| |
|
| Ref # |  | JS180118 |
| Year of birth |  | 1983 |
Permanent/Home Location/Address |
| City or Town |  | Merlimau |
| State |  | Melaka |
| Country |  | MALAYSIA |
Current Location/Address |
| State |  | Selangor |
| Country |  | MALAYSIA |
Languages |
| Primary Language |  | Fluency |
| Other |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | MALAYSIA |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Communications |  | 2 |
| CAD/CAM Engineer |  | 2 |
| Field Engineer |  | 2 |
| Electrical Commissioning Engineer |  | 2 |
| Project Engineer |  | 2 |
| Industry |  | Years Experience |
| Oil and Gas |  | 2 |
| Telecomms |  | 2 |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | B.Eng Electronic major in Robotic and Automations | Malaysia | 2007 |
Other Qualifications, Memberships, Certification
Obtain BOSEIT Including Offshore Orientation, First Aid/CPR/EAR/AED, Basic Fire Fighting, Sea Survival & Helicopter Underwater Escape Training (HUET) with EBS (SEQU Offshore Safety Sdn Bhd): Valid
Obtain CIDB Green Card (Construction Industry Development Board Malaysia): Valid
Obtain Permit To Work (PTW)
|
Computer Skills and Software Used |
Microsoft Office
Adobe Photoshop
MultiSim/PSpice
Matlab/Simulink/Fuzzy
Catia, AutoCad, FuzzyTech, MathCad, Visual Basic, C++ Language, PLC Software, Microcontroller Software Development, Macromedia Flash, Solid Works |
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will travel domestically
Yes - I will travel internationally |  |
Availability |
| Earliest Start Date |  | Given 4 weeks notice |
Ideal Next Job |
| Looking for work in a Maintenance, Field Support, Service Engineer role in Oil and Gas, Telecommunication Industries. |
Required Salary & Conditions |
| Minimum salary MYR4000 per month |
Employment History |
| Total Years of Work Experience: |  | 4 |
| Commenced Full Time Work: |  | 2008 |
| Name |  | Rites Sdn Bhd |
| Job Title: |  | Project Engineer |
Summary |
Discipline on multiple tasking such as telecommunication and electronics.
Responsible for preparing the project documentation
-Attending Valiant/Orion STM-1 SDH and PDH multiplexer training
- Project implementation and project planning
- Responsible for guide / advice the site supervisors on the technology or products
- May be required to perform other job-related duties as assigned
- Testing & Commissioning of Radio Link (1+0, Hot Standby & Frequency Diversity)
- Technical Support for installation
- Responsible to do BER Test E1 for radio Hot Standby, 1+0, 1+1 and Frequency Diversity
- Frequency scanning for microwave SDH and PDH
- Responsible for the supervision of project implementation works
- Responsible for the supervision, monitoring and enforcement of installation guidelines and standard in Radio Link installation
- Responsible for ensuring the quality and standard of work done sub-contractors
- Responsible for the testing, commissioning and cutover or radio links
- Responsible for the customer satisfaction in standard or works, safety, cleanliness and site access |
Work Experience |
Project Involvement (Onshore / Offshore):
I. Project: SITE SURVEY FOR NEW PUBLIC ALARM GENERAL ADDRESS (PAGA) SYSTEM
Location: PCSB – BEKOK-A (PMO)
Work Description: -Project Ongoing For Next Installation On NEW PAGA System-
Investigate existing PA system and Paging Telephone. Determine the functional and weakness on old Public Announcement (PA) system. Need to advice an advantage on new system (PAGA).
II. Project: PROVISION OF MAINTENANCE FOR TELECOMMUNICATION EQUIPMENTS
Location: NIPPON OIL EXPLORATION (NOEX) - HELANG INTEGRATED PLATFORM (HIP)
Work Description: -Preventative Maintenance (PM) Project Contract For 5 Years-
Preventative maintenance for telecommunications equipments on physical, mechanical, and electrical aspect. On this maintenance, the equipments have been PM are HF SSB SKANTI RADIO SYSTEM, PAGA SYSTEM, ALCATEL MICROWAVE RADIO SYSTEM, VHF FM RADIO SYSTEM & VHF AM RADIO SYSTEM.
