| |
|
| Ref # |  | JS156478 |
| Year of birth |  | 1958 |
Permanent/Home Location/Address |
| City or Town |  | NAGPUR |
| State |  | 440013 |
| Country |  | INDIA |
Current Location/Address |
| State |  | 90151, |
| Country |  | LIBYA |
Languages |
| Primary Language |  | Fluency |
| English |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | INDIA |
| Other Nationality |  | INDIA |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Maintenance Supervisor |  | 3 |
| Mechanical/Piping Supervisor |  | 5 |
| Piping Supervisor |  | 12 |
| Area Supervisor |  | 3 |
| Procurement and Logistics Officer/engineer |  | 4 |
| Industry |  | Years Experience |
| Pipelines |  | 3 |
| Steel |  | 5 |
| Water |  | 12 |
| Building and Construction |  | 3 |
| Oil and Gas |  | 4 |
Qualifications |
| Highest Qualifications |  | HND/Diploma |
| Qualification | Subject | Establishment/Country | Year |
| HND/Diploma | Mechanical | NAGPUR, MAHARASHTRA, INDIA. | 1979 |
Other Qualifications, Memberships, Certification
EDUCATION Central Training Institute. (Technical Education Society), MAHARASHTRA STATE, SADAR, NAGPUR. INDIA.
DIPLOMA IN MECHANICAL ENGINEERING.
LANGUAGES LANGUAGE SPEAKING: ENGLISH - GOOD, HIND I- GOOD, ARABIC -GOOD.
LANGUAGE READING: ENGLISH - GOOD, HINDI - GOOD, ARABIC - FAIR.
LANGUAGE WRITING: ENGLISH - GOOD, HIND I- GOOD, ARABIC - POOR.
GEOGRAPHICAL EXPERIENCE
TOTAL 28 YEARS & CONTINU.
KEY QUALIFICATIONS
I have more than 28 years of general experience and at least 25 years experience within contact/project management of which 25 years are international experience and 3 years in India.
I started my carrier from Power Industries as an Erection and Supervision of structure/Ducting and Heavy Fan erection of 210 MW Boiler (with ID Fans/FD Fans.). Perfect erection in time with Insulation of the smoke Ducting, Painting of Columns respectively. Inspected and Hand over the Project to the client.
Worked as utility Supervisor for Steel Industries (Misurata steel plant- North Africa. Responsible for erection & commissioning of Steel plant total Utilities (Direct/Indirect cooling water system, Fire water System, PW System (Drinking water) Rain water System, & Black water System. Work progress report of the Erection of Piping, As built Drawings, Site Inspections with Clint, as well as handing over the project to the Clint.
Worked with Clint as operation & Maintenance in charge for total water utilities. Involve in training program for Local people, Group wise in each six months interval for all Heavy duty Rain water Pump Houses as well as Black water Pump Houses.
Worked as an Administration & Site in charge in Cement Industries Zliten Cement Plant for Rehabilitation work for total Utilities ( Installation of Fire water System, PW System, Rain & Black water System, Water Desalination System, Compressor units etc.( Rehabilitation Project.) Contract documentation and site supervision of major drainage system.
Site in charge TV Centre -Tripoli Rehabilitation Project of internal Piping. Installation of Fire water System, PW System, Rain & Black Water System, Water Desalination Unit etc.
Now working as Engineer Procurement in Etos Oil & Gas company for Purchase Foreign/Local goods for different Oil & Gas Companies all over the Libyan Oil Companies. I am still working for Oil & Gas for various duties related to the procurement of material, equipment, spare parts and services. Includes Researches supplies, vendors and services contractor locally and overseas to identify potential sources for required material, product and services. Negotiates price, deliveries and condition. Participates in evaluating tenders and quotations. Follows up on the time delivery of porches items.
CAREER HIGHLIGHTS
EXPERIENCE SUMMARY
Date from -Date to
Company
Location
Position
Project Name
Project Description
Responsibilities/Tasks
PROJECT NAME
Feb.2008 till Nov.2009 & continue
Etos Engineering Services for Oil & Gas Industries.
Site Tripoli-Libya
Engineer Procurement. Etos Engineering services for Oil & Gas Industries.
Now working as Engineer Procurement in Etos Oil & Gas company for Purchase Foreign/Local goods for different Oil & Gas Companies all over the Libyan Oil Companies. I am still working for Oil & Gas for various duties related to the procurement of material, equipment, spare parts and services. Includes Researches supplies, vendors and services contractor locally and overseas to identify potential sources for required material, product and services. Negotiates price, deliveries and condition. Participates in evaluating tenders and quotations. Follows up on the time delivery of porches items.
