| |
|
| Year of birth |  | 1973 |
Current Location/Address |
| City or Town |  | UYO |
| State |  | AKWA IBOM |
| Country |  | NIGERIA |
Permanent/Home Location/Address |
| Country |  | NIGERIA |
Languages |
| Primary Language |  | Fluency |
| English |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | NIGERIA |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| CAD Designers |  | 14 |
| Piping Designers |  | 14 |
| Designer |  | 14 |
| Subsea Designers |  | 7 |
| Civil/Structural Designer |  | 11 |
| Industry |  | Years Experience |
| Oil and Gas |  | 14 |
| Engineering |  | 14 |
| Pipelines |  | 11 |
Qualifications |
| Highest Qualifications |  | HND/Diploma |
| Qualification | Subject | Establishment/Country | Year |
| HND/Diploma | Computer | Institute of Management & Technology, Nigeria | 2000 |
|
Computer Skills and Software Used |
| MS Words, Excel, PowerPoint, MS Projects, Access, Aveva PDMS, Autodesk Inventor, AutoCAD R12 - 2008, Bentley Inroads, CADworx Pipe, Microstation, Adobe Photodelux Business Edition, Adobe Acrobat Distiller, CorelDraw, Ulead Photo-impact Se, Win Zip, Wedshots Desktop, CD Writer & Scanner And Others. |
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will travel domestically
Yes - I will relocate domestically
Yes - I will travel internationally
Yes - I will relocate internationally |  |
Availability |
| Earliest Start Date |  | Given 3 weeks notice |
Ideal Next Job |
| looking for work in a Lead/Senior role on a married and/or single status basis or Open to all offers |
Required Salary & Conditions |
| Minimum salary USD 5,500 per month plus paid housing and schooling for my two children |
Employment History |
| Total Years of Work Experience: |  | 15 |
| Commenced Full Time Work: |  | 1995 |
| Name |  | SAIPEM (Saibos) ENGINEERING NIG LIMITED |
| Job Title: |  | Lead Piping/Pipeline Designer |
| Duration |  | From : 2009 To: |
Summary |
EXPERIENCED DESIGNER WITH OVER FOURTEEN YEARS WORKING EXPERIENCE:
I have been working as a Piping/Pipeline CAD Designer and as a Multi- Discipline CAD Designer with Designs and Constructions Firms for past twelve years now with others working under me in difference project undertaken by the companies, also have experience and skills in PDMS, Autodesk Inventor, Auto-CAD both on 2D/3D drawings and designs. With the understanding of the engineering practice codes use by must of the oil producing companies like Exxon Mobil, Shell Petroleum, Chevron Texaco, Total (Elf Petroleum), Addax Petroleum, Agip (Eni Group) and others.
I also involve in engineering and design of industrial installations, experience which I acquire by taking part in all discipline of engineering designs and drawings for most of the Oil and Gas industries will be an advantage for me to work with any employer that need my services. |
Work Experience |
WORKING EXPERIENCE: 1995-2010 (LAND, SWAMP, OFFSHORE & SUBSEA)
SAIPEM (Saibos) ENGINEERING NIG LIMITED: LEAD PIPING/PIPELINE DESIGNER (Feb. 2009 – Till Date).
PROJECTS INVOLVED:
TOTAL E&P NIGERIA – USAN DEEPWATER UFR & OLT DEVELOPMENT PROJECT: Detailed engineering design, installation and construction for Usan Deepwater Umbilical’s, Flowlines, Risers & Oil Loading Terminal project.
RESPONSIBILITIES:
• Oversee the day to day activities of the drawing office staff (Piping/Pipeline and Structural) and ensure timely completion of the job.
• Involved in site surveys.
• Preparation of daily site report.
• Check the interface between disciplines at all stages of the design.
• Ensure that my team members complied with Company safety regulations/standards and have understanding International code/Standards for difference Oil and Gas Company.
• Preparation of Pipeline, Piping, Route Map, Alignment Sheet, Isometrics, Riser Clamp, Top Assembly Structure and Jumper drawings for project execution.
MAKON ENGINEERING & TECHNICAL SERVICES LIMITED: LEAD CAD DESIGNER (Nov. 2008 – Jan. 2009).
