| Ref # |  | JS150502 |
| Year of birth |  | 1955 |
Permanent/Home Location/Address |
| City or Town |  | Cecina |
| State |  | 57023 |
| Country |  | ITALY |
Current Location/Address |
| Country |  | ITALY |
Languages |
| Primary Language |  | Fluency |
| Italian |  | Read, write and speak fluently |
Nationalities |
| Main Nationality |  | ITALY |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Area Supervisor |  | 30+ |
| Construction Engineer |  | 4 |
| Industry |  | Years Experience |
| Chemical and Fertilizer |  | 25 |
| Oil and Gas |  | 5 |
| Petrochemical - Refinery |  | 4 |
| Pharmaceutical |  | 1 |
Qualifications |
| Highest Qualifications |  | HND/Diploma |
| Qualification | Subject | Establishment/Country | Year |
| HND/Diploma | industrial chemestry | Italy | 1976 |
|
Computer Skills and Software Used |
| windows XP |
Work Locations |
| Are you willing to move or relocate? | Countries NOT Willing To Work In! |
| Yes - I will travel internationally | - Africa
- South America
AUSTRALIA
|
Availability |
| Earliest Start Date |  | 02/06/ |
Ideal Next Job |
| i can work as supervisor on precommissioning,commissioning,start-up,production, advisor,& supervisor construction furnace |
Required Salary & Conditions |
| minimum salary 6000 euro cleaned from tax |
Employment History |
| Total Years of Work Experience: |  | 40 |
| Commenced Full Time Work: |  | 1972 |
| Job Title: |  | Supervisor |
Work Experience |
APPLICATION FOR THE POSITION OF: PROCESS SUPERVISOR OR EQUIVALENT
1. FAMILY NAME: MEZZANOTTE
2. FIRST NAME: EMANUELE
3.
4.
5.
6.
7. E- MAIL: CITIZENSHIP: Italian
8. CIVIL STATUS: Married with two sons
9. EDUCATION:
Degree(s) or diploma(s) obtained: DIPLOMA IN INDUSTRIAL CHEMISTRY
11. LANGUAGE SKILLS:
Language Reading Speaking Writing
Italian mother languge
English good good sufficient
Spanish sufficient n.a. n.a.
Last monthly salary :6000 euro cleaned from Italian tax
I’m available for supervisor on Precommissioning Commissioning Start-up and furnace construction
PROFESSIONAL EXPERIENCE RECORD:
Date: from 12/07/09 to: 30/09/2010
Location: Darquein - Iran
Company: ENI
Position: DCS SUPERVISOR
Description: DCS SUPERVISOR & COORDINATOR between Oil & Gas DCS operators about oil plant and reinjection gas compressor.
Date: from 13/10/08 to: 08/04/2009
Location: Taranto -Italy
Company: SNAMPROGETTI SUD
Position: SUPERVISOR PRECOMMISSIONING
Description: Supervisor of precommissioning on HYDROCREKER PROJECT
and integration with RHU unit.( receiving hidro-conversion unit)
Date: from 04/06/08 to: 14/07/08
Location: Kuwait-Shuayba
Company: TECNIMONT
Position: SUPERVISOR PRECOMMISSIONING
Description: Supervisor of precommissioning on AROMATICS PROJECT
Date: from 23/07/07 to: 31/03/2008
Location: Sannazzaro Italy
Company: SNAMPROGETTI -ENI S.p.a R&M
Position: EXPERT SUPERVISOR CONSTRUCTION of FURNACES PACKAGE
Description: Supervisor of construction of furnace package ( three furnaces)
on "HYDROCRACKER" plant
Date: from 20/02/07 to: 19/06/2007
Location: Priolo Italy
Company: SNAMPROGETTI SUD-POLIMERI EUROPA
Position: PRECOMMISSIONING SUPERVISOR on REVAMPING of PLANT
"AROMATICS"
Description: Supervisor of precommissioning of sulfur remover plant from gasoline
Date: from 12/03/05 to: 20/12/2006
Location: Assaluyeh Iran
Company: ELETTRAENERGIA – ENI IRAN BV
Position: RECEIVING FACILITIES ,CONDENSATE STABILIZATION
SUPERVISOR & ADVISOR FROM 01/03/2006
Description: Supervisor onshore of receiving facilities,condensate stabilization
gas plant South Pars Operation Phase 4&5
Date: from 20/09/04 to: 19/01/05
Location: SANNAZZARO DE’ BURGONDI- ITALY
Company: SNAMPROGETTI SUD- AGIP OIL REFINERY
Position: PRECOMMISSIONING SUPERVISOR
Description: Supervisor of precommissioning of CD HDS project
( sulphur remover plant from gasoline )
Date: from 01/04/04 to: 31/08/04
Location: MILAZZO - ITALY
Company: HEURTEY – TECHINT – RM MILAZZO
Position: VENDOR ENGINEER SUPERVISOR & COSTRUCTION S.V.