PROJECT NAME
Jan. 2005-Dec. 2007
Karolak GmbH Germany.
Site Tripoli- Libya
Site In charge.
TV Center Rehabilitation of internal water system (Utilities)
Project Description: TV Centre -Tripoli Rehabilitation Project of internal Piping. Installation of Fire water System, PW System, Rain & Black Water System, Water Desalination Unit etc. modified all most 50% Rain water system as well as Black water system.
Responsibilities/Tasks: Worked as a Site in charge of the project Administration and site arrangement. Work distribution, work progress, Man power control etc.
Jan. 2002-Dec. 2004
HK International Malta.
Site Zliten-Libya.
Administration & Site In charge.
Zliten Cement Plant rehabilitation Project Total water system(Utilities) as well as Smoke chimney 45 meter high with 8 meter diameter.
Administration & Site in charge in Cement Industries Zliten Cement Plant for Rehabilitation work for total Utilities ( Installation of Fire water System, PW System, Rain & Black water System, Water Desalination System, Compressor units etc.( Rehabilitation Project.) Contract documentation and site supervision of major drainage system.
Responsibilities/Tasks: Worked as a Adm./Site in charge of the project Administration and site arrangement. Work distribution, work progress, Material Procurement, Man power control etc.
August 1988-Dec.2001
Lisco Misurata Libya.
(Iron & steel industries)
Operation& Maintenance In charge.
Lisco (Libyan iron & steel Industries Misurata Libya.)
Operation & Maintenance in charge for total water utilities. Involve in training program for Local people, Group wise in each six months interval for all Heavy duty Rain water Pump Houses as well as Black water Pump Houses.
Responsibilities/Tasks: Maintenance planning, New pipe laying, modification of water system, Drawing reading, Fabrication of big diameter pipe Elbow and Tees fabrication, Maintenance of heat exchanger for Central water station etc.( All under training program)
July 1984 - July 1088
Mannesmann A.G. GmbH- Germany.
Utility erection Supervisor.
Non Technical Skill: Libian Iron & Steel Project.
Supervisor for Steel Industries (Misurata steel plant- North Africa. Responsible for erection & commissioning of Steel plant total Utilities (Direct/Indirect cooling water system, Fire water System, PW System (Drinking water) Rain water System, & Black water System. Work progress report of the Erection of Piping, As built Drawings, Site Inspections with Clint, as well as handing over the project to the Clint.
Responsibilities/Tasks: Work progress report of the Erection of Piping, As built Drawings, Site Inspections with Clint, as well as handing over project to the Clint.
Fluent in English & Arabic. Confident Team building, Negotiation, Hard working, and strong analytical skill.
Computer Skill: Application and software, Microsoft office, Auto Cad.
EMPLOYERS.
BABCOCK INDIA LTD. INDIA.
MANNESMANN A.G. GMBH. GERMANY.
LISCO. (LIBYAN IRON & STEEL COMPANY-LIBYA.)
HK INTERNATIONAL MALTA.
KAROLAK GMBH GERMANY.
ETOS ENGINEERING SERVICES FOR OIL & GAS INDUSTRIES.
LIBYA.
|
Computer Skills and Software Used |
| Application and Software, Microsoft office, Auto Cad. |
Work Locations |
| Are you willing to move or relocate? | Countries NOT Willing To Work In! |
| Yes - I will travel internationally | - North America
CENTRAL AFRICAN REPUBLIC
|
Availability |
| Start Immediately? |  | Available Now |
| Earliest Start Date |  | Given 4 weeks notice |
Ideal Next Job |
EDUCATION Central Training Institute. (Technical Education Society), MAHARASHTRA STATE, SADAR, NAGPUR. INDIA.
DIPLOMA IN MECHANICAL ENGINEERING.
LANGUAGES LANGUAGE SPEAKING: ENGLISH - GOOD, HIND I- GOOD, ARABIC -GOOD.
LANGUAGE READING: ENGLISH - GOOD, HINDI - GOOD, ARABIC - FAIR.
LANGUAGE WRITING: ENGLISH - GOOD, HIND I- GOOD, ARABIC - POOR.
GEOGRAPHICAL EXPERIENCE
TOTAL 28 YEARS & CONTINU.
