| |
|
| Year of birth |  | 1963 |
Current Location/Address |
| City or Town |  | Aleksandrów Łódzki |
| State |  | 95-070 |
| Country |  | POLAND |
Permanent/Home Location/Address |
| Country |  | ROMANIA |
Languages |
| Primary Language |  | Fluency |
| English |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | POLAND |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Resident Engineer |  | 4 |
| CAD Designers |  | 7 |
| General Manager |  | 8 |
| Piping Designers |  | 15 |
| Project Management/Coordination |  | 15 |
| Industry |  | Years Experience |
| Consulting Engineer |  | 15 |
| Water |  | 15 |
| Civil Engineering |  | 4 |
| Pipelines |  | 15 |
Qualifications |
| Highest Qualifications |  | Masters |
| Qualification | Subject | Establishment/Country | Year |
| Masters or Higher | Construction | Poland | 1987 |
Other Qualifications, Memberships, Certification
ICE |
Computer Skills and Software Used |
| AutoCAD 3D, ProEngineer, Excel, Word |
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will travel internationally
Yes - I will relocate internationally |  |
Availability |
| Start Immediately? |  | Available Now |
| Earliest Start Date |  | 01/03/2010 |
Ideal Next Job |
| Looking for Team Leader/Resident position for WWTP/sewerage system construction supervision |
Required Salary & Conditions |
| Contract basis, minimum salary 500 Euro per working day |
Employment History |
| Total Years of Work Experience: |  | 23 |
| Commenced Full Time Work: |  | 1987 |
| Name |  | Ramboll\PM Management\Sogreah |
| Job Title: |  | Team Leader/Resident Engineer |
| Duration |  | From : 2007 To: 2009 |
Work Experience |
CURRICULUM VITAE
1. Family name: WYPLOSZ
2. First name: PIOTR
4. Nationality: Polish
5. Civil status: Divorced
6. Education: Technical University - Civil Engineering
Institution [ Date from - Date to ] Degree(s) or Diploma(s) obtained:
1982-1987 Technical University of Lodz, Department of Construction
Degree: Master of Science Civil Engineer
7. Language skills - Indicate competence on a scale of 1 to 5 (1-excellent, 5 - basic)
Language Reading Speaking Writing
Polish Mother’s language
English 1 1 2
Russian 1 1 2
8. Membership of professional bodies: Institute of Civil Engineers – United Kingdom
9. Other skills, e.g. Computer literacy, etc.: AutoCAD 2D and 3D– proficient user, ProEngineer(3D) – beginner, MS Office (Word, Excel, Access, PowerPoint, etc.); Internet – proficient user; Driving license - 20 years of experience
10. Present position:
• Team Leader/Supervisor on EU Project (TACIS) for WWTP & Sewage Pumping Station construction with network in Russia
• Resident Engineer for WWTP construction in Romania (ISPA measures)
12. Key qualifications:
• 22 years of professional experience in design, construction supervision & contract management of major infrastructure projects, sewerage reconstruction and extension, sewage treatment plants constructions and distribution schemes in Poland / Ukraine / Russia / Germany / China / UK / Denmark on both contractors and consultants side;
• In depth knowledge at management of teams of local and international engineers on high cost infrastructure projects with considerable M & E components;
• Clear understanding and working experience with FIDIC Conditions of Contract and experience in management of international construction projects: FIDIC 4th edition and FIDIC 1999 – FIDIC Conditions of Contract for Plant and Design-Build (Yellow Book) and FIDIC Conditions of Contract for Construction (Red Book);
• Extensive experience and contractual knowledge of FIDIC Contracts;
• Working knowledge in Approval of progress payments to the Contractors, evaluation and processing of variation orders and handling of changes, Contractor's Interim Payment Applications, handling of contractor’s claims, etc.;
• Experienced in taking part in the project completion & closing procedures with issuing the Reports on completed works for the scope of the Final Inspection.
• Familiar with activities throughout the Defect Notification Period and thorough knowledge of the working requirements for all kinds of Site Progress Reports templates;
• In depth knowledge on evaluation of claims and conflict management (Dispute Adjuration Board - DAB procedures);
• Experience both as a Designer and Contract Manager provided him with in depth knowledge needed for successful administration and management of various contractor’s claims and handling of variations orders, supervision and keeping under control any unexpected changes in the projects in accordance with the Beneficiary’s needs.
• Involved in the preparation of bids for various ISPA projects. Consequently, familiar with Phare manual and EC contract procedures, aware about harmonisation of FIDIC conditions of contract with EC procedures and National regulations;
• Quality Assurance, Quality Control activity and Health and Safety Procedures during the construction phase at the site;
• Highly experienced in construction site supervision and contract management and administration;
• Previous experience as Site Engineer, Design Engineer, Construction Manager, and Project Manager;
• Good communication skills, liaison and negotiating skills with both Contractors and Clients.
