| |
|
| Year of birth |  | 1972 |
Permanent/Home Location/Address |
| City or Town |  | Lagos Suburb, P.O. Box 19607, Ikeja |
| State |  | Lagos |
| Country |  | NIGERIA |
Current Location/Address |
| State |  | Lagos |
| Country |  | NIGERIA |
Languages |
| Primary Language |  | Fluency |
| English |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | NIGERIA |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Mechanical Engineer |  | 7 |
| Project Engineer |  | 6 |
| Building Services |  | 7 |
| Assistant Resident Engineer |  | 3 |
| HVAC Engineer |  | 6 |
| Industry |  | Years Experience |
| Engineering |  | 7 |
| Consulting Engineer |  | 5 |
| Oil and Gas |  | 2 |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | Mechanical Engineer | Bayero University, Kano, Nigeria | 2003 |
Other Qualifications, Memberships, Certification
2010 Project Management Professional [PMP] - In view
2009 Council for the Regulation of Engineering in Nigeria[COREN]–In view
2008 Nigerian Society of Engineers [NSE]
2003 B. Eng (Mechanical) Bayero University, Kano (Nigeria)
2006 Certificate of Completion [CCNA, CITESS (Comptia A+)] |
Computer Skills and Software Used |
AUTOCAD - Excellent
Microsoft Office Suit -- Excellent
MS Project - Excellent
Comptia A+ [Networking] - Basic
and Various Software. |
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will travel domestically
Yes - I will relocate domestically
Yes - I will travel internationally
Yes - I will relocate internationally |  |
Availability |
| Start Immediately? |  | Available Now |
| Earliest Start Date |  | Given 1 weeks notice |
Ideal Next Job |
| In Search of opportunity in an environment with outstanding promises where contribution truly counts amidst talented and dedicated team who thrive on innovation and strives for excellence in an Organization dedicated to workforce diversity with World Class Vision. |
Required Salary & Conditions |
| Good Salary and Good Working Condition with growth and development |
Employment History |
| Total Years of Work Experience: |  | 7 |
| Commenced Full Time Work: |  | 2003 |
| Name |  | Premier Energy Ltd |
| Job Title: |  | Project Engineer |
| Duration |  | From : 2008 To: 2009 |
Summary |
| In Search of opportunity in an environment with outstanding promises where contribution truly counts amidst talented and dedicated team who thrive on innovation and strives for excellence in an Organization dedicated to workforce diversity with World Class Vision. |
Work Experience |
SUMMARY:
I have wide exposure to engineering projects from conception to commission covering planning, design, technical specification, tender process, developing cost baseline for cost control and performance measurement using applicable industrial standards. With considerable experience in Facility Management [Design and develop effective plan/schedule and logs for proper servicing and maintenance for installed equipments on each project to assure quality of service, reduce facility down-time and prolong the life-span].
DETAILS:
COMPANY: PREMIER ENERGY LTD Lagos. [June 2008 – Feb. 2009]
POSITION: Project Engineer [Contract]
JOB DISCRIPTION:
• Preparation of Contract/ Bid Document for various forms of projects.
• Supports the setting and reviewing of projects Management Improvement Programs.
• Project risk analysis to evaluate potential problem areas and proffer solutions.
• Develop and implement relevant initiatives or solution for internal technical challenge in project execution to fast-track project in-line with corporate business plan.
• Participates in preparation of Project Cost Estimates [Cost Baseline], Cost Control to keep to budgeted cost by developing appropriate expenditure and timely financial closeout.
• Participates in the preparation or modification of projects Operation Reference Plan, Work Breakdown Structure, Integrated Activity Plan and Manpower Plans across projects and team.
• Direct, Monitor and Control project works in-line with ORP, WBS & IAP to achieve projects completion within deadline.
• Ensures quality of work is achieved and safety regulations are been adhered to & complied with in all operation.
• Facilitates and supports the use of all relevant Standards in job execution.
