| |
|
| Ref # |  | JS159732 |
| Year of birth |  | 1975 |
Permanent/Home Location/Address |
| City or Town |  | #172 purok 2 brgy. 37 bitano,legazpi city |
| Country |  | PHILIPPINES |
Current Location/Address |
| Country |  | PHILIPPINES |
Languages |
| Primary Language |  | Fluency |
| English |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | PHILIPPINES |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Architect |  | 10 |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | bs architecture | bicol university,philippines | 1999 |
Other Qualifications, Memberships, Certification
uap member: united architects of the philippines members.
iapoa member: integrated & accredited professional organization for architects. |
Computer Skills and Software Used |
| 3d max 6 & 9,autocad 2007 & 2009,photoshop,corel draw,ms word,ms excel. |
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will relocate domestically
Yes - I will travel internationally
Yes - I will relocate internationally |  |
Availability |
| Start Immediately? |  | Available Now |
Ideal Next Job |
| Im looking for work that suited my qualification as draftsman/autocad operator & architect on an open to all offers. |
Required Salary & Conditions |
| My Minimum salary expected USD 2,000-8,000 PER MONTH plus paid food & housing. |
Employment History |
| Total Years of Work Experience: |  | 18 |
| Commenced Full Time Work: |  | 1994 |
| Job Title: |  | Draftsman |
Summary |
PROFILE: I was sponsored by BEMO PROJECT ENGINEERING based in Dubai, UAE last
January 5, 2009. I was given a working visa for 3 years and given a Residence Permit under No. 23622236. The company was affected by economic downturn and I was among those retrenched last March 16, 2009.
As a registered Architect and had varied skills and work experience. The present financial crisis should not hinder me from looking for job opportunities abroad.
My skills and expertise are not limited to design, drafting, AutoCAD identified with my profession but had work exposure on non-architectural job liked quantity evaluator & surveyor, data encoder, and other office job.
OBJECTIVE: To pursue looking for job opportunities and maximize utilization of my skills with end purpose of widening my horizon, perspective and contribute to the attainment of my employer’s business goals.
|
Work Experience |
WORK EXPERIENCE:
COMPANY POSITION PERIOD COVERED NATURE JOB & PROJECTS HANDLED
BEMO PROJECT ENGINEERING
DUBAI, UAE DRAFTSMAN/ JAN. 2009 - ROOF CLADDING
ARCHITECT MAR. 2009 WALL CLADDING
DYNAMICZ CONSTRUCTION ARCHITECT/ APR. 2008 – See Attachment
CORPORATION DESIGNER/ AUG. 2008 “A” for details.
MAKATI CITY, PHILIPPINES CAD OPERATOR
MECHAFIELD CONSTRUCTION & ESTIMATOR/ OCT. 2007 - See Attachment
DEVELOPMENT CORPORATION CAD OPERATOR APRIL 2008 “A” for details.
BESTCON CONSTRUCTION & PROJ. ARCHITECT SEPT. 2006 - See Attachment
PLUMBING SERVICES, CO. & SUPERVISOR JUNE 2007 “A” for details.
PASIG CITY, PHILIPPINES
ASZTECH METAL INDUSTRIES ASST. SUPERVISOR/ OCT. 2004- See Attachment
INCORPORATED MECH. DRAFTSMAN JUNE 2006 “A” for details.
SELF-EMPLOYED as DESIGNER SEPT. 2003- See Attachment
ARCHITECT SEPT. 2004 “A” for details.
MEGA SYSTEM ENTERPRISES TECHNICAL JUNE 2000- See Attachment
STA. MESA, MANILA, PHILIPPINES ENGINEER SEPT. 2003 “A” for details.
EQUITABLE PCIBANK DATA ENCODER DEC. 1999- Not applicable
MAKATI CITY, PHILIPPINES MAY 2000
DOMINGO GAMBA DRAFTSMAN MARCH 1996- See Attachment
& ASSOCIATES MAY 1999 “A” for details.
DEPW – CITY ENGINEERING DRAFTSMAN NOV. 1993- See Attachment
LEGAZPI CITY, PHILIPPINES JAN. 1994 “A” for details.
Emmanuel M. Nocido Jr, Curriculum Vitae
Attachment “A”
Company/ Name of Project Handled Location
1. BEMO PROJECT ENGINEERING/ DUBAI,UAE
a.) GORGAN SPORTS STADIUM, Iran
The construction is ongoing, The company scope of work was
Purely on Roof cladding.
