}
CV Commissioning C&I Engineer Instrumentation Engineer Senior Control System Engineer from JORDAN (JS14929) - Engineering Jobs - Expat Engineer
 
 

CV Commissioning C&I Engineer Instrumentation Engineer Senior Control System Engineer from JORDAN (JS14929)

 
 
Ref #JS14929
Year of birth1972

Current Location/Address
City or TownAmman
CountryJORDAN

Permanent/Home Location/Address
City or TownAmman
CountryJORDAN

Languages
Primary LanguageFluency
ArabicRead, write and speak fluently

Nationalities
NationalityJORDAN

Experience Classification
Job FunctionYears Experience
Commissioning1
C&I Engineer4
Instrumentation Engineer4
IndustryYears Experience
Oil and Gas6
Engineering1
Consulting Engineer2

Qualifications
Highest QualificationsMasters
QualificationSubject Establishment/Country Year
Masters or HigherMSc Control of electric machine (I&C Engineer) Ukraine1998

Other Qualifications, Memberships, Certification

President – Membership of PMI (project management Institute).
President –Jordan Engineer Association.




Computer Skills and Software Used
Windows
Dos
Excel
Word
Internet Skills

Work Locations
Are you willing to move or relocate? Countries NOT Willing To Work In!
Yes - I will travel domestically
Yes - I will relocate domestically
Yes - I will travel internationally
Yes - I will relocate internationally
IRAQ
AFGHANISTAN



Availability
Start Immediately? Available Now

Ideal Next Job
any

Required Salary & Conditions
not less than 4000$

Employment History
Total Years of Work Experience: 14
Commenced Full Time Work: 1998
Job Title:Senior Control System Engineer
DurationFrom : 2008 To: 2009

Summary
Ø Instrument & Control Systems Engineer with over 10 years experience in the field of inspection, installation, testing, construction and commissioning of major International projects for builds of petrochemical, oil and gas process plants. This Includes LNG, Refineries, Gas Oil Separation, Full Field Development, Ethylene, Olefin, and Offsite and Utilities for Onshore Oil and Gas plants, Professional experience includes conceptual design, front end design, detailed engineering, and Project management consultancy, including construction and commissioning of oil and gas projects Worldwide, I always a problem solver, stretches thinking.

Work Experience
Professional Experience

§ General Electric Company USA (GE)
§ Period: 18/02/2008 – 25/12/2009
§ Title: Senior Control System Engineer (commissioning)
§ Value: 3 billion USD
§ Project: Marafiq (Saudi)



My Responsibility includes: commissioning a net output of more than 2,740 megawatts of power generation, with steam production of 800,000 m3/day for desalinated water production, The primary fuel used will be natural gas, with distillate oil as a backup.


Professional commissioning achieves the following goals:
§ I Reduced start up delays and rework. To reduce system complexity, decrease start-up problems and allow for commissioning in less time.
§ Tighter integration of plant control allows for operational improvements.
§ Follow up Personnel safety for all workers.
§ I was insure that Enhances operator productivity and operational awareness through access to a common interface of all equipment, operator screens, process data, trend data, alarms and events.
§ I Assurance of function and performance.


§ Project: Rabigh Olefin Plant-Saudi
§ Company: Consolidated Contractors Company (CCC)
§ Period: 23/05/2007 – 01/11/2007
§ Value: US $ 500 Million.
§ Title: Senior Instrument Engineer

§ Following several area or units of major construction projects. Monitoring all phase of field construction Consultancy bases, as it is a green field site petrochemical project, following up all instrument work in Ethan product as senior engineer according to project specifications and international standards.

§ Responsible for executing the work in a timely manor, in accordance with design and schedule requirements.
§ Involvement and participation technical Specifications to API for the control systems (DCS, ESD, F&G and SCADA).
§ Acted as a Lead Engineer for the management and co-ordination of all instrumentation And control systems for DCS, ESD (TMR), F&G and Field Instruments related to Cracker Ethane Unit and Licensed Process units.



§ Project: North East BAB (NEB) Phase 1 Development UAE.

§ Company: VECO ENGINEERING
§ Period: 25/11/2004-01/01/2007
§ Value: US $ 700 Million.
§ Title: Senior Instrument Engineer.

