lines, irrigation, drainage, sewer and street lighting with two storm water drainage pumping stations.
A 40m wide, 842m long dual carriageway underpass (EP-2D) was added to the scope of the Project, comprising about 26% of the original contract value.
Job Description
Draft, discuss and finalize monthly interim payment certificates with the consultant.
Follow-up all approvals for “Request to Check” work and classify them according to the related bill of quantities in order to use them during preparation of interim payment certificates.
Monitor contract activities and correspondence for possible claims and assist the Project Manager in the preparation of claims and resolution of contractual matters.
Prepare cost analysis for valuation of extra works and variations and build new rates for items included in the scope of works but not itemized in the bill of quantities.
Draft contractual correspondence to consultant.
Conduct periodic recap of quantities at prefix intervals or as necessitated by major variations to the contract.
Prepare payment certificates for the works done by subcontractors.
Prepare the final accounts and ensure that the same is in accordance with as-built drawings.
April 2006 - July 2007
Quantity Surveyor
Al Huda Engineering Works
Doha, State of Qatar
Civil Project 685 - Rationalization of TSE System
Project Cost - QR 130 Million
Construction of two pumping stations (TSE1 and TSE2 Sites) each of 1,200 l/sec capacity.
Construction of Four Holding Tanks each measured 41.30 x 32.40 x 6.0 meters of 6500 m³ capacity.
Construction of 1,700 meters supply and connecting pipe works of Ductile Iron Pipes 600 to 1000 mm diameter and 1200 mm diameter.
Construction of twenty units valve and connection chambers including all necessary DI pipes, fittings and ancillaries.
Site Works including access roads, boundary walls, irrigation system, wash down system and landscaping.
Demolition of two existing TSE Towers (T2 and T4) and installation of bypass connections.
Construction of nine 1.0 m³ and two 65.0 m³ surge vessel chambers inside Doha TSE Network.
Job Description
Prepare and monitor the daily, weekly and monthly progress/accomplishments and preparing the monthly accomplishment reports.
Calculate and prepare the monthly valuation/billing according to the monthly progress/accomplishment of the project.
Coordinates and make survey/inquiry with the suppliers/sub-contractors regarding the materials to be used for the project and prepare the material submittals for approval by the Consultant.
Prepare estimates, take measurements, conducts survey to determine the materials, labor and equipments to undertake change/extra works according to site instruction by the Client which to be included in the variation order.
Write correspondences to the Consultant and/or the Client and make reply as well regarding the matters/subjects that needed clarification and approval.
June 2005 - November 2005
Project Engineer
Soprim Construction
Djibouti, East Africa
Light Industrial Units - Djibouti Free Zone
Construction of two units light industrial buildings with floor area of 150 x 60 meters each.
Construction of one unit two-story light office building with floor area 60.0 x 15.0 meters.
Job Description
Oversee and render close physical inspection and supervision of all on-going construction works to ensure compliance with the approved plans and specifications.
Prepare and design work program schedule, monitor the daily, weekly and monthly accomplishments and preparing the monthly accomplishment reports.
Assists the Sub-contractors in the prosecution of works by conducting inspection simultaneous with its performance and alerting the Sub-contractors to all adverse conditions and practices that may produce unacceptable work.
Monitor and controls the use of materials delivered on-site for installation in the project to minimize wastages.
April 1999 – June 2005
Operation Support Unit Head Maynilad Water Services, Inc.
MWSS Compound, Katipunan Road, Balara, Quezon City
Provides general support to the Operations Unit and supervise the withdrawal of materials and the utilization of all Vehicles, organic and rental.
Oversees the issuance of clearance on outright illegal, accounts with illegalities and IRDS accounts upon customer’s settlement of charges and endorses application for regularization and/or re-opening to Branch Office.
Approves payment terms for settlement of charges by installment mode and assigns work orders for temporary and permanent disconnection of illegal water service connections.
Drafts operating budget proposals in coordination with the Operations unit and in accordance with unit’s objectives, plans and budget guidelines.
July 1996 – February 1999
Field Engineer
Empire East Land Holdings, Inc.
21st Flr. World Center Bldg, Sen. Gil Puyat Avenue, Makati City
Primary responsibility is to oversee and render close physical inspection and supervision of all on-going construction works to ensure compliance with the approved plans and specifications.
To report any deviations from plans and specifications and where necessary, to stop work, whether in whole or in part, to assure compliance with the contract requirements in terms of materials and workmanship applied to the works.
Periodically cause for the samples to be taken of materials incorporated into the works and requests to have all the necessary tests to be conducted to assure compliance with quality requirements and acceptability of all works accomplished.
Assists the Contractor/s in the prosecution of works by conducting inspection simultaneous with its performance and alerting the Contractor/s to all adverse conditions and practices that may produce unacceptable work.
November 1994 - June 1996
Quality Control Engineer
First Solid Builders, Inc. Paliparan 1, Dasmariñas, Cavite
Monitoring and testing of materials such as cement, coarse and fine aggregates, soil samples, concrete samples (rectangular and cylindrical molds).
Preparing and conducting trial mixes.
Site monitoring and coordination with Site Engineers.
|
Last Updated on 21-Feb-11