Responsibilities:
I was the architect/designer, draftsman and the estimator of the Bill of Material who are going to use at the site.
b.) CENTRAL KITCHEN, Kuwait
The construction is ongoing, The company scope of work was
Purely on Wall cladding.
Responsibilities:
I was the architect/designer, draftsman and the estimator of the Bill of Material who are going to use at the site.
c.) ADNEC LINK BRIDGE, Abhu dabi, UAE
The construction is ongoing, The company scope of work was
Purely on Roof cladding.
Responsibilities:
I was the architect/designer, draftsman and the estimator of the Bill of Material who are going to use at the site.
2. DYNAMICZ CONSTRUCTION CORPORATION
# 3438 Bliss Village, Guadalupe, Makati City, Philippines.
a.) HEAVEN’S MEMORIAL PARK, PAMPANGA, PHILIPPINES
( DESIGN & BUILD PROJECT – 40 hectare land ).
The project cost: Php. 80million, the construction is ongoing, it was started last July 2008, and the estimated time frame of the project to be completed is 2010. It was projected to be opened for the public by November 01 the same date for the completion of the project.
Responsibilities:
I was the architect/designer of the project, all of the design was conceptualized by me. I participated in the project cost estimate & have given the specifications to what materials to used in the project.
Emmanuel M. Nocido Jr, Curriculum Vitae
b.) JAS TOWER, BINONDO, MANILA, PHILIPPINES
( FIRE PROTECTION & SANITARY INSTALLATION – 18storey bldg.)
The project cost: Php. 16million, the construction is ongoing, it was started last June 2008, and the deadline (completion date) of the project was early as February 2009.
Responsibilities:
I was the estimator for the project & the construction is ongoing, it was started last June 2008, and the deadline (completion date) of the project was early as February 2009.
c.) WORLD CITI COLLEGE, CALOOCAN CITY, PHILIPPINES
(Design of Laboratory, Dormitory & Fast-food chain)
The project cost: Php. 7million, the construction is ongoing, it was started last July 2008, and the deadline (completion date) of the project was early as May 2009.
Responsibilities:
I was the architect/designer of the project, all of the design was conceptualized by me. I took part in the planning and cost estimate of the
whole project & have given the specifications as to what materials to be
used in the project.
Other responsibilities:
I am the operation Manager of the company. My job is to supervise & check the operation of the company, attend meetings with the clients, inspection the status of the project together with the financial & profitability of the project.
3.) MECHAFIELD CONSTRUCTION & DEVELOPMENT CORPORATION
#119 Simoun St. Sto. Domingo, Quezon City
a.) Zen tower, Lawton, Manila, Philippines
(45-storey Condominium Bldg.)
(Fire Protection, Plumbing & Sanitary)
The project cost for the installation of fire protection, plumbing & sanitary is placed at Php. 30million, the project was started last August 2007 and the construction is completed last February 2008.
Responsibilities:
I was the estimator for the revision given by the designer & the cad operator for the “as-built” plan for the project and also the inspector regarding to the quality of workmanship of the installation of the installer.
Emmanuel M. Nocido Jr, Curriculum Vitae
b.) McKinley Civic Center (16-storey Office Bldg.)
Fort Bonifacio Global City, Taguig, Philippines
(Fire Protection, Plumbing & Sanitary)
The McKinley Civic Center, a 16-storey building for I.T. Center that was erected inside the perimeter of Fort Bonifacio Global City, Taguig, Philippines.
The project cost for the installation of fire protection, plumbing & sanitary is placed at Php. 22million, the project is ongoing, it was started last March 2008, and the projected target date/deadline of the installation of the fire protection, plumbing & sanitary is October 2008.
Responsibilities:
I was the estimator for the project & the cad operator for the
“as-built” plan of the building and tasked to inspect every end of the week to check the installation if it complies with the right installation.
c.) Forbeswood Parklane (38-storey Condominium Bldg.)
Fort Bonifacio Global City, Taguig, Philippines
(Plumbing, Sanitary & Fire Protection)
The project cost for the installation of plumbing, sanitary & fire protection is placed at Php. 26million, the project is ongoing, it was started last January 2008, and it is projected to be completed this year December 2008, the status of the project is 65% complete.
