| |
|
| Year of birth |  | 1958 |
Permanent/Home Location/Address |
| City or Town |  | Tandang Sora, Quezon City |
| State |  | 1116 |
| Country |  | PHILIPPINES |
Current Location/Address |
| Country |  | PERU |
Languages |
| Primary Language |  | Fluency |
| Tagalog |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | PHILIPPINES |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Piping Superintendent |  | 4 |
| Piping Engineer |  | 14 |
| Piping Designers |  | 4 |
| Piping Supervisor |  | 2 |
| Maintenance Superintendent |  | 2 |
| Industry |  | Years Experience |
| Oil and Gas |  | 12 |
| Petrochemical - Refinery |  | 7 |
| Pipelines |  | 2 |
| Steel |  | 4 |
| Water |  | 1 |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | BS Mechanical Engineering | Mapua Instituten of Technology | 1981 |
Other Qualifications, Memberships, Certification
Philippine Society of Mechanical Engineers - Full Member |
Computer Skills and Software Used |
| Microsoft Office |
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will travel domestically
Yes - I will relocate domestically
Yes - I will travel internationally
Yes - I will relocate internationally |  |
Availability |
| Start Immediately? |  | Available Now |
| Earliest Start Date |  | 01/08/2010 |
Ideal Next Job |
Construction Superintendent- Piping
Project Engineer - Field
Piping Engineer - Field
Open to all offers |
Required Salary & Conditions |
Annual salary - negotiable
Rotation of not more than 12 weeks on site. |
Employment History |
| Total Years of Work Experience: |  | 29 |
| Commenced Full Time Work: |  | 1981 |
| Name |  | Peru LNG SRL |
| Job Title: |  | Piping Engineer-Field |
| Duration |  | From : 2008 To: 2009 |
Summary |
| Over 26 years extensive experience in Project Management (supervision, monitoring, coordination and engineering); of which, over 5 years in upstream oil & gas facilities; 15 years in downstream projects of oil & gas and industrial plants, over 6 years in engineering and over 2 years in maintenance projects. |
Work Experience |
Technical Qualifications
• Extensive experience in the construction of Oil & Gas Plants, Petrochemical and Industrial Plants including related facilities. Ample experience in onshore Pipeline projects. Familiar in Project Management and able to supervise multi-discipline and multi-cultural group.
• Familiar in the application of International Standards; ANSI/ASME Standards, API, MSS-SP and other standards and specifications. Familiar with other major company standard and specifications for Oil & Gas, Petrochemical and Industries.
• Design - Contribute directly to construction engineering in the resolution of technical design problems. Experienced in trouble shooting in construction problems and difficulties due to discrepancies in design, space or material availability. Can provide recommendation in the modifications for best solution without jeopardy to quality and minimal delay to enhance site activities.
• Design – Conceptual design and procurement. Ensure to meet the deliverables target. As Piping engineer, to contribute in the layout of equipment for proper piping routing and arrangement for accessibility. Checking the isometrics and bill of material. Provide proper specifications from selected line classes and project standards. Selection of valves from the vendors, piping specialties. Coordinate with other disciplines for instruments and electrical hook-ups.
• Generates and/or review Test Packages for Pre-commissioning activities based on System Definitions by the Commissioning Group. Approve, witness or conducts pressure testing of piping systems. Generates punch list prior to testing and final system walk down prior to acceptance of the project.
• Quality Assurance – Responsible for working within the provisions and guidelines of the Quality Assurance system relevant to Oil & Gas or other Petrochemical industries. Familiar in ISO 9001..
• Safety – Responsible for personal safety, other worker’s safety and safe working practices for the project. Understand and follow Iso-14000 and OH&S procedures.
• Interface with clients, contractors or sub-contractors for smooth operation of the project. Coordinates and liaise with involved disciplines. With ample knowledge in Civil and Electrical construction.
Professional Experience
Position Project Engineer – Field Piping
Company Compania Operadura de LNG del Peru
Operator of PERU LNG
Lima, Peru
Date May 2008 – May 2010
Project Peru LNG Export Processing Plant
LNG Plant Project - Train 1
Pampa Melchorita, Peru
Position Project Engineer
Company EDG Projectos Angola, Lda.
Luanda, Angola
Date October 2007 – March 2008
Project Chevron-Cabinda Gulf Oil Company Limited
Produced Water Upgrade
BBLT Block 14 Offshore Platform
Project Chevron-Cabinda Gulf Oil Company Limited
Offshore Platforms De-Bottlenecking Calculations
GS-Lima, GS-Mike, GS-Papa
Position Sr. Construction Supervisor
Company Dolphin Energy, Limited
Ras Laffan Industrial City, Qatar
Partly owned by Qatar Petroleum, Abu Dhabi ADCO and Total Fina Elf
Duration January 2007 to October 2007
Project Gas Processing Plant and Compression Facilities
Position Mechanical Superintendent
Company Nigeria Liquefied Natural Gas, Ltd. (NLNG)
Bonny Island, River State, Nigeria
Shell Petroleum Dev. Corp
Duration March 2005 to Sept. 2006
Project Gas Transmission Pipeline (GTS-4)
Consist of 36” – 81 Km subsea and onshore pipeline
Gas Supplier: Nigerian AGIP Oil Company (NAOC)
Project Gas Transmission Pipeline (GTS-2)
Consist of 40” – 80 Km subsea and onshore pipeline
Gas Supplier: Shell Petroleum Development Co. (SPDC)
Project Slug Catcher/Pig Receiver Project (GTS-2/4)
Consist of two Slug Catcher Plants and Receiver and crossover lines to existing plants.