§ Following the main contractor (Technip), The project is a grass root field development project to produce 110,000 barrel per day. The project also includes facilities for water injection, high-pressure gas injection as well as WAG, Desultory system, Zero flaring.
§ Involvement and participation in Covers two parallel Gas & Oil trains construction, pre–commissioning, commissioning and hand over process to Operations. The involvement also included troubleshooting, diagnosing faults with complete shut down for the plant to repair emergency diesel generator, instrument air compressor, Gas compressor low, medium & high pressure & trends and recommending corrective actions, start-up.
§ Time and manpower management by monitoring all activities, which are carried out in accordance to HSE policies and regulations with the best work practices.
§ Involvement in HSE reviews (HAZOP, PHSER, Risk Assessment, etc).

§ Project: Lajjoun Wells Water Supply Project, Stage (III & IV) – Jordan.

§ Company: Consolidated Contractors Company (CCC) (Construction Management Division).
§ Period: 01.12.2001 – 01.07.2004.
§ Value: US $ 30 Million.
§ Title: E&I Engineer
§ Project Type: Fast Track


Design Phase:
§ Reviewing Instrument drawings produced by the Design consultant and recommending changes to improve systems efficiency and performance in a quality and cost effective manner.
§ Advising Planning Engineer concerning Instrument activities in Construction Project Management (CPM) schedules.
§ Preparing documents for tendering for Construction Contractors.
§ Technical evaluation of Construction Contractors. This includes evaluating professional engineers and evaluating contractor’s capabilities to handle the job.
§ Assisting PM in preparing engineering packages for Instrument contractor.
§ Site surveys on Instrument requirements.

Procurement Phase:
§ Review material requisition for Instrument equipment and devices.
§ Order material based on approved vendor list and martial requisition list.
§ Follow-up material delivery from vendors.

Construction Phase:
§ Participating in progress measurement meetings with the Project Team and E&I contractors. Preparing weekly & monthly report for the Client.
§ Site inspections and reporting to Client on Contractor’s progress.
§ Involvement and participation in construction, pre–commissioning, commissioning and hand over process to Client. The involvement also included troubleshooting, diagnosing faults & trends and recommending corrective actions.
§ Reviewing contractor's change order proposals.
§ Review contractor's claims.

§ Project: Maqta-Jebel Ali Gas Pipeline Project- U.A.E.
§ Company: Consolidated Contractors International Company (CCIC)
§ Period: 15.02.2001 – 15.05.2001
§ Title: Instrument Inspector QA/QC.
Responsibilities include:
§ Deals with reviewing of all ITP's/QCP/Method Statement/ Material Approval prior for project plan preparation.
§ Maqta Gas station upgrading, new Valve stations, new Jebel Ali station, 48 inches pipeline.
§ Coordinating with Construction Supervisor project plan drawing review-having AFC drawing officially approved documentation.
§ Represent Company during weekly meeting concerning schedule plan activity and project plan on all tools and equipment needed for construction. Coordinating with the counterpart on the consultant & Client side relating to E&I technical matters that needs participation as and when is required.

§ Project: OGD-2 Gas Gathering System & Trunk Lines Project- U.A.E.
§ Company: Consolidated Contractors International Company (CCIC)
§ Period: 05.02.2000 – 15.02.2001.
§ Value: US $ 150 Million.
§ Title: Instrument Engineer.
Responsibilities include:
§ Follow up all site work for instruments construction installation and pre-Commission.
§ Coordinating with my senior engineer & consultant relating to instrument technical matters to reach to best solution in any problem we face in site.
§ Lead successful investigations for Instrument drawing modifications so the company achieving annual saving 100 thousand $.
§ Ensured instrument equipment works complied with project specifications, company procedures, method statements and quality assurance and controls documentation.

§ Project: Ruwais Refinery Expansion Project -U.A.E.
§ Company: Consolidated Contractors International Company (CCIC)
§ Period: 02.04.1999 – 01.01.2000.
§ Title: Instrument Engineer.


§ Responsibilities included:

§ Follow up all site work for Electrical & instruments construction installation at.
§ Covers the construction of two parallel trains for the distillation of condensate from Onshore Gas Development and Asab Gas Development Projects.
§ The total plant capacity after expansion 280,000 barrels/day of condensate processing with associated downstream facilities such as naphtha stabilization, kerosene sweetening, and offsite facilities, including an additional tank farm comprising 23 large tanks.
§ Follow up all required materials at site by studying the Drawings & site to do my duties, as it required along with company (TAKREER) specification & standard but in safe manner.

Comments/ Hobbies/ Interests etc:
Swimming
Riding horses
Reading

Last Updated on 07-Aug-11


-- End of CV/Resume --


Full CV/Resume available to paid companies/recruiters as an attachment

If you would like to contact this person, you will need to purchase
access to our CV/Resume database.

Please contact our sales department for pricing

sales@expatjob.net



www.expatengineer.net | Engineering Jobs | Site Map