Responsibilities:
I was the quality control engineer & estimator for the said project & also tasked to encode the “as-built” plan.
d.) Rada Regency (28-storey Condominium bldg.)
Rada St., Legazpi Village, Makati City, Philippines
(Fire Protection, Plumbing & Sanitary)
Rada Regency, a 28-storey condominium building that was erected in City of Makati business district. It houses tourists, visitors, businessmen, and other foreign delegates that visited the Philippines every year. The project cost for the installation of fire protection, plumbing & sanitary is placed at Php. 23million, and the project was completed last April 2008. It was started last December 2007.The project was purely the installation of fire protection, plumbing & sanitary.
Responsibilities:
I am the quality control engineer, the estimator of the project and the cad operator for the ”as-built” plan of the building.
Emmanuel M. Nocido Jr, Curriculum Vitae
e.) Eastwood Parkview Hotel & Residence (45-storey Hotel & Residence Bldg.) Eastwood City, Libis, Quezon City, Philippines
(Fire Protection, Plumbing & Sanitary)
The Eastwood Parkview, It is a building combined with Hotel & residence that was erected in the busy City of Eastwood, located in Libis, Quezon City. The project cost for the installation of the fire protection, plumbing & sanitary is placed at Php. 28million, the construction started last January 2008, and it is estimated to be completed this December 2008. It was a mixed use project that attached to different buildings a shopping mall down and a parking lot attached to the building perimeter.
Responsibilities:
I am the quality control engineer, the estimator of the project and the cad operator for the as-built plan of the building.
f.) Manila Regency (45-storey Condominium Bldg.)
Bocobo St., Malate, Manila, Philippines
(Fire Protection)
The project for Manila Regency, It is a condominium building that was constructed beyond the heart of Manila, the capital of the Philippines, the project cost for the installation for the fire protection is placed at 24millionphp, the construction was completed last April 2008. Construction was started last July 2007.
Responsibilities:
I am the quality control engineer, the estimator of the project and the cad operator for the as-built plan of the building.
g.) Eastwood mall w/ 4-45-storey condo. & hotel bldg.
Eastwood City, Libis, Quezon City, Philippines.
(HVAC, Fire Protection, Plumbing & Sanitary).
Eastwood mall, it is a project that mixed with 4-45 storey building, it is constructed beyond the perimeter of Eastwood City, located in Libis, Quezon City, Philippines. The project cost for the installation of HVAC, Fire protection, plumbing & sanitary is placed at Php. 65million, the installation was started last August 2007 for HVAC, Fire protection, plumbing & sanitary, and the target date for completion is December 2008.
Responsibilities:
I am the quality control engineer, the estimator of the project and the cad operator for the as-built plan of the building.
Emmanuel M. Nocido Jr, Curriculum Vitae
Other responsibilities:
I am also tasked to attend pre-bid conference for some projects and answers inquiry and estimation as designated by my boss. If he is out of the country I represent him in the negotiation meeting down to the implementation of the project regarding to the papers,(NTP-notice to proceed).
4.) BESTCON CONSTRUCTION & PLUMBING SERVICES CO.
# 902 Kamagong St., Napico, Manggahan, Pasig City, Philippines
a.) Two-storey Residence
(Plumbing & Sanitary works)
Greenwoods Subdivision, Carmona, Cavite, Philippines
Two-storey residence that was erected inside the perimeter of Greenwoods Subdivision located in Carmona, Cavite, Philippines. The project cost for the installation of plumbing & sanitary works is placed at Php. 350,000.00. The installation was started last November 2006, completed last March 2007.
Responsibilities:
I am the quality control engineer, estimator of material & labor & supervise the installation down to the testing and turn-over to the owner.
b.) CT Group Office
(Design plumbing & sanitary layout)
McKinley Hills, Fort Bonifacio Global City,
Taguig, Philippines
CT Group, an architectural firm that office inside the perimeter of Fort Bonifacio Global City, Taguig, Philippines. The project cost for the installation & design of sanitary & plumbing layout is placed at Php. 265,000.00. The installation was completed last February 2007, and started last December 2006.