III. Project: PROVISION TO DESIGN, SUPPLY, INSTALL AND COMMISSIONING OF DIGITAL MICROWAVE RADIO FOR D35 PLATFORM TO BAYAN PLATFORM (SARAWAK OPERATION OFFICE) FOR PETRONAS CARIGALI SDN BHD – SARAWAK OPERATIONS (PCSB-SKO)
Location: PCSB – D35, BAYAN-A PLATFORM (SKO)
Work Description: -Project 100% Finished-
Installation and commissioning on NEW 2GHz Digital Microwave Radio (DMR) Link from D35 platform to Bayan-A platform. The 4RF radio has been use on this project.
IV. Project: KUMANG CLUSTER DEVELUPMENT PROJECT – PACKAGE 1 (TROPOSCATTER BETWEEN KAKG-A PLATFORM AND BOCC) & PACKAGE 3 (ENTERTAINMENT SYSTEM FOR KAKG-A PLATFORM & PAGA SYSTEM FOR KAKG-A, KUJT-A, F9JT-A PLATFORM)
Location: PCSB – KAKG-A, KUJT-A, & F9JT-A PLATFORM (Onshore at SDE Yard)
Work Description: -Project Still Ongoing-
I have assigned to handle this project. I have been involved in Engineering, Installation and Pre-commissioning for this project. On this PAGA system, the Spector Lumenex product has been use.
V. Project: PROVISION TO DESIGN, SUPPLY, INSTALL AND COMMISSIONING OF TELECOMMUNICATION INFRASTRUCTURE FOR PC4 DEVELOPMENT PROJECT – TELECOMMUNICATION PACKAGE (VHF FM & AM, NDB AND DMR BETWEEN PC4 & B11)
Location: PCSB – PC4 PLATFORM (SKO)
Work Description: -Project 100% Finished-
I have been involved in FAT, installation, SAT and commissioning on telecommunication equipment for this project. The product that has been uses on this project are; 4RF-DMR, SAC-NDB and VHF FM & AM-SAILOR & Jotron Radio.
VI. Project: ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR J4 DEVELOPMENT PROJECT – TELECOMMUNICATION PACKAGE (VHF FM & AM AND NDB SYSTEM)
Location: PCSB – J4 PLATFORM (SKO)
Work Description: -Project 100% Finished-
I have been involved in installation, SAT and commissioning on telecommunication equipment for this project. The product that has been uses on this project are; SAC-NDB and VHF FM & AM-SAILOR & Jotron Radio.
VII. Project: SITE SURVEY FOR NEW PUBLIC ALARM GENERAL ADDRESS (PAGA) SYSTEM
Location: PCSB – RCPP & RDP-A (PMO)
Work Description: -Project Ongoing For Next Installation On NEW PAGA System-
Investigate existing PA system and Paging Telephone. Determine the functional and weakness on old Public Announcement (PA) system. Need to advice an advantage on new system (PAGA).
VIII. Project: MALAYSIA OFFSHORE NETWORK (MON) PROJECT – UPGRADE DIGITAL MICROWAVE RADIO
Location: EXXONMOBIL – IBA PLATFORM
Work Description: - Project 100% Finished -
I have been involved in installation, SAT and commissioning on Digital Microwave Radio for this project. This purpose of this project is to upgrade link between ExxonMobil platforms. The product used in this project is Harris Stratex radio.
IX. Project: PROVISION FOR REPLACEMENT AND MAINTENANCE OF DIGITAL MICROWAVE RADIO FOR PETRONAS CARIGALI SDN BHD – SARAWAK OPERATION (SKO)
Location: LABUAN
Work Description: -Project Ongoing-
I have been involved in design, engineering and integration test for this project. This project involved 7GHz digital microwave radio including multiplexer and switch router to provide new upgraded link between PCSB Platform at Sarawak water. The products used in this project are SAF CFM radio, Valiant and Cisco.
X. Project: BEKOK-C PLATFORM PAGA REPLACEMENT
Location: PCSB – BEC (PMO)
Work Description: -Project Ongoing-
I have been involved in design, engineering, installation and commissioning for this project. The objective of the project is to replace the old PA & Alarm system into new PAGA system. Spector Lumenex product has been use.
XI. Project: PM9 PAGA UPGRADE PROJECT
Location: PCSB – PM9 (PMO)
Work Description: -Project Ongoing-
I have been involved in site survey, design and engineering for this project. The project still in engineering design stage and involving with 8 platforms and 3 onshore plants. The objective of the project is to replace the old PA & Alarm system into new PAGA system. Spector Lumenex product has been use.
|
Comments/ Hobbies/ Interests etc: |
| Exploration and production, Oil & Gas, Plantation, Instrumentation and Control System, Computers technology, Electrical & Electronics product, Mechanical tools, Soccer and Futsal |
Last Updated on 12-Oct-11
|