| |
|
| Ref # |  | JS12049 |
| Year of birth |  | 1957 |
Current Location/Address |
| City or Town |  | MULTAN |
| Country |  | SAUDI ARABIA |
Permanent/Home Location/Address |
| City or Town |  | AL-JUBAIL |
| Country |  | SAUDI ARABIA |
Languages |
| Primary Language |  | Fluency |
| Urdu |  | Read, write and speak fluently |
Nationalities |
| Nationality |  | PAKISTAN |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Instrumentation Engineer |  | 5 |
| Area Superintendent |  | 2 |
| Construction Superintendent |  | 2 |
| Construction Engineer |  | 6 |
| Commissioning |  | 6 |
| Industry |  | Years Experience |
| Oil and Gas |  | 7 |
| Engineering |  | 2 |
| Consulting Engineer |  | 2 |
| Petrochemical - Refinery |  | 5 |
| Water |  | 5 |
Qualifications |
| Highest Qualifications |  | Masters |
| Qualification | Subject | Establishment/Country | Year |
| Masters or Higher | ELECTRONICS | PAKISTAN | 1985 |
| Degree | ELECTRONICS | PAKISTAN | 1978 |
| HND/Diploma | SCIENCE | PAKISTAN | 1975 |
| HNC/ONC/Certificate | SCIENCE | PAKISTAN | 1973 |
Other Qualifications, Memberships, Certification
PLC-TRAINING FROM SIEMENS JEDDAH
DCS YOKOGAWA CS 3000 FROM YOKOGAWAYUNBU
PDMS - JUBAIL SAUDI ARABIA
Prosafe RS By Yokogawa Jubail saudi Arab. |
Computer Skills and Software Used |
MS OFFICE
MS PROJECT
PRIMAVERA
INtool. |
Work Locations |
| Are you willing to move or relocate? | Countries NOT Willing To Work In! |
Yes - I will travel domestically
Yes - I will relocate domestically
Yes - I will travel internationally
Yes - I will relocate internationally | - North America
|
Availability |
| Earliest Start Date |  | Given 4 weeks notice |
Ideal Next Job |
| , I have twenty three years of experience in Project Management, Construction, Engineering and Maintenance in Oil and Gas, Refinery and Petrochemical Industry, I have worked in UAE, Qatar and Saudi Arab on different Projects. Presently I am working in Saudi Arab with Saudi Aramco Shell Refinery. I hope my qualification & multi discipline experience fully meet your requirement. |
Required Salary & Conditions |
| 9,000 / Month US Dollars Plus family status + company Car. |
Employment History |
| Total Years of Work Experience: |  | 24 |
| Commenced Full Time Work: |  | 1988 |
| Job Title: |  | Project Engineer Instrument |
| Duration |  | From : 2008 To: 2011 |
Summary |
SAUDI ARAMCO SHELL REFINERY, JUBIAL , SAUDI ARAB(Sasref)
Position: - Sr. Engineer (Projects)
From: Oct 2008 to Date
NATIONAL PERTROCHEMICAL INDUSTRIALIZATION COMPANY (NPIC) SAUDI Position: Sr. Project Engineer (Instrument & Control) From August 2005 to Dec 2008
YUNBU NATIONAL INDUSTRIAL GAS COMPANY (Phase -2 Project)
EMPLOYER: PARSONS E & C / AIR PRODUCTS UK
POSITION: Superintendent Instrument
FROM: JAN-2005 TO AUGUST 2005.
Employer: KSB Fluid System GmbH
Position: Project Engineer (E&I)
From Jan 2002 to Date Jan 2005
Saline Water Conversion Corporation Rehabilitation Project
(Al-Jubail)
Employer: Saudi Services for Electro-Mechanical Works Ltd (SSEM)
Rupali Polyester Ltd, Lahore, Pakistan
Position: Deputy Manager (E & I)
From: May 1993 to Dec 1997
Abu Dhabi National Oil Company (ADNOC) Um Al-Nar Refinery and Gas Sweetening project
Employer: WESCON International B.V (Abu-Dhabi U.A.E)
Position: Instrument Engineer
From: June1992 to Feb1993
Qatar General Petroleum Corporation (QGPC) Gas Sweetening Project
Employer: (CCC) Consolidated Contracting International Co. Doha, Qatar
Attock Refinery Ltd. Rawalpindi, Pakistan
Position: Instrument Engineer (Maintenance)
From: March 1988 to Oct 1991
|
Work Experience |
Career Objective:
• Seeking a Challenging position where I can utilize my twenty three years of experience in Engineering, Designing, Project management, Construction, and Maintenance in Refinery, Oil & Gas, Petrochemical, Fertilizer, Water and Power sectors, Airport projects etc.