Responsibilities:
I was the designer & estimator of the material and labor; also I was the project engineer supervising the installation.
c.) Two-storey Residence
(Plumbing & Sanitary works)
Bauan St., Ayala Alabang Village,
Muntinlupa City, Philippines
A two-storey residence building with basement erected inside the prestigious subdivision in Alabang, Muntinlupa, Philippines. One of the high end subdivisions in the metropolis. The project cost for the installation of plumbing & sanitary works is placed at Php. 435,000.00. The project was completed last March 2007, and started last October 2006.
Emmanuel M. Nocido Jr, Curriculum Vitae
Responsibilities:
I am the quality control engineer, estimator of material & labor & supervise the installation down to the testing and turn-over to the owner.
Other responsibilities:
I am in charge/designated to represent the company
for project meeting with the client negotiating the contract price, discussing what to do with the client & project engineer on how to start the project and the manner of payments.
5.) ASST. SUPERVISOR / MECHANICAL DRAFTSMAN
ASZTECH METAL INDUSTRIES INCORPORATED,
#01 Pasco Drive, Broadway Pines Executive Village,
Mayamot, Antipolo City, Philippines
a.) Universal Robina Corporation (all Plant all – over the Phils.)
The company that own by the Gokongwye, the company was engaged in manufacturing candy, confectionaries, biscuit, etc. The entire defective machine that manufactured candy and other products was bidded & got the contract by my boss to repair and maintain the life of it. All machines for rehabilitation was brought to the shop for repair and replacement of defective parts.
Responsibilities:
Estimating the cost of material for such machine to be manufactured or repaired. Checking the quality & supervising the sequence of the work to be done by the worker according to the plan- drawing. I am also the mechanical draftsman doing the shop drawing for such machine to be manufactured or repaired.
b.) Storks Phils. Cabuyao, Laguna, Philippines
The company own by the Rebisco biscuit corp. that was manage & run by Ng’s family, the company operates for almost 25years doing the chocolate candy chubby, & stork menthol candy. The company of my boss was awarded to maintain the entire machine running to operate the plant. There are 5 lines operating machine that manufactured chocolate candy.
Emmanuel M. Nocido Jr, Curriculum Vitae
Responsibilities:
If there is a problem that occurs during the operation, one of the maintaince engineer try to inform our office and I together with my people went to the site and check the problem, If there is a replacement of parts I will check it and bring it to our office for repair. I am also engaged in cad encoding the shop drawing for such parts to be replaced in work; also I am the purchaser, estimator for such parts to be done.
c.) Marantz Marketing, Santolan , Pasig City, Philippines
The sister company of Stork Phils. That was subsidiary by the Ng’s family. The company was engaged in business of manufacturing menthol, & bubble Gum candy, it has 2 lines of operating machine that manufactured bubble gum & menthol Candy. The company of my boss was task to maintained the two operating machine.
Responsibilities:
If there is a problem occur during the operation, one of the maintaince engineer try to inform our office and I together with my people went to the site and check the problem, If there is a replacement of parts I will check it and bring it to our office for repair. I am also engaged in cad encoding the shop drawing for such parts to be replaced in work; also I am the purchaser, estimator for such parts to be done.
d.) Columbia Candy Factory, Navotas, Metro Manila, Philippines
The company that manufactured jelly ace, V-fresh, etc. own by Mr. Go. The company operates for almost 23years in making quality candy in the market. The company own a 3 lines of operating machine that manufactured candy, that maintained by the company of my boss.
Responsibilities:
If there is a problem occur during the operation, one of the maintaince engineer try to inform our office and I together with my people went to the site and check the problem, If there is a replacement of parts I will check it and bring it to our office for repair. I am also engaged in cad encoding the shop drawing for such parts to be replaced in work; also I am the purchaser, estimator for such parts to be done.
e.) Monde Nissin Factory, Sta. Rosa, Laguna, Philippines
The makers of Lucky me Noodles & Nissin chocolate Wafer biscuit. This company owns 5 lines of operating machine that makes noodles and biscuit product. My boss is the one who design the setup of the machine down to the maintenance of those.
Emmanuel M. Nocido Jr, Curriculum Vitae
Responsibilities:
The company task to maintain those machines during operation, if there is a problem occurs the company of my boss was task to check the problem together with the maintenance engineer of Nissin Company. My task is to check what part are going to replace and get the information, the size & what kind of material are going to use in fabricating those parts, also cad encoding for shop drawing that to be done by the worker.
Other responsibilities:
- Supervising the sequence of works to be done by the worker according to the working drawing.
