| |
|
| Year of birth |  | 1980 |
Permanent/Home Location/Address |
| City or Town |  | Manila |
| Country |  | PHILIPPINES |
Current Location/Address |
| Country |  | UNITED ARAB EMIRATES |
Languages |
| Primary Language |  | Fluency |
| Tagalog |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | PHILIPPINES |
| Other Nationality |  | PHILIPPINES |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Piping Designers |  | 3 |
| HVAC Engineer |  | 1 |
| PDMS/PDS Designers |  | 3 |
| Power |  | 3 |
| Industry |  | Years Experience |
| Oil and Gas |  | 2 |
| Petrochemical - Refinery |  | 2 |
| Power |  | 3 |
| Engineering |  | 1 |
| Pipelines |  | 2 |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | B.S. Mechanical Enginnering | Pamantasan ng Lungsod ng Maynila | 2002 |
| HNC/ONC/Certificate | Licensed Mechanical Engineer | Philippines | 2003 |
Other Qualifications, Memberships, Certification
1) Philippines Society of Mechanical Engineer |
Computer Skills and Software Used |
1) Windows Applications (MS Word, MS Excel, MS PowerPoint, and etc.)
2) Smart Plant Review (SPR)
3)AutoCAD
4) Smart Plant 3D (SP3D)
5) Intergraph Plant Design System (PDS)
6) Intergraph Smart Sketch
7) Microstation
8) LFM Laser Mapping
|
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will travel internationally
Yes - I will relocate internationally |  |
Availability |
| Start Immediately? |  | Available Now |
| Earliest Start Date |  | Given 4 weeks notice |
Ideal Next Job |
Looking for job where I can apply my extensive knowledge, skills, and experience in Engineering Fields in a highly motivated, forward looking multicultural company.
I'm open to all offers whether on a married or single status basis. |
Required Salary & Conditions |
1) Minimum salary of USD 2000 per month (negotiable)
2) + Meal allowance
3) + Transportation
4) + Boarding and lodging |
Employment History |
| Total Years of Work Experience: |  | 6 |
| Commenced Full Time Work: |  | 2004 |
| Name |  | Al Masaood Bergum L.L.C. |
| Job Title: |  | Piping Designer/Architectural Draftsman |
| Duration |  | From : 2009 To: 2009 |
Summary |
Has a total of 6 years relevant experience in the field of Mechanical Design Engineering related to various Power Plant, Oil and Gas and Petrochemical industry, HVAC, Accomodation, and Naval Architecture.
Started my career as a Cadet engineer during my On-Job-Training for HVAC design from various customer/establishment. Three years experience came from Hitachi Ltd., as a Fabrication Engineer dealing with preparation and issuance of detailed fabrication isometric drawing for construction. Two and a half years experience is with Fluor Daniel Inc. as a Piping Designer. Presently working with Al Masaood Bergum as a Piping designer/Architectural Draftsman.
At age 22, I’m able to work independently with minimal supervision, ability to manage people, and one of the youngest to handle a project. Good planning and organizational skills, good analytical and interpersonal skills, self-motivated, fast learner and hard working. Have the ability to decide in technical matters using applicable codes like ASME/JIS/DIN standard or by experience. I’m able to communicate in English, both written and oral.
As a Piping Designer, job includes: (1) Piping layout such as designing and engineering of pipes and pipe route from one equipment to another including pipe rack routing using Intergraph Plant Design System (PDS), Microstation Equipment 3D modelling, Smart Plant Review (SPR), Smart Plant 3D (SP3D) and AutoCAD; (2) Provide piping plans and related piping isometrics that will supply construction and fabricators with sufficient details for prefabrication and installation of piping systems; (3) Coordinate piping design activities with other groups within Piping discipline to ensure control of piping material quantities, completion of piping model works, and stress analysis of required system; (4) Interface with the Equipment engineers establishing preliminary equipment data requirements and outlines. Review Supplier’s drawings for economic studies of equipment and piping systems; and (5) Prepare project planning, plot development, and design models for Client review. Interface with Construction and all design engineering and engineering groups during development.
|
Work Experience |
A) AL MASAOOD BERGUM L.L.C.
Location : Jebel Ali Industrial Area 3, Dubai U.A.E.
Position : Piping Designer/Architectural Draftsman (Offshore Department)
Duration : December 2009 – Present
Job Description:
Preparation/Design of drawings for Piping, Mechanical, Architectural, and Structural drawings/arrangement.
Produce/amend drawings in accordance with directed requirements/specifications.
Checking drawings to ensure quality/error free before handing to the Design Coordinator.
Coordinate piping design activities with other designer to ensure quality of works.
Preparation and checking of MTO’s based on the drawings produced.
Checking other deliverable drawings (Structural, Civil, Electrical, and Mechanical) for possible design issue problems that will cause re-works during construction phase.
Coordination/Interface from site crew to resolved queries.
PROJECT INVOLVEMENT:
1) Project Name: Deep Panuke
Offshore Nova Scotia
Date: On-going
Works Handled:
a) Hot and Cold Water System
b) Grey Water System
c) Black Water System
d) Fire Water System
2) Project Name: 22.0m Crew Boat
DULSCO
Date: On-going
Works Handled:
a) Piping Arrangement for Engine & Genset Exhaust
b) Mechanical/Structural drawings of Fresh Water Tank
c) Schematic drawings for Potable water system, Bilge and Fire system, Fuel
system, and Seawater cooling system
d) Penetration Detailed Drawings
e) Detailed drawings of Seawater Strainer
B) FLUOR DANIEL INC.