Gas Supplier: Shell Petroleum Development Co. (SPDC)
Contractor – Aker Kvaerner
Project Gas Transmission Pipeline (GTS-5)
Consist of 24” – 120 Km subsea and onshore pipeline.
Gas Supplier: Total/Elf Petroleum Nigeria Limited (TOTAL)
Project Onshore Gas Gathering Station (OGGS)
Consist of 32” pipeline, Slug Catcher and Pig Receiver
Gas Supplier: Shell Petroleum Development Co. (SPDC)
Position Piping Engineer
Company M.W. Kellogg-Brown & Root (KBR)
assigned to: Technip/Snamprogetti/Kellogg-Brown & Root/Japan Gas Corp. –JV, TSKJ Nigeria, Limited
Client Nigeria Liquefied Natural Gas (NLNG) Limited
Proj. Mgt. Royal Dutch/Shell Group and Nigeria National Petroleum Company
Duration February 2001 ~ March 2005
Project LNG Plus Project – Train 4 & 5 Air-Cooled (Jun 2003 to Mar 2005)
Project LNG Expansion Project – Train 3 Water Cooled (Feb 2001 to May 2003)
Position Senior Mechanical Engineer
Company Consolidated Contractors International Company (CCIC)
Main Office: Athens, Greece
Duration May 1992 ~ Dec 2000
Project Ruwais Refinery Expansion Project (RRE) (Oct 1998 ~ Dec 2000)
Ruwais, Abu Dhabi, U.A.E.
Abu Dhabi National Oil Co. (ADNOC)
Snamprogetti
Project Shaybah Oil Producing Facilities Project (Aug 1997 ~ Sept 1998)
Shaybah, Kingdom of Saudi Arabia
Saudi Arabian Oil Company (ARAMCO)
Bechtel, London
Project Equate Ethylene Plant Project (EEP) (Feb 1996 ~ Jul 1997)
State of Kuwait
Equate Petrochemical Industries
Brown & Root International
Project Onshore Gas Development Project (OGD 1) (Apr 1994 ~ Dec 1995)
Habshan, Abu Dhabi, U.A.E.
Abu Dhabi National Oil Co. (ADNOC)
Bechtel/Technip/Pritchard/CCIC Joint Venture
Project Liquefied Natural Gas Project (LNG Train – 3) (Jul 1993 ~ Apr 1994)
Das Island, Abu Dhabi, U.A.E.
Abu Dhabi Gas Liquefaction Co. (ADGAS)
Chiyoda Corporation Ltd.
Project Petrokemya Olefins Plant (May 1992 ~ Jun 1993)
Jubail, Kingdom of Saudi Arabia
Petrokemya Saudi Arabia
Mitsui Engineering and Ship Building Co., Japan (MESAR)
Position Operations and Maintenance Engineer
Company Safari Company, Ltd.
Jeddah, Kingdom of Saudi Arabia
Client Saudi Arabian National Guard
Duration February 1989 ~ March 1992
Position Project Engineer
Company National Steel Corporation, Philippines (NSC)
Main Office: Makati City, Philippines
Plant: Iligan City, Philippines
Duration February 1985 ~ February 1989
Project 2-Stand Tandem Temper Steel Mill (Mar 1987 - Feb 1989)
Blaw-Knox Mill Machineries, USA
Project 4-Stand Tandem Cold Rolling Stl Mill –Upgrading (Mar 1987-Dec 1987)
In-House
Project Five-Stand Tandem Cold Rolling Steel Mill (Feb 1985 ~ Mar 1987)
Blaw-Knox Mill Machineries/General Electric
Position Mechanical Engineer/Drafting Specialist
Company Japan Oil Engineering, Ltd. (JOE)
Assigned to: Arabian Oil Company, Ltd. (AOC)
Facilities Maintenance Department (Onshore/Offshore)
Ras Al-Khafji, Kingdom of Saudi Arabia
Duration June 1983 ~ October 1984
Position Jr. Project Engineer
Company Metropolitan Waterworks and Sewerage System (MWSS)
Quezon City, Philippines
Contractor Camp Dresser and McKee/Jacobs Engineering - Pittsburgh, U.S.A.
Duration June 1982 ~ June 1983
Project La Mesa Water Treatment Plant Project (LP-1 & 2)
Novaliches, Quezon City, Philippines
|
Comments/ Hobbies/ Interests etc: |
| Board games, watching TV, listening to Music, Solving puzzles |
Last Updated on 10-Aug-10
|