KEY QUALIFICATIONS
I have more than 28 years of general experience and at least 25 years experience within contact/project management of which 25 years are international experience and 3 years in India.
I started my carrier from Power Industries as an Erection and Supervision of structure/Ducting and Heavy Fan erection of 210 MW Boiler (with ID Fans/FD Fans.). Perfect erection in time with Insulation of the smoke Ducting, Painting of Columns respectively. Inspected and Hand over the Project to the client.
Worked as utility Supervisor for Steel Industries (Misurata steel plant- North Africa. Responsible for erection & commissioning of Steel plant total Utilities (Direct/Indirect cooling water system, Fire water System, PW System (Drinking water) Rain water System, & Black water System. Work progress report of the Erection of Piping, As built Drawings, Site Inspections with Clint, as well as handing over the project to the Clint.
Worked with Clint as operation & Maintenance in charge for total water utilities. Involve in training program for Local people, Group wise in each six months interval for all Heavy duty Rain water Pump Houses as well as Black water Pump Houses.
Worked as an Administration & Site in charge in Cement Industries Zliten Cement Plant for Rehabilitation work for total Utilities ( Installation of Fire water System, PW System, Rain & Black water System, Water Desalination System, Compressor units etc.( Rehabilitation Project.) Contract documentation and site supervision of major drainage system.
Site in charge TV Centre -Tripoli Rehabilitation Project of internal Piping. Installation of Fire water System, PW System, Rain & Black Water System, Water Desalination Unit etc.
Now working as Engineer Procurement in Etos Oil & Gas company for Purchase Foreign/Local goods for different Oil & Gas Companies all over the Libyan Oil Companies. I am still working for Oil & Gas for various duties related to the procurement of material, equipment, spare parts and services. Includes Researches supplies, vendors and services contractor locally and overseas to identify potential sources for required material, product and services. Negotiates price, deliveries and condition. Participates in evaluating tenders and quotations. Follows up on the time delivery of porches items.
CAREER HIGHLIGHTS
EXPERIENCE SUMMARY
Date from -Date to
Company
Location
Position
Project Name
Project Description
Responsibilities/Tasks
PROJECT NAME
Feb.2008 till Nov.2009 & continue
Etos Engineering Services for Oil & Gas Industries.
Site Tripoli-Libya
Engineer Procurement. Etos Engineering services for Oil & Gas Industries.
Now working as Engineer Procurement in Etos Oil & Gas company for Purchase Foreign/Local goods for different Oil & Gas Companies all over the Libyan Oil Companies. I am still working for Oil & Gas for various duties related to the procurement of material, equipment, spare parts and services. Includes Researches supplies, vendors and services contractor locally and overseas to identify potential sources for required material, product and services. Negotiates price, deliveries and condition. Participates in evaluating tenders and quotations. Follows up on the time delivery of porches items.
PROJECT NAME
Jan. 2005-Dec. 2007
Karolak GmbH Germany.
Site Tripoli- Libya
Site In charge.
TV Center Rehabilitation of internal water system (Utilities)
Project Description: TV Centre -Tripoli Rehabilitation Project of internal Piping. Installation of Fire water System, PW System, Rain & Black Water System, Water Desalination Unit etc. modified all most 50% Rain water system as well as Black water system.
Responsibilities/Tasks: Worked as a Site in charge of the project Administration and site arrangement. Work distribution, work progress, Man power control etc.
Jan. 2002-Dec. 2004
HK International Malta.
Site Zliten-Libya.
Administration & Site In charge.
Zliten Cement Plant rehabilitation Project Total water system(Utilities) as well as Smoke chimney 45 meter high with 8 meter diameter.
Administration & Site in charge in Cement Industries Zliten Cement Plant for Rehabilitation work for total Utilities ( Installation of Fire water System, PW System, Rain & Black water System, Water Desalination System, Compressor units etc.( Rehabilitation Project.) Contract documentation and site supervision of major drainage system.
Responsibilities/Tasks: Worked as a Adm./Site in charge of the project Administration and site arrangement. Work distribution, work progress, Material Procurement, Man power control etc.
August 1988-Dec.2001
Lisco Misurata Libya.
(Iron & steel industries)
Operation& Maintenance In charge.
Lisco (Libyan iron & steel Industries Misurata Libya.)
Operation & Maintenance in charge for total water utilities. Involve in training program for Local people, Group wise in each six months interval for all Heavy duty Rain water Pump Houses as well as Black water Pump Houses.