Present Status:-
• Presently I am working here in Saudi Aramco Shell Refinery (Sasref) in Engineering Department. Where involved in engineering, designing, Project Management for plant expansions, modification and up grade for Instrument & Control system.
Synopsis:
Engineering & Designing:-
• To perform basic designing and engineering as per design change request raised by operation and instrument maintenance department as per Tasnee standards & Procedures. To work on medium size Project for upgrade and expansions.
• To make feasibility study, Preliminary process safety review, to conduct the HAZOP Session, SIF & SIL as per IEC 61508 & 61511. Safety level determination meetings in coordination with HSHE as per OSHA 1910, Operation & Technical department. HAZOP session to implement the changes in the design and getting technical feedback from technical and operation department by conducting joint session.
• To perform the detailed Engineering after getting design approval from the respective department. to draw layout drawings, isometric drawings, hook up drawings ,P & ID drawings or to modify the existing P & ID, instrument loop drawings (ILDs )and wiring diagrams, PLCs and DCS wiring ,marshaling and JB interconnection drawings, Cable routings, Cable Plan & Schedule & cable tray routings .etc.
• To perform the Engineering and designing by using the available software INtool, PDMS, Flow Calc and other software by the help CAD personnel and department draftsmen.
• To attend the HAZOP Study, process safety review and SIL determination Joint sessions to ensure the SIF.
• To select, finalize & review the material as per approved design. To raise the PR for material and finalizing the contractor for execution. The material review & delivery schedule related to Instrumentation & control Submitted by the EPC Contractors.
• To make the ITB and IFC package and contractor scope of work.
• To finalize the package by determination of Engineering, material and contractor cost as per approves Budget.
• Involved in detail Engineering and designing and design review for SCADA, DCS,ESD ,PLCs, F&G system , analyzer ,telecommunication system and selection of metering system. Control Valves of different venders’ e.g. CCI, Metso, Neles Jamesbury, Valtek, Fisher, Masoneilan, Coriolis Mass Flow Meters (Micro Motion)Emerson, E & H , Field transmitters Yokogawa, Rosemount(Emerson),Honeywell,, Metering stations, Analyzer shelters, Fire Alarm system, Industrial security and safety division for installation of security fence, CCTV Cameras, Intrusion detectors, FOIDS, security flood light, etc
• As in our organization Project Engineer responsible for engineering, designing and construction supervision up to completion so being Project Engineer Having sufficient experience in the design, procurement, construction, site management and commissioning of major instrumentation and control retrofit or upgrade projects.
• Reviews existing drawings, Standards, Specifications, and recommends appropriate changes. Reviews instrument and control logic & design prepared by vendors/consultants and contractors for existing or new projects.
• To analyze the contractor’s competency compliance to contractual requirement in Project design engineering.
• Evaluates (DCR) Design change request for modifications and de-bottlenecking or MOC request. Provide technical support to the Tender and Technical Committees of various projects for functional area of work.
• To prepare the instrument scope of work and required CAPEX and after ward sending for board approval for different modifications and projects.
• To attend meeting to trouble shoot and investigate complex problem by PHA, HAZOP, RCA, Fish bone analysis in co-ordination with operation, technical and LCS Departments.
• To prepare and execute the contracting strategy, technical evaluation and implement the proposed recommendation of various design contracts and liaise with other departments on overall implementation.
• To make co-ordination & provide feedback on issues between company’s internal department, contractor and venders to meet overall project objective on cost, quality, schedule and safety.