Description: Supervisor of engineer project & construction of a new furnace in sulphur remover plant from gasoline
Date: from 01/03/04 to: 31/03/04
Location: TARANTO - ITALY
Company: HEURTEY -TECHINT- AGIP TARANTO
Position: VENDOR ENGINEER SUPERVISOR
Description: Supervisor of revamping of furnace engineer project, pipe-line included.
Date: from 03/09/03 to: 31/01/04
Location: TRECATE – ITALY
Company: HEURTEY – ESSECO
Position: ENGINEER SUPERVISOR
Description: Supervisor of furnace engineer project, pipe-line included.
The burner for the combustion of sulphur previously mentioned is also used as steam generator of a turbine engine and a generating electric.
New experiences in “construction” field and “construction” team manager.
Date: from : 07/02 to: 06/03
Location: DUKHAN – QATAR
Company: SNAMPROGETTI / QATAR PETROLEUM
Position: SENIOR ENGINEER
Description: Onshore oil field being equipped of a new gas lift compression station, upgrade and substitution of part of the existing facilities.
Precommissioning, commissioning and start-up:
- oil stabilization with heater skid
- gas gathering and compression(Solar Turbine & NuovoPignone)
- gas dehydration with glycol
- compression and reinjection of high pressure gas to oil wells
Date: from: 04/01 to: 12/01
Location: OBIAFU / OBRIKOM – NIGERIA
Company: COMERINT / AGIP
Position: PRODUCTION SUPERVISOR
Description: Control of stabilized crude oil production from field wells.
Degassing station, oil stabilization, gas dehydration
Date: from: 05/99 to: 04/01
Location: SARROCH (CAGLIARI) – ITALY
Company: COGES / SNAMPROGETTI
Position: PROCESS UNIT SUPERVISOR I.G.C.C.
Description: Power station powered by syngas generated from partial combustion of tar in oxygen environment.
Precommissioning, commissioning, start up of :
- tar gasification unit (Texaco)
- ashes and water treatment
- sulphur removal (UOP)
- sulphur recovery (Lurgi)
- hydrogen purification (PSA)(UOP)
- hydrogen compression (GHH & Nuovo Pignone)
Date: from: 02/87 to: 04/99
Location: VOLTERRA – ITALY
Company: SAMATEC – SALINE DI VOLTERRA
Position: SHIFT SUPERINTENDENT
Date: from: 08/85 to: 02/87
Location: RAVENNA – ITALY
Company: ENICHEM SYNTESIS/TECNIMP
Position: SHIFT SUPERINTENDENT DI-PHENOL PLANT
Description: Commissioning, start up of:
- peroxide-phenol reaction
- high boiling distillation
- crystallization
Date: from: 02/78 to: 08/85
Location: RAVENNA – ITALY
Company: ENICHEM / SNAMPROGETTI
Position: SHIFT SUPERVISOR
Description: Responsible for production of catalyst for Poliisoprene rubber
0 - hydrogenation
- concentration
- distillation.
Date: from: 02/76 to: 01/78
Location: RAVENNA – ITALY
Company: ENICHEM
Position: PANEL OPERATOR
Description: Production of Vinyl Chloride
- reaction gas + gas
- distillation
- compression
Date: from: 02/74 to: 02/76
Location: RAVENNA – ITALY
Company: ANIC – ENI
Position: PANEL OPERATOR
Description: Production of catalyst for production of S.B.R. rubber and sodium chemical.
Date: from: 11/72 to: 01/74
Location: RAVENNA – ITALY
Company: ENICHEM
Position: LABORATORY RESPONSIBLE
Description: Chemical analyst in poliisoprene plant
|