Location : Alabang Muntinlupa, Philippines
Position : Piping Designer – Drafter IV
Duration : July 2007 – September 12, 2009
Job Description:
3D Pipe and Equipment Modeling, Designing and Engineering of pipes and pipe route from one equipment to another including pipe rack routing using design tools software to accomplish assigned tasks with good design quality within allotted schedule and budgeted hours.
Produces and checks complex pipe route, and electronic file models in accordance with applicable practices, codes, specifications, procedures and specific contract requirements.
Provide piping plans (GA) and related piping isometrics that will supply construction and fabricators with sufficient details for prefabrication and installation of piping systems.
Coordinate piping design activities with other groups within piping discipline to ensure control of piping material quantities, completion of piping model works, and stress analysis of required system.
Interface with the Equipment engineers establishing preliminary equipment data requirements and outlines. Review Supplier’s drawings for economic studies of equipment and piping systems.
Prepare project planning, plot development, and design models for client review. Interface with construction and all design engineering and engineering groups during development.
Assist to other piping design areas including modelling and isometric extraction for IFC.
Incorporating model review comments and Additional Design Requirements (ADR) to piping models.
Compare P&ID’s, line list and piping route models for integrity checks, squad checks, RDB conflicts, and updating PLSR.
Preparation, generation and checking of MTO of piping.
Provide manual MTO sketches of small bore piping (2” and below).
Checking of P&ID’s, line list, piping route models and MTO template to established consistent estimate of material to be used.
Checking other disciplines deliverable drawings (Structural, Civil, Electrical, and Mechanical) for possible design issue problems that will cause re-works during construction phase.
Coordination/Interface with other discipline including the other Fluor Daniel’s offices to resolved queries.
PROJECT INVOLVEMENT:
1) Project Name: Abu Dhabi Gas Industries Ltd. (GASCO)
Habshan 5 - GASCO IGD (FEED)
Date: May 2008 – July 17, 2009
Works Handled:
a) TGTU
Amine Sump Area (includes Amine Filter, Amine Pump, Amine U/G Vessel and Amine Mixing Drum)
Trim Cool Compressor Area (includes Amine Surge Drums, Compressor, Amine Propane Pump and Air-coolers)
b) Process Area 4 (Flare)
Flare and Blow down Hydrocarbon/Acid Gas system (includes Flare Hydrocarbon/Acid Gas K.O. Drums, Piping Header routing)
c) Interconnecting Pipe Rack
Process and Utility System
2) Project Name: Saudi Polyolefins Company (SPC)
Tasnee - SPC-PPx Expansion Project
Date: August 2007 – April 2008
Works Handled:
a) Flare Area
Flare system (includes Flare K.O. Drums, Flare header and Flare jacketed piping)
b) Utility Station for Flare Area
c) Additional scope of works (from PDH Plant to PP plant battery limit)
C) HITACHI, LTD. PHILIPPINES
Location : Ayala Avenue, Makati City Philippines
Position : Mechanical Engineer II
Duration : Jan. 16, 2004 – July 2007
Job Description:
Tracing piping assembly using piping layout.
Responsible for the design of detailed fabrication drawing (International and Domestic project) in 3D view using applicable codes like ASME/JIS.
Responsible for the design of detailed fabrication drawing for High Pressure piping like Main Steam piping, Cold Reheat piping and Feed water piping as per applicable codes like ASME/JIS.
Responsible for deciding material to be used, pipe thickness, UNC series of bolts and nuts to be used using applicable codes like ASME/JIS.
Making MTO using detailed fabrication drawings for bidding and construction purposes.
Checking of detailed fabrication drawings for small bore and large bore piping before submitting to Hitachi Japan.
Paper works including manual making and reports related to piping fabrication.
PROJECT INVOLVEMENT:
1. XTK - Krabi Thermal Power Plant, Thailand - 390 MW
2. KB2 - Kobe Thermal Power Plant, Coal Fired - 700 MW
3. XMA-4 - Mid – American Company, USA
4. XSK - Kwang Yang City, Korea (Combined Power Plant – 200MW)
5. KSR – Nihon Seishi / Kushiro Coal fired Power Plant – 88 MW
6. A-Project [HTC, Japan (Combined Power Plant - 92MW)]
7. IG – 2 [Isogo, Japan (Coal Fired Power Plant – 600MW)]
8. XEE – Cairo Egypt (Combines Cycle Power Plant – 600MW)
9. XWS – Walsum, Germany (Coal Fired – 750MW)
10. XKY – Yong Shung Power Plant, South Korea – 870 MWX2
C) ZEPHYR ENGINEERING
Location : Makati Cty Philippines
Position : Cadet Engineer (OJT)
Duration : Nov. 2001 – March 2002
Job Description:
Responsible for the design and surveying of the project sites for refrigeration and A/C units for the customer including duct works, cleaning of ducts, repair and services.
Responsible for estimating the project.
Responsible for making quotation for bidding purposes.
Lay-outing the proposed project using AutoCAD software.
Manage and supervise the project installation of the A/C system
|
Last Updated on 13-Mar-10
-- End of CV/Resume --
Full CV/Resume available to paid companies/recruiters as an attachment
|