PROJECTS INVOLVED:
SPDC- DOMESTIC GAS SUPPLT (DOMGAS) PROJECT: Detailed engineering design for Atmospheric Gas Compression packages, Gas Processing Packages, Condensate handling, stabilization, metering and export packages, Plant utilities systems and Equipment foundation and other civil/Structural works.
RESPONSIBILITIES:
• Oversee the day to day activities of the drawing office staff and ensure timely completion of the job.
• Involved in site surveys.
• Preparation of daily site report.
• Ensure that my team members complied with Company safety regulations/standards and have understanding International code/Standards for difference Oil and Gas Company.
• Check the interface between disciplines at all stages of the design.
• Preparation of Piping, Isometrics, Structural, Electrical, Process and Instrumentation drawings for project execution.
• Back-drafting of old drawings from the hard copy.
• Study of Structures & Piping in 3D using AutoCAD.
• Updating of Piping, Structural, Electrical, Process and Instrumentation drawings for as-built dossier.
POINT ENGINEERING LIMITED: SENIOR PIPING/ CAD DESIGNER (June. 2005 – Oct. 2008).
PROJECTS INVOLVED:
NIGERIAN GAS COMPANY- BENIN GAS MONITORING STATION PROJECT: Detailed engineering design package for installation and construction works, for the Benin gas quality monitoring station for West African gas pipeline project.
TOTAL- USAN FIELD DEVELOPMENT PROJECT: Detailed engineering design package for installation and construction works, for the New Usan Subsea Manifold.
ADDAX- TB-1212 ADANGA REDEVELOPMENT PROJECT: Engineering studies and detailed engineering design package for installation and construction works, for Adanga Production Complex
DWC CONSULTANCY- DESIGN FOR 3-PILE PLATFORM PROJECT: This project entails the development of the topside facilities on the Ekeh wellhead tripod platform and a 4” Test and 6” production riser which ties into a 4’ and 6’ departing pipeline respectively to the Middleton Production platform.
MOBIL- GAS LIFT PROJECT: Detailed engineering design package for installation and construction works, for the New Dual and Triplex Well Heads, Tie-In of the New Flow-lines and introducing New Gas Lift Lines to the wells. The platforms are Isobo “A”, Ubit “GE”, Ubit “GH”, Ubit “GJ” Ubit “K”, Enang “E”, Ubit “GG”, Asasa “VA” and Asasa “VB”.
MOBIL- CRITICAL PIPELINES PROJECT: Detailed engineering design package for segments replacement of three (3) Critical Bulk liquid Pipelines. These pipelines are as follows; 20” Pipeline from Ubit “PP” to Usari “FA”, 24” pipeline downstream of the sub sea manifold near Idoho to QIT and 24” pipeline from Idoho to QIT .
MOBIL-UNAM “A” ADDTION OF INTERNAL SLOT AND FLOWLINES PROJECT: Detailed engineering design package for installation and construction works, for the New Triplex Well Heads and Tie-In of the New Flow-lines to the existing header.
MOBIL-ENANG “A” EXTERNAL SLOT ADDITION PHASE 2 & PHASE 3 PROJECT: Detailed engineering design package for installation and construction works, of New External Guide for the New Triplex Well Heads and Tie-In of the New Flow-lines to the existing header.
MOBIL-USARI “B” WELL SLOT OPTIMIZATION PROJECT: Detailed engineering design package for installation and construction works, for the New Triplex Well Heads, Tie-In of the New Flow-lines and Gas Lift Lines to the existing headers.
MOBIL-UBIT “B” ADDITION OF INTERNAL SLOT PROJECT: Detailed engineering design package for installation and construction works, of New Internal Guide for the New Triplex Well Heads and Tie-In of the New Flow-lines to the existing headers.
SNEPCO-DEFINE PHASE FOR BONGA SW / APARO GAS EXPORT PIPELINE PROJECT: Detailed engineering design package for installation and construction of Pipeline/Riser Thermal Expansion.