COMPANY: INTERPLAN ENGINEERS (Chartered Engineers& Consultants) Lagos. [Jan. 2004 – May 2008]
POSITION: Mechanical Design/Project Engineer
JOB DISCRIPTION:
• Design and Supervision of Mechanical and Electrical Engineering Services.
• Prepare Project Detail Design, Technical Specification and Confidential Estimated Costing package for Tender Process and control project cost during execution.
• Attend Site meetings, Resolve site problems, provide technical clarifications and check drawing discrepancies with site situations to review project specifications if required.
• Coordinate and monitor activities of vendors/supplier and subcontractors to ensure installation of genuine products and proper maintenance.
• Ensure quality of work is achieved and safety regulations are been complied.
• Design and develop an effective plan/schedule and logs for proper servicing and maintenance for installed equipments on each project to assure quality of service, reduce facility down-time and prolong the life-span.
• Develop simplified operation procedure for installed facilities in-line with acceptable standard safety procedure and in accord with manufacturers guide.
• Prepare facility checklists and site reports.
PROJECTS EXPERIENCES:
PPMC PROJECTS [2008]:
Participated in the refurbishment of Gate Valves of various sizes at Atlas Cove Depot.
UNIVERSITY OF ABUJA PERMANENT SITE PROJECTS 2006 - 2008:
Participated in Planning, Detail Design, and Preparation of Technical Specification with Confidential Cost Estimated package [BEME] for Tender process and valuation of work done for payment. Supervised Construction of the following projects:
Lecture Theatre Phase I&II Mechanical Services [Fire Fighting/ Protection,
Plumbing, Fuel Dumps, HVAC Systems]
Main Library Complex Mechanical Services,
Power House &Switch Yard Mechanical Services,
33/11KV Injection Substation; Installation of Street Lighting Scheme,
11KV overhead line & 500KVA 11KV Compact Substation.
Also, Support the Project Team for proper and detail valuation, time and cost impact analysis during contract change/claims process.
Insights/ Achievements:
The project provided me a platform to deepen my Electrical engineering knowledge and widen project management experience further. It also affords me a great insight to project cost control, project performance measurement/ review and risk management.
MOBIL OIL NIGERIA PLC [EXXONMOBIL] 2006 - 2008:
Involved in Bid evaluation and Supervision, Inspection, Valuation of work done for payment process, Testing and Commissioning of Installation of all Mechanical Services [Fire Fighting/ Protection, Plumbing, Water Treatment Plant and HVAC Systems] in the Construction of Mobil ‘On The Run’ (OTR) Projects in the following locations:
Mobil OTR (Back Court) Abuja;
Mobil OTR (Retrofit) Lekki II;
Mobil OTR (Retrofit) Ikeja;
Mobil OTR (Back &Forecourts) Apapa.
Insights/ Achievements:
This was Pan African Mobil project meant to convert existing filling stations to a combination of Eatery and Filling station at strategic location in major cities of her outlets. Our cost baselines were determined using many risk factors due to the project peculiarities which later proved to be accurate and helpful. These projects broaden my experience and insight to risk factors in facility upgrades.
BRAITHWAITE MEMORIAL HOSPITAL [BMH] PORT-HARCOURT [2006].
Participated in Planning, Detail Design, and Technical Specification with Estimated Cost package for Tender process of all Mechanical Services [Plumbing, HVAC, Fire Prevention & Fighting and Gas pipe networks] for BMH Project.
Insights/ Achievements:
This Project was in collaboration with Phillips Project Center (PPC) and SIMED International which affords me experience in hospital facility requirement and privilege to work with international experts on Hospital Facility Design. This gave me in-depth knowledge of design specification for Hospital of international standard and how to meet specific requirement of HVAC, Gas Piping Network, Water Supply and Waste disposal systems.
CENTRAL BANK OF NIGERIA, KANO BRANCH PROJECT [2004 – 2006]:
Supervised the Execution, Inspection, Testing and Commissioning of the following systems: Fire Fighting, Plumbing, Water Treatment Plant, Fuel Dumps, Lift and HVAC using applicable standards. Also carried out detail valuation, proper time and cost impact analysis during contract change/ claims process and achieved successful project completion.
