| |
|
| Ref # |  | JS161096 |
| Year of birth |  | 1949 |
Permanent/Home Location/Address |
| City or Town |  | Park City |
| State |  | KS |
| Country |  | USA |
Current Location/Address |
| State |  | KS |
| Country |  | USA |
Languages |
| Primary Language |  | Fluency |
| English |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | USA |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Architect |  | 30+ |
| CAD/CAM Engineer |  | 20 |
| Facilities Co-ordinator |  | 30+ |
| Facilities Engineer |  | 30+ |
| Planning / Scheduling Engineer |  | 30+ |
| Industry |  | Years Experience |
| Manufacturing |  | 30+ |
| Aerospace and Aviation |  | 20 |
| Military and Defense |  | 10 |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | Business Admin | USA | 1981 |
Other Qualifications, Memberships, Certification
N/A |
Computer Skills and Software Used |
Isicad,Cadam,Catia,Intergraph design
|
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will travel domestically
Yes - I will relocate domestically
Yes - I will travel internationally
Yes - I will relocate internationally |  |
Availability |
| Earliest Start Date |  | Given 5 weeks notice |
Ideal Next Job |
To secure a position as a “CONTRACT / TEMPORARY” Facilities Project Engineer with a progressive organization, where my experience, training, and education may be utilized to its fullest.
|
Required Salary & Conditions |
| I will discuss salary with potential employer |
Employment History |
| Total Years of Work Experience: |  | 40 |
| Commenced Full Time Work: |  | 1972 |
| Name |  | Hawker Beechcraft |
| Job Title: |  | Facilities Project Engineer |
| Duration |  | From : 2004 To: 2009 |
Summary |
I have 37 years of documented success in varied facility positions in diverse industries. My extensive experience includes supervision of in-house and subcontract construction personnel. I possess excellent interpersonal skills.
|
Work Experience |
PROFESSIONAL EXPERIENCE
HAWKER BEECHCRAFT, Wichita, Kansas 2004-2009
Facilities Project Engineer
• Created complex office, lab and manufacturing layouts for construction and relocation.
• Oversaw the creation and development of the Security Department Upgrade.
• Oversaw the creation and development of all plant warehouse facilities.
• Created and assisted in the construction of a 600,000 Sq. Ft. Logistics Center
• Was responsible for all office rearrangements from planning to completion
• Developed CATIA Computer Design basics.
• Revised and updated master layouts.
HI TECH ASSOCIATES INC., Lakeland, Florida 2003-2004
Layout Engineer (Consultant to Lockheed Martin)
• Created complex office, lab and manufacturing layouts for construction and relocation.
• Oversaw the creation and development of the Atlas Program Area.
• Redeveloped INTERGRAPH Computer Design basics.
• Revised and updated master layouts.
RAYTHEON AIRCRAFT COMPANY, Wichita, Kansas 1995-2001
Facility Planner III
• Produced detailed office, lab, and manufacturing layouts throughout the complex and coordinated the development from start to completion with up to 10 to 50 subcontract personnel.
• Developed relocation coded layouts of the area and supervised a 5 to 15 subcontract move team.
• Developed CADAM Computer Design basics.
• Revised and updated master layouts.
BOEING COMPANY, Renton, Washington 1990-1995
Facilities Plant Planner
• Created office, lab, and manufacturing layouts, and supervised a 10 to 50 in-house or subcontract construction team throughout the modification phases.
• Generated relocation coded layouts, and guided a 5 to 15 in-house or subcontract move personnel through rearrangement.
• Performed minor estimate of the proposed task.
• Assisted in the development of the 20-man on and off-site utility shutdown Committee. I was also a member of the program.
• Developed ISICAD Computer Design basics.
• Revised and updated master layouts.
Michael J. Nickles Page Two
GENERAL DYNAMICS CORPORATION, Pomona, California 1982-1990
Project Engineer
• Produced office, lab, and manufacturing layouts. Led a group of approximately 10 design engineers in the development of the area to be modernized.
• Prepared the rearrangement plan of action and, led a 10 to 15 construction team during development.
• Revised and updated facility master layouts.
• Prepared detailed reports regarding available facility space.
• Successfully transferred a F16 fighter jet, via street access, from San Bernardino to Pomona, California, approximately 50 miles.
• Developed INTERGRAPH Computer Design basics.
• Revised and updated master layouts.
WASHINGTON PUBLIC POWER SUPPLY, Richland, Washington 1981-1982
Industrial Engineer
• Developed layouts depicting non-generating nuclear office, lab and manufacturing areas.
• Prepared design engineer directions for area development.
• Prepared the rearrangement plan of action and led up to a 10-man subcontract move team.
• Revised and updated facility master layouts. Prepared detailed reports regarding available facility space.
• Revised and updated master layouts.
AEROSPACE CORPORATION, El Segundo, California 1972-1981
Senior Space Utilization Planner
• Monitored Space utilization square footage figures for office, lab, and manufacturing areas.
• Supervised a relocation team of at least 20 people.
• Served as parking coordinator.
• Prepared detailed reports as to space occupancy.
• Revised and updated master layouts.
EDUCATION
El Camino Junior College, Torrance, California
Business Management, 1981
MILITARY
U. S. Army, Specialist 4th Class, 1969-1972
Supervised Company Mail Distribution
Vietnam Vet
PROFESSIONAL TRAINING
• Graduated from Dale Carnegie Training; Selected as Student of the Night twice in 12 nights, 1992.
• Attended advanced courses in Manufacturing Layout, 1987.
• Attended Space Utilization seminars, 1977.
|
Comments/ Hobbies/ Interests etc: |
| I enjoy reading books, classic movies, Baseball, and Horse Racing |
Last Updated on 20-Nov-11
|