Responsibilities/Tasks: Maintenance planning, New pipe laying, modification of water system, Drawing reading, Fabrication of big diameter pipe Elbow and Tees fabrication, Maintenance of heat exchanger for Central water station etc.( All under training program)
July 1984 - July 1088
Mannesmann A.G. GmbH- Germany.
Utility erection Supervisor.
Non Technical Skill: Libian Iron & Steel Project.
Supervisor for Steel Industries (Misurata steel plant- North Africa. Responsible for erection & commissioning of Steel plant total Utilities (Direct/Indirect cooling water system, Fire water System, PW System (Drinking water) Rain water System, & Black water System. Work progress report of the Erection of Piping, As built Drawings, Site Inspections with Clint, as well as handing over the project to the Clint.
Responsibilities/Tasks: Work progress report of the Erection of Piping, As built Drawings, Site Inspections with Clint, as well as handing over project to the Clint.
Fluent in English & Arabic. Confident Team building, Negotiation, Hard working, and strong analytical skill.
Computer Skill: Application and software, Microsoft office, Auto Cad.
EMPLOYERS.
BABCOCK INDIA LTD. INDIA.
MANNESMANN A.G. GMBH. GERMANY.
LISCO. (LIBYAN IRON & STEEL COMPANY-LIBYA.)
HK INTERNATIONAL MALTA.
KAROLAK GMBH GERMANY.
ETOS ENGINEERING SERVICES FOR OIL & GAS INDUSTRIES.
LIBYA.
|
Required Salary & Conditions |
Working in Etos Oil & Gas in Rotation Basis. 8 weeks/ 2weeks.
300$/ Per day. |
Employment History |
| Total Years of Work Experience: |  | 31 |
| Commenced Full Time Work: |  | 1981 |
| Name |  | abdul majid sheikh |
| Job Title: |  | Mechanical Engineer |
| Duration |  | From : 1981 To: 2009 |
Summary |
EDUCATION Central Training Institute. (Technical Education Society), MAHARASHTRA STATE, SADAR, NAGPUR. INDIA.
DIPLOMA IN MECHANICAL ENGINEERING.
LANGUAGES LANGUAGE SPEAKING: ENGLISH - GOOD, HIND I- GOOD, ARABIC -GOOD.
LANGUAGE READING: ENGLISH - GOOD, HINDI - GOOD, ARABIC - FAIR.
LANGUAGE WRITING: ENGLISH - GOOD, HIND I- GOOD, ARABIC - POOR.
GEOGRAPHICAL EXPERIENCE
TOTAL 28 YEARS & CONTINU.
KEY QUALIFICATIONS
I have more than 28 years of general experience and at least 25 years experience within contact/project management of which 25 years are international experience and 3 years in India.
I started my carrier from Power Industries as an Erection and Supervision of structure/Ducting and Heavy Fan erection of 210 MW Boiler (with ID Fans/FD Fans.). Perfect erection in time with Insulation of the smoke Ducting, Painting of Columns respectively. Inspected and Hand over the Project to the client.
Worked as utility Supervisor for Steel Industries (Misurata steel plant- North Africa. Responsible for erection & commissioning of Steel plant total Utilities (Direct/Indirect cooling water system, Fire water System, PW System (Drinking water) Rain water System, & Black water System. Work progress report of the Erection of Piping, As built Drawings, Site Inspections with Clint, as well as handing over the project to the Clint.
Worked with Clint as operation & Maintenance in charge for total water utilities. Involve in training program for Local people, Group wise in each six months interval for all Heavy duty Rain water Pump Houses as well as Black water Pump Houses.
Worked as an Administration & Site in charge in Cement Industries Zliten Cement Plant for Rehabilitation work for total Utilities ( Installation of Fire water System, PW System, Rain & Black water System, Water Desalination System, Compressor units etc.( Rehabilitation Project.) Contract documentation and site supervision of major drainage system.
Site in charge TV Centre -Tripoli Rehabilitation Project of internal Piping. Installation of Fire water System, PW System, Rain & Black Water System, Water Desalination Unit etc.
Now working as Engineer Procurement in Etos Oil & Gas company for Purchase Foreign/Local goods for different Oil & Gas Companies all over the Libyan Oil Companies. I am still working for Oil & Gas for various duties related to the procurement of material, equipment, spare parts and services. Includes Researches supplies, vendors and services contractor locally and overseas to identify potential sources for required material, product and services. Negotiates price, deliveries and condition. Participates in evaluating tenders and quotations. Follows up on the time delivery of porches items.