Insights/ Achievements:
The project spanned over two year and served as a gateway to practical project handling experience. Designs were done, Risk factors were analyzed, Cost baselines were developed and the project was executed with little above budgeted cost due to changes introduced during construction. The project was successful.
UNITED BANK FOR AFRICA [UBA] NETWORK BRANCHES, LAGOS [2006]
Design & Supervision of Mechanical Services [Plumbing, HVAC, Fire Prevention & Fighting and Waste] for two Branches of United Bank for Africa (UBA) in Lagos. Involved in Bid evaluation, Testing and Inspection and Commissioning.
Insights/ Achievements:
This project was developed to meet the growing customers demand for banking services. The project affords opportunity to handle project from conception to commission covering; planning, design, developing cost baseline, risk analysis, tender analysis, execution and commission. Every aspect of the project was carried out using applicable industrial standards and codes of practice. The objectivity of the team made the project a great success. It was a great experience.
NASARAWA STATE 60 BED UNIT HOSPITAL LAFIA & AWE [2006-2007]
Participated in Planning, Detail Design, and Technical Specification with Estimated Cost package for Tender process of all Mechanical Services [Plumbing, HVAC, Fire Prevention & Fighting and Waste] for Nasarawa Hospital Project Prototypes.
Insights/ Achievements:
This Project was in collaboration with Phillips Project Center (PPC) and it deepens my Hospital design knowledge.
OFFICE COMPLEX & MULTIPURPOSE HALL FOR GCDC, AT ISHERI [2007].
Handled the Designs of Mechanical Services [Fire Fighting System, Plumbing Services and HVAC Systems], Preparation of BEME & Technical Specification for the Projects.
COMPANY: POMECH ASSOCIATES Kano
POSITION: Graduate Trainee (Student Industrial Work Experience – SIWES – II)
Sept.2001-April, 2002.
JOB DISCRIPTION: Trained on Design of: Water Supply System, General Pipe Work, HVAC, Fire Fighting & Protection and Waste Disposal Systems, Effective estimation of installation cost, Preparation of Engineering Bills, Project management and Supervision.
AMINU KANO TEACHING HOSPITAL (AKTH) PROJECTS:
Supervised the Electrical and Mechanical installation of 20 residential apartments for Nurses at AKTH [includes Fire Fighting System, Plumbing Services and HVAC Systems].
JIGAWA STATE EXPORT PROCESING ZONE (JSEPZ) PROJECTS:
Participated in Planning, Detail Design, and Preparation of Technical Specification with Confidential Cost Estimated package [BEME] for Tender process of JSEPZ. [JSPEZ is made of centralized Water supply systems from bore hole with water treatment plant; several offices complex, warehouses etc.
COMPANY: NAHUTA HEAVY DUTY Ltd, Kano
POSITION: Graduate Trainee (Student Industrial Work Experience – SIWES – I)
Oct.1999 -Jan.2000.
JOB DISCRIPTION: Trained on maintenance of heavy-duty engines of various capacities: Including Generators, Trucks, and Tractors. Servicing of Injector Pumps, Nozzle and other general services.
PROJECTS EXPERIENCE:
• Overhauling of generator sets for Capital Plastic Ltd, Kano.
• Service and overhauling of injector pumps and engines for several Trucks, Lorries and Tractors for Nahuta’s several clients.
COMPANY: AMALGAMATED PLASTIC INDUSTRY Ltd, Kano
POSITION: Machine Operator/ Maintenance Assistant (1995-2000).
JOB DISCRIPTION: Machine Operator/ Maintenance Assistant on extrusion machines, mixing and slitting machines. Also work on Part-time on semester breaks.
|
Comments/ Hobbies/ Interests etc: |
| Reading, Researching, Learning, Teaching, Cartoon, and Games. |
Last Updated on 14-Jan-10
|