| Ref # |  | JS133533 |
| Year of birth |  | 1960 |
Current Location/Address |
| City or Town |  | METRO MANILA, NATIONAL CAPITAL REGION |
| State |  | 1621 |
| Country |  | PHILIPPINES |
Permanent/Home Location/Address |
| City or Town |  | METRO MANILA |
| Country |  | PHILIPPINES |
Languages |
| Primary Language |  | Fluency |
| Tagalog |  | Read, write and speak fluently |
Nationalities |
| Nationality |  | PHILIPPINES |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Area Supervisor |  | 5 |
|  | |
|  | |
|  | |
|  | |
| Industry |  | Years Experience |
| Oil and Gas |  | 10 |
|  | |
|  | |
|  | |
|  | |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | Bachelor of Science in Electrical Engineering | FEATI UNIVERSITY, PHILIPPINES | 1985 |
| Trade Qualifications | INDUSTRIAL PROCESS CONTROLS/ INSTRUMENTATION | MERALCO FOUNDATION INSTITUTE, PHILIPPINES | 2002 |
Other Qualifications, Memberships, Certification
IEEE MEMBER |
Computer Skills and Software Used |
| MS OFFICE EXCEL,WORD |
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will travel internationally
Yes - I will relocate internationally |  |
Availability |
| Start Immediately? |  | Available Now |
Ideal Next Job |
| Looking for work in the field of Electrical or Instrumentation in the Oil and Gas Industry from construction up to Pre-commissioning and Commissioning stages of the project! |
Required Salary & Conditions |
| SALARY NEGOTIABLE |
Employment History |
| Total Years of Work Experience: |  | 25 |
| Commenced Full Time Work: |  | 1987 |
| Job Title: |  | Electrical Engineer/Asst Superintendent |
| Duration |  | From : 2008 To: 2009 |
Summary |
• Fifteen (15) years of technical experience in various skills in the field of electrical and instrumentation on Oil and Gas Plant Projects, Petrochemical, Desalination and Power Plant Projects. Exposure in EPCM Projects, Quality Assurance and Quality Control Inspection including Turn Over System and Tracking Records (TOSTR), Take Over XP, Pro Arc Data Base, CMS System, Permit to Work System, construction supervision, Pre-Commissioning and Commissioning activities.
• Good technical knowledge of engineering, applicable industry codes and standards (British Standards ,NEC, IEC), typical Mechanical Completion / Pre-Commissioning, Commissioning Procedures and good operational practices.
• Having skills on Electrical HV Substations and LV installations plus testing of HV distribution transformers, switchgears, switchboards, Motor Control Centres from construction stage up to Mechanical Completion including Pre-Commissioning activities and Start-Up. With hands on experience on ABB, Siemens, Schneider Electric HV and LV switchgears including High Pot Test, Current Injection Tests and applicable safe testing procedures.
• Permit to Work System, Generate Hot Work and Cold Work Permits and its requirements concerning Safety. Perform Lock Out/ Tag Out procedures required during Pre-commissioning and Commissioning stages of the project. Conduct Safety Task Analysis before conducting any testing and commissioning activities of any electrical equipments and apparatus prior to putting it in service.
• With skills on DCS, ESD, Fire and Gas System including Loop Checks. Field Instruments installation and Calibration
|
Work Experience |
Technip France ( April 2008 to April 2009 )
Ras Laffan Olefin Project /
Qatar Chemical Co. Ltd.
Ras Laffan, State of Qatar
Electrical Area Supervisor/ Asst. Superintendent
Parsons/Fluor Daniel Joint Venture ( March 2006 to March 2008 )
Second Generation Project/Sour Gas Injection Project
Tengiz Chevron Oil (TCO)
Tengiz, Republic of Kazakhstan
Person in Charge / Lead Electrical Permit to Work
Specialist
Technip Italy-(TPIT) (October 2004 to February 2006)
ORYX- Gas to Liquid Plant Project
Qatar Petroleum/ Sasol
Ras Laffan Industrial City,
State of Qatar
Electrical Supervisor/ Pre-Commissioning Electrical
Japan Gas Corporation/Kellogg Brown and Root (March 2003 to December 2003)
BP-In Salah Gas Plant Project
Hassi R’ Mel, Algeria
Electrical Supervisor/ Pre-Commissioning Electrical
Dresser Kellogg Energy Services (DKES) (February 2001 to November 2001)
Obigbo Node Associated Gas Gathering Project
(Shell Petroleum and Development Corporation)
Km.16 Aba Expressway, Port Harcourt, Nigeria
Electrical & Instrumentation Inspector (QA/QC)
Shinryo Philippines/ Tangent Power Corporation (August 1994 to January 2001)
(Electro/Mechanical Contractor)
5th Floor One Corporate Plaza
Arnaiz Street, Makati City Philippines
Electrical Engineer/ Project Engineer
Saudi Arabia Ministry of Health (September 1992 to April 1994)
Shehar Psychiatric Hospital Project
Taif, Kingdom of Saudi Arabia
Electrical Engineer/ Project Engineer
Saline Water Conversion Corporation (April 1991 to August 1992)
Haql, Desalination and Power Plant Project
Haql, Tabuk, Kingdom of Saudi Arabia
Electrical Engineer/ Project Engineer
Saline Water Conversion Corporation (June 1989 to April 1991)
Duba Desalination and Power Plant Project
Duba, Kingdom of Saudi Arabia
Electrical Engineer/ Project Engineer
Saline Water Conversion Corporation (May 1987 to June 1989)
Assir Desalination and Power Plant Project
Ash Shaquiq, Gizan,
Kingdom of Saudi Arabia
Electrical Engineer/ Project Engineer
|
 |  |  |
 |  |  |
 |  |  |