| |
|
| Year of birth |  | 1977 |
Permanent/Home Location/Address |
| City or Town |  | bataan |
| State |  | bataan |
| Country |  | PHILIPPINES |
Current Location/Address |
| Country |  | QATAR |
Languages |
| Primary Language |  | Fluency |
| Tagalog |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | PHILIPPINES |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Design Engineer |  | 3 |
| Piping Designers |  | 4 |
| Industry |  | Years Experience |
| Engineering |  | 4 |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | ENGINEERING | PHILIPPINES | 1999 |
|
Work Locations |
| Are you willing to move or relocate? |  |
| Yes - I will relocate internationally |  |
Availability |
| Start Immediately? |  | Available Now |
Ideal Next Job |
| open to all offers |
Required Salary & Conditions |
| minimum salary USD 4000 plus paid housing |
Employment History |
| Total Years of Work Experience: |  | 10 |
| Commenced Full Time Work: |  | 2000 |
| Job Title: |  | Line Checker/Piping Inspector |
Work Experience |
DARWIN SAMPANG DACION
135 Gabon St. Abucay Bataan
Cell phone # +639082148294
OBJECTIVE
To put into practice the things that I have learned develop my ability in nurturing a balance engineering expertise, commercial awareness, technical insights and consultancy skills.
WORK EXPERIENCE
Company E.R. Venzon Refilling Plant
Address Panilao Pilar Bataan
Position Held Plant Supervisor
Period July 1999 – March 2000
Duties and Responsibilities
• Evaluation of workmanship quality
• Preparing & submission of daily reports
• Checking of daily equipment status report
• Material quantity & quality controller
• In charge in plant sanitation
Company Diversified Plastic Films Systems Incorporation
Address Alion Batangas 2 Mariveles, Bataan
Position Held CPP Line Leader
Period June 2004 – Up to Present
Primary Functions
• Handles the immediate supervision of the operation of the CPP Line, CPP slitter, and CW800-1 to attain optimum efficiencies.
• Assist the shift supervisor in implementing the personnel and safety policies and programs.
• Directs and implementing the total quality controls programs.
• To observe safety policies, rules, and regulation.
Duties and Responsibilities
• Assisting in Training of operators
• Checking of shift production reports done by the operator
• Performing shift supervisor if he’s absent
• Coordinating with QC/QA for quality checks and assist in trouble shooting quality defects.
• Checking of CPP raw material utilization during shift start and shift end inventory of material available in the CPP raw mat’s area.
• Implementing good housekeeping
Company Chiyoda Philippines Corporation
Address Meralco Ave. Cor. Gen. Areneta St. Pasig City
Position Held Junior Design Engineer
Period July 2006 – May 2007
Job Description
Assign as a unit leader in area 06 and 08 of QGX train 5. In charge in checking of ISO as per standard, specification and project requirement. Consistency checking of isometric drawing . Area wise and line wise clash checking. Revising of ISO as per latest FDC
Company Chiyoda Philippines Corporation
Address Meralco Ave. Cor. Gen. Areneta St. Pasig City
Position Held Design Engineer
Period June 2007 – March 2008
Primary Functions
• Implementation of detailed design execution
• Conduct Planning, scheduling and monitoring of 3D/2D design activities including detail design, 3D model review, clash check.
• Prepare and report weekly status, man-hour and work volume.
• Establish and update document control list.
• Final check and review and approval of deliverables.
• Directly manage the design and PDS input and ISSUE FOR CONSTRUCTION (IFC) issue control.
• Control of quality and man-hour
Job Description
Assign as a unit leader in AKG2 (Main Pipe Rack) MPR BLK 1 – 6. In charge in checking of ISO as per standard, specification and project requirement. Consistency checking of isometric drawing. Incorporate APJ comments on final ISO prior to final issue. Loading data updating, FLEX ISO preparation, re-routing of small bore, checking of SPS detail prior to final and revision issue. Area wise and line wise clash checking. Monitoring of daily activity of designer and PDS operator.
Company Chiyoda Technip Joint Venture (PROJECT SITE ASSIGNMENT)
Address Ras Laffan City of Qatar
Position Held Line checker / Piping inspector
Period April 2008 – up to Present
Job Description
• Line checking in RGX train 6, RGX train 7, and AKG2 option 4A and AKG2 main process (BASE CASE).
• Monitoring and expediting of company comment to site.
• Assisting piping supervisor in all piping works.
• Supervising all internal pipe cleaning.
• Preparation of FDC (Field Design Change) and Field engineering.
Feb. 2006 : ISO 9001:2000 Quality management system awareness orientation
Program.
Chiyoda Philippines Corporation
Meralco Ave. Cor. Gen. Araneta St. Pasig City
March 2006 : 2D microstation SE training program, creating of plot plan,
Equipment modeling, plotting DGN files pipe rack modeling with
complete details, pipe routing study and modeling, and PDS
training program.
Chiyoda Philippines Corporation
Meralco Ave. Cor. Gen. Araneta St. Pasig City
May 2006 – July 2006 : SPR manipulation, Clash checking ISO consistency Checking (OJT)
Chiyoda Philippines Corporation
Meralco Ave. Cor. Gen. Araneta St. Pasig City
EDUCATIONAL BACKGROUND
Elementary School : Tomas Pin-pin Memorial Elementary School
Abucay Bataan (1984 – 1990)
High School : Bonifacio Camacho High School
Abucay, Bataan (1990 – 1994)
College : Bataan Heroes Memorial College
Balanga, Bataan (1994 – 1999)
Course : Bachelor of Science in Mechanical Engineering
|
Last Updated on 25-Jul-10
-- End of CV/Resume --
Full CV/Resume available to paid companies/recruiters as an attachment
|