CAREER HIGHLIGHTS
EXPERIENCE SUMMARY
Date from -Date to
Company
Location
Position
Project Name
Project Description
Responsibilities/Tasks
PROJECT NAME
Feb.2008 till Nov.2009 & continue
Etos Engineering Services for Oil & Gas Industries.
Site Tripoli-Libya
Engineer Procurement. Etos Engineering services for Oil & Gas Industries.
Now working as Engineer Procurement in Etos Oil & Gas company for Purchase Foreign/Local goods for different Oil & Gas Companies all over the Libyan Oil Companies. I am still working for Oil & Gas for various duties related to the procurement of material, equipment, spare parts and services. Includes Researches supplies, vendors and services contractor locally and overseas to identify potential sources for required material, product and services. Negotiates price, deliveries and condition. Participates in evaluating tenders and quotations. Follows up on the time delivery of porches items.
PROJECT NAME
Jan. 2005-Dec. 2007
Karolak GmbH Germany.
Site Tripoli- Libya
Site In charge.
TV Center Rehabilitation of internal water system (Utilities)
Project Description: TV Centre -Tripoli Rehabilitation Project of internal Piping. Installation of Fire water System, PW System, Rain & Black Water System, Water Desalination Unit etc. modified all most 50% Rain water system as well as Black water system.
Responsibilities/Tasks: Worked as a Site in charge of the project Administration and site arrangement. Work distribution, work progress, Man power control etc.
Jan. 2002-Dec. 2004
HK International Malta.
Site Zliten-Libya.
Administration & Site In charge.
Zliten Cement Plant rehabilitation Project Total water system(Utilities) as well as Smoke chimney 45 meter high with 8 meter diameter.
Administration & Site in charge in Cement Industries Zliten Cement Plant for Rehabilitation work for total Utilities ( Installation of Fire water System, PW System, Rain & Black water System, Water Desalination System, Compressor units etc.( Rehabilitation Project.) Contract documentation and site supervision of major drainage system.
Responsibilities/Tasks: Worked as a Adm./Site in charge of the project Administration and site arrangement. Work distribution, work progress, Material Procurement, Man power control etc.
August 1988-Dec.2001
Lisco Misurata Libya.
(Iron & steel industries)
Operation& Maintenance In charge.
Lisco (Libyan iron & steel Industries Misurata Libya.)
Operation & Maintenance in charge for total water utilities. Involve in training program for Local people, Group wise in each six months interval for all Heavy duty Rain water Pump Houses as well as Black water Pump Houses.
Responsibilities/Tasks: Maintenance planning, New pipe laying, modification of water system, Drawing reading, Fabrication of big diameter pipe Elbow and Tees fabrication, Maintenance of heat exchanger for Central water station etc.( All under training program)
July 1984 - July 1088
Mannesmann A.G. GmbH- Germany.
Utility erection Supervisor.
Non Technical Skill: Libian Iron & Steel Project.
Supervisor for Steel Industries (Misurata steel plant- North Africa. Responsible for erection & commissioning of Steel plant total Utilities (Direct/Indirect cooling water system, Fire water System, PW System (Drinking water) Rain water System, & Black water System. Work progress report of the Erection of Piping, As built Drawings, Site Inspections with Clint, as well as handing over the project to the Clint.
Responsibilities/Tasks: Work progress report of the Erection of Piping, As built Drawings, Site Inspections with Clint, as well as handing over project to the Clint.
Fluent in English & Arabic. Confident Team building, Negotiation, Hard working, and strong analytical skill.
Computer Skill: Application and software, Microsoft office, Auto Cad.
EMPLOYERS.
BABCOCK INDIA LTD. INDIA.
MANNESMANN A.G. GMBH. GERMANY.
LISCO. (LIBYAN IRON & STEEL COMPANY-LIBYA.)
HK INTERNATIONAL MALTA.
KAROLAK GMBH GERMANY.
ETOS ENGINEERING SERVICES FOR OIL & GAS INDUSTRIES.
LIBYA.
|
Work Experience |
| Application and Software, Microsoft office, Auto Cad. |
Comments/ Hobbies/ Interests etc: |
| Football, Cricket, News, films and travel. |
Last Updated on 09-Nov-11
|