13. Specific home and international experience:
Country Date from – Date to
Romania 2009 – up to date
Russia / Denmark 2008 - up to date
UK 2007 – 2008
Poland / China / Russia 2004 - 2007
Poland / Germany 1996 – 2004
Poland 1987-1992 / 1993 - 1996
Ukraine 1992-1993
14. Professional Experience Record :
Date
month/year Location Company Position Description
October 2009 –
up to date Romania Consortium Sogreah / ILF / PM International Resident Engineer
Project of Sewage Treatment Plant construction for Drobeta Turnu Severin, Romania. The plant capacity Q=50.000m3/d.
Activities: supervision of works basis on red FIDIC. Monthly reports, verification o works in compliance with the works contract and Romanian regulations, technical assistance to the Project Implementation Unit, interim payment certificates approval, verification of design.
Project co-financed by EU within ISPA measures, value 41M Euro.
June 2008- up to date Russia RAMBOLL DK Team Leader / Resident Engineer
Project of Sewage Treatment Plant construction for Gusiev city, Russia. WWTP capacity of Qdmax=18 000m3/d is consisted of: main pumping station, preliminary treatment, grit and grease removal, 2 circle concrete treatment tanks, compact sludge pumping station, sludge thickener and sludge beds, SCADA.
Activities: review of reports delivered by contractor (eg. Environmental impact report, manuals and instructions, works schedule), design review, construction supervision, verification of compliance with EU and Russian regulations, linkage between stakeholders: Russian Contracting Authority, EC Funding Agency, EC monitoring unit and local maintenance company. Organization of Progress and Steering Committee Meetings, month and quarterly reports, construction completion report, design review report, administrative orders.
Payment certificates approval, monitoring of the project budget.
Training of local maintenance company (Vodokanal).
Control of implementation of provisions from Works Contract and Supervision Contract so overall aims of the project are reached.
Project co-financed by EU within the frames of TACIS programme (contract price €7 mil).
September 2007-
May 2008 UK HALCROW Group Ltd Senior Engineer / Project Manager
Analysis of flooded areas in South England catchment region - Camberley, Woking, Swindon, reporting to the regional water utility operator, Thames Water Co.
Rising mains rehabilitation in Ascot– technical analysis of relining methods available and detailed design.
Project budget and works schedule configuration and confirmation with the Client (Thames Water).
Evaluation of Health&Safety plans, environmental reports, as well as preliminary surveys with data collection for the project.
May 2004 –September 2007 Poland MW Projekt
sp. z o.o.
Consulting Engineers Team Leader /
Project Director
Site Supervision activities encompassed management of the works contractor, project plans approval, work quality monitoring in relation to design criteria, approving design changes to suit unexpected site conditions changes, materials & construction methodology approval, approval of weekly and monthly valuation certificates, approval of variation orders, compliance with conditions of contract etc.
Projects included Waste Water Treatment Plant, surface water and drainage networks as well as sewage treatment works and drinking water distribution. Notable projects included:
• Waste Water Treatment Plant and potable water pipe networks in Grodzisk Mazowiecki (50km dia200mm-1200mm). Project value €11mil. Value of works supervised ab €3mil.– project co-financed by EU;
• Construction of new wastewater systems in Łódź – 3 technological lanes that were designed for inflow of Qaverage = 215,300 m3/d (Qmax h = 11,850 m3/h) with anaerobic chambers, anoxic chambers, aeration chambers, secondary settling tanks. The project was done for BIWATER UK and Warbud S.A . Contract value €11mil. – Project co-financed by EU.
• Waste Water Treatment Plant in Łodź (100km dia200mm-1200mm) plus rehabilitation of old collectors (100km dia200mm-1600mm shapes: egg, bell, pear) – sub-contracts No.03 (contract value €50mil.), No.07 (contract value €60mil.) and No.08 (contract value €45mil.). Value of works supervised ab €8mil. – project co-financed by EU;
• Preliminary study and then detailed design of WWTP “Radocha” with capacity Qdmax=65 000m3/d and sewage system of trunk sewer “Bobrek” catchment (50km of pipeline dia600mm-1400mm including 7pumping stations) in Sosnowiec. Project price ab €17mil., value of works supervised ab €2mil - project co-financed by EU;
All projects were let under EU requirements (FIDIC yellow and red book).
November 1996 –
April 2004 Germany/ Poland
Bauku Polska
sp. z o.o Team Leader/
Project Director
Senior Management and Technical Supervision.
Plastic pipe system completion and delivery to Contractors working on EU financed projects.
The company was associated with German manufacturer of large diameter plastic pipes up to 3500mm inside diameter and pre-fabricated objects made of polyethylene PEHD and polypropylene PP.
