| Year of birth |  | 1959 |
Permanent/Home Location/Address |
| City or Town |  | Parker |
| State |  | Colorado |
| Country |  | USA |
Current Location/Address |
| State |  | Colorado |
| Country |  | USA |
Languages |
| Primary Language |  | Fluency |
| English |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | USA |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Piping Designers |  | 22 |
| Industry |  | Years Experience |
| Power |  | 7 |
| Petrochemical - Refinery |  | 18 |
| Oil and Gas |  | 18 |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | Business Administration | Biola University | 1981 |
|
Computer Skills and Software Used |
| Intergraph PDS, Bentley Design Series Modeling, Bentley Autoplant, Microstation J, Microstation V8, Autocad, Quickpen, Solidworks |
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will travel domestically
Yes - I will relocate domestically
Yes - I will travel internationally
Yes - I will relocate internationally |  |
Availability |
| Earliest Start Date |  | Given 2 weeks notice |
Ideal Next Job |
| Open to all offers. |
Required Salary & Conditions |
| Negotiable |
Employment History |
| Total Years of Work Experience: |  | 23 |
| Commenced Full Time Work: |  | 1987 |
| Name |  | Jon Wegener |
| Job Title: |  | Senior Piping Designer |
| Duration |  | From : 1987 To: 2009 |
Summary |
| 22 years of experience as a Piping Designer including 18 years as a 3D modeler with experience using Microstation, Intergraph PDS, Pelican Forge, Smart Plant Review, Bentley’s Design Series Modeling, Autocad 2008, Rebis/Autoplant, Navisworks, SolidWorks, QuickPen, and CadPipe. |
Work Experience |
CH2M Hill, Denver, CO
Lead Designer/Piping & General Arrangements – December 2004 to Present
Currently I am a Lead Piping Designer in the Power Group using Intergraph PDS, Pelican Forge Support Modeler and Intergraph Smart Plant Review. Responsibilities include 3D equipment modeling,
detailed piping layout, and inter-discipline coordination. Recent experience has included directing and approving the work of several designers spread throughout our international offices and I spent
over a year at a job site near Reno, NV as the Field Engineer and liaison between our engineering group in Denver and the Construction supervisors and resolving issues with the sub-contractors.
Lead Piping Designer:
Wyodak Baghouse Upgrade, Wyodak Power Plant, Gillette, WY
Culbertson Generation Station, 90 MW, Culbertson, MT.
Frank A. Tracy Combined Cycle Power Plant, 500 MW, Reno, NV
Hardin Generating Station/Colorado Energy Management, 116 MW, Coal Fired Power Plant, Hardin, MT
Stanley Consultants, Denver, CO
Lead Piping Designer - April 2004 to December 2004
Using both AutoCAD 3D and MicroStation V8 with Bentley’s Design Series Modeling produced detailed 3D models and extracted the Orthographics and detailed drawings for construction.
Lead Piping Designer:
Arizona State University, Combined Heat and Power Plant, Phoenix, Arizona
Arizona State University, Chiller Replacement Project, Phoenix, Arizona
Barlow Engineering Services, Denver, CO
Lead Piping Designer - May 2002 to May 2004
As the head of the piping group I was responsible for the overall equipment layout and 3D model associated with each project. My duties included producing engineering man-hour estimates and
drawing lists to establish deliverables. I reviewed vendor drawings to evaluate orientations and constructability issues affecting the layout of the facility. I supervised the production of general
arrangements, piping orthographics, isometrics and proposal drawings for the Waste to Energy plants we designed. We used AutoCAD and the Quickpen piping module to produce 3D models which
could be reviewed by all disciplines thru Navisworks. All of our drawings were extracted from the 3D model to a 2D format for ease of editing and distribution to the client.
Lead Piping Designer:
Harrisonburg Resource Recovery Facility, 200 Tons/Day Waste-to-Energy Facility, James Madison University, Harrisonburg, Virginia
Harrisburg Materials, Energy, Recycling and Recovery Facility, 800 Tons/Day, Harrisburg, Pennsylvania
National Energy Production Corporation (now SNC Lavalin), Seattle, WA/Denver, CO
Lead Piping Designer - July 1999 to May 2002
Responsibilities included developing general arrangements, orthographics and isometrics using Rebis and 3D AutoCAD software for equipment and piping layout. Other responsibilities were reviewing
P&ID’s with the process group, coordinating above ground and underground piping systems with structural, electrical and instrumentation groups, interface with piping stress/support engineering
group and on site small bore pipe fabrication design drawings.