NAOC-GTS-4 NLNG GAS SUPPLY 36” RUMUJI TO BONNY AS-BUILT PROJECT: Updating all data and as-built information identified during as-built survey.
RESPONSIBILITIES:
• Involved in site surveys.
• Oversee the day to day activities of the drawing office staff and ensure timely completion of the job.
• Check the interface between disciplines at all stages of the design.
• Ensure that my team members complied with Company safety regulations/standards and have understanding International code/Standards for difference Oil and Gas Company.
• Preparation of daily site report.
• Preparation of Pipeline, Piping, Route Map, Alignment Sheet, Isometrics, Structural, Electrical, Process and Instrumentation drawings for project execution.
• Back-drafting of old drawings from the hard copy.
• Study of Structures & Piping in 3D using AutoCAD.
• Updating of Piping, Structural, Electrical, Process and Instrumentation drawings for as-built dossier.
• Updating of pipeline Route Maps, route & profile, road, track, river, creek & crossings, utility Crossings and cathodic protection drawings for as-built dossier.
WILLBROS NIGERIA LIMITED: LEAD CAD DESIGNER (OCT. 2004 – May, 2005).
PROJECTS INVOLVED:
SPDC-OFFSHORE GAS GATHERING SYSTEM (OGGS) RECEIVING FACILITY PROJECT: Detailed engineering design / redesign for installation and construction for OGGS receiving facility.
RESPONSIBILITIES:
• Oversee the day to day activities of the drawing office staff and ensure timely completion of the job.
• Involved in site surveys.
• Check the interface between disciplines at all stages of the design.
• Ensure that my team members complied with Company safety regulations/standards and have understanding International code/Standards for difference Oil and Gas Company.
• Preparation of project material-take-off (MTO) for bid estimation and project execution.
• Preparation of Route Map, Alignment Sheet, Pipeline, Piping, Isometrics, Structural, Electrical, Process and Instrumentation drawings for project execution.
• Back-drafting of old drawings from the hard copy.
• Study of Structures & Piping in 3D using AutoCAD.
SUFFOLK PETROLEUM SERVICES LIMITED - ENGINEERING DIVISION
(ADAMAC GROUP COMPANIES): LEAD CAD DESIGNER (OCT. 2000 – SEP. 20 04).
PROJECTS INVOLVED:
SPDC-KCDP JACKET INSTALLATION FACILITIES IMPROVEMENT & ACCELERATED DEMANNING OF BONNY CLP: Basic engineering design and installation of close / open drain vessels, export pumps, emergency generators, sub-cellar deck, main deck extension, new jacket installation for KCDP-B, and new Electrical installation at CLP.
SPDC-FORCADOS YOKRI INTEGRATED PROJECT (FYIP) ONSHORE & OFFSHORE: Detailed engineering design for installation and construction.
SPDC-OFFSHORE GAS GATHERING SYSTEM PROJECT (OGGS): Detailed engineering design for installation and construction.
MOBIL-SPM BUOY (1548) OVERHAUL PROJECT:
MOBIL-WELLHEAD REVAMP PROJECT: Basic engineering design details & construction to rehabilitate some wellhead platforms in order to improve safety and enhance reliability.
MOBIL-RISER REPAIR PROJECT: General inspection of riser in Mobil offshore facilities, flushing, repairs and installation of riser clamp, riser clad
MOBIL-SPM BUOY (1096) CHANGE-OUT PROJECT:
WILLBROS-OTUO FIELD DEVELOPMENT PHASE 2: Basic engineering design and installation of new modules.
CHEVRON OFFSHORE PLATFORMS-OKAN FINAL UPGRADE PROJECT: Basic engineering design and installation of new modules, pipe, flushing and construction works.
RESPONSIBILITIES:
• Oversee the day to day activities of the drawing office staff and ensure timely completion of the job.
• Check the interface between disciplines at all stages of the design.
• Preparation of daily site report.
• Involved in site surveys.
• Preparation of project material-take-off (MTO) for bid estimation and project execution.
• Preparation of Route Map, Alignment Sheet, pipeline, Piping, Structural, Electrical, Process, Instrumentation & architectural drawings for bid package and project execution.
• Preparation of lifting procedures for crane lifting operations in projects undertaken by company.