The pipes and prefabricated objects were used for various environmental and industrial purposes: eg. Pipeline systems for sewerage, water supply, drainage, surface water retention, landfill gas collection and for storage and treatment of various chemical liquids including very corrosive ones as well as minor wastewater treatment plants.
Projects implemented:
• Small and medium size compact, prefabricated treatment plants for individual households, small enterprises and small agglomerations. Evaluated 3 series of types constructed in over 200 small individual projects:
In house project evaluated by Professor Marek Lebiedowski from Technical University of Łódź. Manufacture of small and medium size Waste Water Treatment Plants (up to 500 People Equivalent) based on biological treatment.
License from Institute of Rural Development, Warsaw (IBMER) for manufacture of spraying peat waste water works destined especially for small and medium size farms
License from Polish Academy of Science for manufacture of waste water works with treatment technology leaned on selected plants (ECOPAN)
• Łódź sewage treatment plant – technological pipe net dia 800–1000mm with associated fittings fit-made for return sludge,
• Aleksandrów Łódzki collector dia 800mm L=2km along with technological net inside waste water plant Qdmax=10000m3/d
• Over 50 pumping stations for Flyght Polska and Abbud and Ecopartner
• Over 70 storage and processing tanks for reagents dosage implemented in WWTP in Jaworzno, Jastrzębie Zdrój, Biłgoraj, Wałbrzych, Sochaczew and others.
• Over 15 retention tanks capacity 1000-3000 m3
• Grease separator with treatment elements designed individually for McDonald’s Polska
• Delivered over 100km of sewage pipes dia 200mm up to 1800mm to Poland, Russia, Ukraine and Czech Republic
March 1993 –
September 1996 Poland MW Projekt
sp. z o.o. Team Leader/ Technical Director
Responsible for company management and construction supervision of Waste Water Treatment Plant, surface water and drainage networks as well as sewage treatment works. Main responsibilities included:
• Site supervision in terms of design compliance with construction;
• Collecting and revision of formal data. Data collected from state and/or city standards (master plans of territorial space management);
• Legal studies for properties access in compliance with designed pipe network;
• Agreements with maintenance companies and Client representatives;
• Regular meetings with contractor - site problem solving - evaluation of working drawings
• Work co-ordination between different office teams and subcontractors (constructors, electricians, road designers;
• Daily monitoring of bank cash flow;
• Cooperation with different company departments (lawyer, accountant);
• Scheduling of work.
• Trunk sewer to sewage treatment plant in Aleksandrów L=4km dia800mm;
• Trunk sewer: the IIA in Ozorków –L=3km dia500mm-600mm
January 1992 -January 1993
Ukraine
MJ International Ltd, and State Ukrainian Refinery
Assistant to Contract Manager, Translator and Resident Engineer Contract – Lisitshansk refinery office and laboratory refurbishment. Client – Ukrainian State Refinery in Lisitshansk. Number of workers up to 150. Contract value over USD17mil.. Contract executed under British standards adapted to Ukrainian conditions.
• Responsible for Daily site supervision and work co-ordination between different groups of workers (bricklayers, plasterers, painters, tillers, carpenters and plumbers, electricians). Work charts and reports to Project Director. Logistic and coordination of tools and heavy equipment delivery on site (hoists, cranes, scaffolds, tip-lorries, dump-trucks). Ukrainian subcontractors supervision. Russian-Polish-English translations. Social care of the Polish crew.
October 1987 -
May 1991 Poland Enterprise of General Structure
“PBO-Zachód” Site Engineer / Resident Site Manager
Contract for construction of several blocks of flats and school and kindergarten in two different locations in Aleksandrów and in Łódź; The number of workers up to 250. Responsible for daily site supervision and work co-ordination between different groups of workers (concrete slab assemblers, steel fixers, bricklayers, plasterers, painters, tillers, carpenters and plumbers, electricians). Making work charts and schedules. Reporting to Project Manager. Logistics and coordination of tools and heavy equipment delivery on site (hoists, cranes, scaffolds, tip lorries, dump trucks, bulldozers). Project value over USD130mil. Value of works supervised ab USD7mil. Projects description:
• Blocks of flats in Aleksandrów settlement consisted of4floor buildings with 36 or 48 flats (2-5 rooms) – totalling 14 buildings;
• Łódź-Radogoszcz settlement consisted of blocks of flats 4 floor buildings with of 36 or 48 flats (2-5 rooms) – totalling 5 buildings;
• School and kindergarten for 1,200 pupils – 4 floor building with sporting hall;
• Local shopping centre - 20 + 32 +10 shops.
|
Comments/ Hobbies/ Interests etc: |
| 3D CAD design, diving, aikido |
Last Updated on 24-Jan-10
|