- Responsible for the progress of work and time-tables daily.
- Checking the finished product, if it will pass the quality control of the company and ready for the test run before turn-over to the customer.
- Reporting the progress of work daily to the operation manager.
6.) Freelance ARCHITECT
Brgy. 37, Los Baños Subd., Bitano,
Legazpi City, Philippines
a.) 16-units 4-storey commercial & residential Bldg.
(Design Project)
Sol Subd., Bitano, Legazpi City, Philippines
A 16-units 4-storey commercial. & residential building erected beyond the heart of the City of Legazpi, where the beautiful and majestic Mayon Volcano was located, one of the Seven Wonders of the World. The Project cost is placed at Php. 40million; the construction was completed last October 2004, and started last December 2003.
Responsibilities:
I am the Architect/designer of the project, I do site visit during the construction of the project to see, if the construction follow the plans and if there is any revision on the project.
b.) 2-storey residence Bldg.
(Design Project)
Washington Drive, Legazpi City, Philippines
A two-storey residence located in Washington Drive, Legazpi City. The project cost is placed at Php. 2.3million. The construction of the project was completed last February 2004, and it was started last October 2003.
Emmanuel M. Nocido Jr, Curriculum Vitae
Responsibilities:
I am the Architect/Designer of the project, I do periodic visit during the construction of the project to check, if it is following the construction plans and if there is any revision on the project.
c.) 2-storey residence Bldg.
(Design Project)
Central City Subd., Tahao Rd., Legazpi City, Philippines
A two-storey residence located in Central City Subd. Tahao Rd., Legazpi City. The project cost is placed at Php. 2.3million. The construction of the project was completed last March 2004, and it was started last October 2003.
Responsibilities:
I am the Architect/Designer of the project, I do periodic visit during the construction of the project to check, if it is following the construction plans and if there is any revision on the project.
Other responsibilities:
- Drafting the whole sets of plans through AutoCAD.
- Estimating the cost of labor and materials.
- Supervising the project from time to time.
- Planning the design of the project according to the client owned taste.
- Setting up what kind of material who is going to use to build the project.
7.) TECHNICAL ENGINEER
MEGA SYSTEM ENTERPRISES
#501 Silencio St., Sta. Mesa, Manila, Philippines
a.) SM CITY Dasma, Dasmariñas, Cavite,Philippines
A multi-million project erected beyond the vicinity of Dasmariñas, Cavite,Philippines. The project cost for the installation of waterline is placed at Php. 12million, the installation was completed last January 2002,and was started last July 2001.
Responsibilities:
I am the quality control engineer, checking the installation of the worker, if he were following the right procedure of the installation.
Emmanuel M. Nocido Jr, Curriculum Vitae
b.) SM CITY Baguio, Baguio City, Philippines
Also a multi-million project erected beyond the heart of the City of Baguio, the summer Capital of the Philippines. The project cost for the installation of waterline is placed at Php. 18million, the installation was completed last March 2003, and started last September 2002.
Responsibilities:
I am the quality control engineer, checking the installation of the worker, if he were following the right procedure of the installation.
c.) Caltex Gas Station, Caa Road, Sucat, Parañaque City, Philippines
Caltex gas station project was also one of the project of the company of my boss, he was engaged in this business for almost a year. The project cost for the installation of waterline is placed at Php. 5 million. The construction was completed last March 2003, and started last December 2002.
Responsibilities:
I am the quality control engineer, checking the installation of the worker, if he were following the right procedure of the installation.
d.) Caltex Gas Station,Veramoll,Greenhills,San Juan City, Philippines
Caltex gas station project was also one of the project of the company of my boss, he was engaged in this business for almost a year. The project cost for the installation of waterline is placed at Php. 5 million. The construction was completed last March 2002, and started last December 2001.
Responsibilities:
I am the quality control engineer, checking the installation of the worker, if he were following the right procedure of the installation.
e.) Swire Tower (45-storey Office & residence Bldg.)
Annapolis St., Greenhills, San Juan City, Philippines
A 45-storey office & residence building erected beyond the city of San Juan, Philippines. The project cost for the installation of waterline is placed at 10million, the project was completed last March 2002, and started last April 2001.
Responsibilities:
I am the quality control engineer, checking the installation of the worker, if he were following the right procedure of the installation.