• Preparation of barge mooring pattern and barge setup for barge operation.
• Back-drafting of old drawings from the hard copy.
• Preparation of as-built dossier.
• Study of Structures & Piping in 3D using AutoCAD.
ABB LUMMUS GLOBAL NIGERIA LTD: CAD DESIGNER (NOV. 95 – SEP. 2000).
PROJECTS INVOLVED:
MOBIL-OFFSHORE REVAMP PROJECT: Phase 1 engineering of Mobil’s offshore revamp project to rehabilitate 38 wellhead platforms and 2 production platforms in order to improve safety and enhance reliability.
MOBIL-EWS PROJECT: Phase 2 EPC project for an emulsion water system being installed at Mobil onshore terminal (QIT, Eket).
AGIP-FLOWSTATION REVAMP PROJECT: Basic engineering for the revamp of Oshie, Brass, Ogbainbiri and Ebocha flowstations.
SPDC-FLOWSTATIONS ENVIRONMENTAL UPGRADE PROJECT: Basic engineering design and installation of flare knockout vessel and environmental upgrade of Alakiri, Awoba, Bonny, Buguma, Krakarama, Orubiri and Cawthrone Channel 1, 2 & 3 flowstations.
SPDC-BELEMA GAS PLANT PROJECT: Basic engineering design package, installation and construction on the pig launcher and pig receiver of the following, Odeama AG gas facilities – Belema gas injection plant, Belema gas injection plant – Ekulama 2 AG / gas lift facilities and Belema flowstation – Sego manifold oil loopline.
SPDC-RECIPROCATING TO CENTRIFUGAL PUMPS REPLACEMENT DESIGN: The work comprises review of cp generic design, Structural and Piping modifications for new centrifugal pump installation, NPSH calculation, elimination vibration tendencies, detailed Process/Piping design and pump bay gentry crane installation design for Nembe 1, Nembe 2 and Ekulama flowstations.
SPDC-BELEMA GAS INJECTION PROJECT: Basic engineering design package, installation and construction of new gas injection plant on following flowstations Belema, Ekulama 1, Ekulama 2 and Odeama.
SPDC-8”X18”KM OBIGBO-IA/RA HP GASLINE: Basic engineering design package, installation, construction and laying of high pressure gasline from Obigbo gas plant to shell industrial area / shell residential area
NLNG PROJECT: Basic engineering design package, installation and construction on transit building upgrade, new archives building, field maintenance facilities diesel line.
RESPONSIBILITIES:
• Involved in site surveys.
• Preparation of project material-take-off (MTO) for bid estimation and project execution.
• Preparation of Instrumentation, Process, Electrical, Route Map, Alignment Sheet, pipeline, Piping & architectural drawings for bid package and project execution.
• Preparation instrument and Electrical index, instrument data sheet, installation details & instrument loop sheets.
• Preparation of as-built dossier.
• Back-drafting of old drawings from the hard copy.
POINT ENGINEERING SERVICES LIMITED: CAD DESIGNER (TWO MONTHS HOLIDAY JOB).
PROJECTS INVOLVED:
SPDC-FLOWSTATIONS ENVIRONMENTAL UPGRADE PROJECT: Basic engineering design and installation of flare knockout vessel and environmental upgrade of Obigbo, Imo river 1 & 2 flowstations.
RESPONSIBILITIES:
• Involved in site surveys.
• Preparation of Piping, Structural, Electrical, Process & Instrumentation drawings for project execution.
ILF CONSULTING ENGINEERING: CAD DESIGNER (TWO MONTHS HOLIDAY JOB).
PROJECTS INVOLVED:
SPDC-WESTERN DIVISION ELECTRIFICATION SCHEME PROJECT: Detailed engineering design for electrification scheme for Egbemo-Angalabiri and Agbidiama communities.
RESPONSIBILITIES:
• Involved in site surveys.
• Preparation of Route Map, Alignment Sheet, pipeline, Electrical, Instrumentation drawings for project execution. |
Last Updated on 12-Apr-10
-- End of CV/Resume --
Full CV/Resume available to paid companies/recruiters as an attachment
|