Lead Piping Designer:
Coyote Springs II, LLC, 280 MW Combined Cycle Power Plant, Boardman, Oregon
Fountain Valley Power LLC, 240 MW Simple Cycle Peaking Power Plant, Colorado Springs, Colorado
LS Power, LLC, 1,160 MW Combined Cycle Power Plant, Minooka, Illinois
Enron North America, 500 MW Simple Cycle Peaking Power Plant, Gleason, Tennessee
Enron North America, 450 MW Simple Cycle Peaking Power Plant, Wheatland, Illinois
Senior Piping Designer:
Air Liquide/Shell Refinery, 80 MW Cogeneration Power Plant, Ft. Saskatchewan, Alberta, Canada
Anvil Corporation, Bellingham, WA
Senior/Lead Piping Designer - 1993 to 1999
Initialized engineering man-hour estimates working with process engineers to develop project P&ID’s and line lists. Gathered input from site visits, client engineers, operators and maintenance
representatives to establish layout requirements. Produced models using Rebis and 3D AutoCAD to develop orthographic and isometric drawings. Reviewed vendor equipment drawings, coordinated
interdepartmental drawing reviews and checked final construction drawings for accuracy.
Lead Piping Designer:
Coker Debottlenecking Project, Arco Cherry Point Refinery, Ferndale, Washington
Primary Water Treatment Plant, North Clarifier, Alcoa/Intalco Aluminum Corp., Ferndale, Washington
Dock Completion Project, Arco Cherry Point Refinery, Ferndale, Washington
Chemical Treating Unit Salt Towers, Arco Cherry Point Refinery, Ferndale, Washington
#1 Reformer Silica Trap, Arco Cherry Point Refinery, Ferndale, Washington
Drill Site Water & Gas Injection Modules, Arco Alaska, Kuparuk, Alaska
Piping Designer:
U.S. Coast Guard Buoy Tender, Marionette Marine, Marionette, Wisconsin
Field Engineer:
Miscellaneous Expense Projects, Arco Cherry Point Refinery, Ferndale, Washington
Total Plant Shutdown, Texaco Refinery, Anacortes, Washington
Zurn-Nepco Inc., Redmond, WA
Piping Designer - 1992 to 1993
Saranac Energy Plant, Plattsburgh, New York
Ebasco Services Inc., Santa Ana, CA
Piping Designer - 1992 to 1992
Imperial Irrigation District, El Centro Unit 2 Repowering, Imperial, California
The Ralph M. Parsons Co., Pasadena, CA
Principle Designer/Checker - 1991 to 1992
Southern Area Oil and Gas Projects, Saudi Aramco Services, Saudi Arabia
Anvil Corporation, Bellingham, WA
Lead Piping Designer - 1987 to 1991
Lead Piping Designer:
Flash Tower Addition, Petro Star Refinery, North Pole, Alaska
LPG Storage and Shipping Facility, Chevron Refinery, Burnaby, B.C., Canada
P&ID As-Builts, Marathon Off-Shore Oil Production Platform, Cook Inlet, Alaska
Piping Designer:
LPG Storage and Shipping Facility, Texaco Refinery, Anacortes, Washington
Clean Fuels Project, Arco Cherry Point Refinery, Ferndale, Washington
Lignin Tank Replacement, Georgia Pacific, Bellingham, Washington
PSV Audit and Hazard Analysis, Arco Watson Refinery, Carson, California
Field Engineer:
Total Plant Shutdown, British Petroleum Refinery, Ferndale, Washington
Total Plant Shutdown, Texaco Refinery, Anacortes, Washington
Total Plant Shutdown, Arco Cherry Point Refinery, Ferndale, Washington |
Last Updated on 10-May-10
-- End of CV/Resume --
Full CV/Resume available to paid companies/recruiters as an attachment
|