Emmanuel M. Nocido Jr, Curriculum Vitae
f.) Dencio’s Grill, Olivares, Tagaytay City, Philippines
A one-storey restaurant building erected beyond the City of Tagaytay.
The project cost for the installation of waterline is placed at Php. 1.8million, the project was completed last August 2003, and started last May 2003.
Responsibilities:
I am the quality control engineer, checking the installation of the worker, if he were following the right procedure of the installation.
g.) Hyatt Regency Hotel & Casino Manila
Pedro Gil St., Malate, Manila, Philippines
A 38-storey hotel & casino building erected beyond the City of Manila, along Roxas Boulevard seeing the bay of Manila. The project cost for the installation of hot & cold waterline is placed at Php. 10million, the construction was completed last March 2002, and started last April 2001.
Responsibilities:
I am the quality control engineer, checking the installation of the worker, if he were following the right procedure of the installation.
Other responsibilities:
- Estimating the plumbing plans of high-rise, low-rise, shopping mall, commercial building and residential.
- Checking the installation of the plumbing layout if they are following the right procedure of the installation.
- Attending pressure test and checking if they were problems occur during testing, recommending what will going to do.
- Supervising the installation of works and layout.
8.) DATA ENCODER
EQUITABLE PCIBANK AUTOMATION CENTER
4TH Flr. Equitable PCIBANK Building, Tower 2, Makati Ave.,
Corner H.V. De la Costa St., Makati City, Philippines
Responsibilities:
- Encoding Bank transaction, enter bank transaction, payroll from branches as well as the main office.
- Distributing the reports from all over the nearby branches in the metropolis.
- Assisting bank representative to check the report they are going to pick-up.
Emmanuel M. Nocido Jr, Curriculum Vitae
9.) ARCHITECTURAL DRAFTSMAN
DOMINGO GAMBA AND ASSOCIATES
Central City Subd, Tahao Rd., Legazpi City, Philippines
a.) Hospital For Disabled, Bogtong, Legazpi City, Philippines
A medical hospital for disabled erected in the City of Legazpi, where the majestic Mayon Volcano was located. The project cost reached 10million, the construction was completed last March 1998, and started last January 1997.
Responsibilities:
I was tasked to draft the architectural plans thru AutoCAD, estimating the cost of the labor and materials. Checking the project from time to time.
b.) Imperial Homes Subd., Guinobatan, Albay, Philippines
A low cost subdivision that was erected in Municipality of Guinobatan province of Albay. The project cost reached 12million, the construction was completed last April1998, and started last February 1997.
Responsibilities:
I was task to draft the architectural plans thru AutoCAD, estimating the cost of the labor and materials. Checking the project from time to time.
Emmanuel M. Nocido Jr, Curriculum Vitae
10.) DEPW- CITY ENGINEER`S OFFICE
City Hall Compound, Legazpi City, Philippines
a.) Legazpi City Street Lighting Project, Legazpi City, Philippines
A project of the city government of Legazpi province of Albay. The project was funded by the local government, the cost reached Php. 11million, the construction was completed last May 1994, and started last December 1993.
Responsibilities:
I was tasked to draft the architectural plans thru AutoCAD, estimating the cost of the labor and materials. Checking the project from time to time.
b.) Enhancement of Public Sidewalks, Drainage Canal, &
Public Waiting Shed, Legazpi City, Philippines
A project of the city government of Legazpi province of Albay. The project was funded by the local government, the cost reached Php. 15million, the construction was completed last May 1994, and started last December 1993.
Responsibilities:
I was tasked to draft the architectural plans thru AutoCAD, estimating the cost of the labor and materials. Checking the project from time to time.
c.) Renovation of City Hall Building & adjacent Bldg.,
Legazpi City, Philippines
A project of the city government of Legazpi province of Albay. The project was funded by the local government, the cost totalled Php. 15million, the construction was completed last May 1995, and started last December 1993.
Responsibilities:
I was tasked to draft the architectural plans thru AutoCAD, estimating the cost of the labor and materials. Checking the project from time to time.
|
Comments/ Hobbies/ Interests etc: |
playing basketball,table tennis,billiard,biking,reading romantic books,fiction etc.
im very interested in doing painting,acrylic painting,oil on canvas painting,mural painting etc. which is very challenging and catch the mind of the people who can see. |
Last Updated on 06-Jan-11
|