• To develop the project cost estimate, prepare and review specific project budget for approval and assist rightful claims and variations orders for change in works, involving addition and deletion of scope and actual work requirement.
• To attend FAT and SAT and Function & logic test for Yokogawa CS 3000, Honeywell TDC 3000, and Triconex ESD system, Honeywell PESS (ESD), Bentley Nevada 3500.Package system. Etc
• Involved in review & coordinate review by others and acceptance of final Turn over documents documentation.
Project Management:-
• To supervise the day to day project activities to ensure that the assigned project meet their objective & milestone.
• The follow up with project planning to ensure the project strategy.
• To define the objectives, execution strategy, work break down, contracting strategy as per project goals & completion strategy.
• To attend the co-ordination and progress meeting with PMT including Engineers and contractors. Make liaison to have close co-operation of different companies & contractors.
• To supervise & direct the project implementation for verification of bidders who participate in tendering as per scope of work, call for tendering documents consisting of terms of reference, scope, special terms and conditions .payment terms and project master schedule.
• To make co-ordinate between different companies for mobilization & demobilization as per project schedule.
• To control and manage the negotiation and dealings with external engineering consultant & companies to ensure and meet the all technical and commercial requirement.
• To control and monitor the progress and construction activities.
• To ensure the all project awarded as per time schedule and executed on time with agreed quality and cost.
• To give presentation to the Management to show the progress as per project schedule, quality plan, HSE policy & project cost.
• Monitoring the cost and financial expenditures propose and review the changes in order to optimize the cost.
• To prepare project change, variation order and obtain the necessary approval.
• To ensure the necessary arrangement are done to hand over the project site after completion.
• Work out clear strategy for the project covering responsibilities related to construction, pre-commissioning, commissioning, and start up and performance test.
• To ensure the contractors are following the agreed HSE company policy & understand the company’s requirement to commence the job safely Participate in project related HSE meeting & to control monitor project safe man-hours over all & from different contractors. To attend the safety walk to see the quality of onsite safety.
• To Visit the construction site everyday to inspect progress and quality of work in accordance with design and schedule.
• To track the project schedule & material shipment schedule.
• To track the release of payments as per actual work.
• Controls contractor’s performance by verifying daily progress.
• Examines work schedules, manpower/equipment/materials input plans, organization charts, key personnel lists, and other technical documents, and examines them to secure contractor’s readiness and compliance with technical requirements.
• To make Monthly .weekly and daily meetings to have co-ordination between different companies and discipline
• To keep the co-ordination with QC/QC Engineer, to implement the quality plan.
• To supervise the construction activities in association with main EPC contractor.
• Examines work schedules, manpower/equipment/materials input organization charts, key personnel lists, and other technical documents, and examines them to secure contractor’s readiness and compliance with technical requirements
• Taken lead role in Company witness and coordination of different disciplines. Monitors the Sub-Contractor’s work to ensure that project technical requirements are satisfied as per project specifications in co- ordination with EPC contractor.
• Provides input to reviews of Contractor engineering queries.
• To arrange the safety orientation for contractor new staff.
• To co-ordinate with the different contractors to give access to utilities like water ,electricity ,ambulance in case of emergency in case of heat stress or any injury.
• Verifies completion of work as specified in original or modified designs and report to PM.
• Assistance for verification of Contractor’s claimed progress for payment application purposes (invoice evaluation) as per actual progress.
• Follows up the completed project during warranty period for any defect or trouble reported by end users.
Education: M Sc (Electronics) from Bahauddin Zakariya University Multan,
Training Courses:
• Basic training of SAP (Enterprise Resource Planning), on Plant maintenance module.
• Primavera P3 planning software
• Certification in HAZOP study training conducted by Al Bayan International
• Certification in Internal auditor’s course by DNV.
• Attended one week training on Fiber Optic related to use OTDR & Cable Splicing theoretical & practical training arranged by KSB Germany.
• Attended a short course in Instrumentation and digital control from Petroman Lahore.
• NFC Technical Training Center Multan Pakistan in Instrumentation & Process Control (National Fertilizer Corporation Institute).
• Two week training on PDMS project design and management system, A software capable of designing 3D piping ,structure cane cable tray routing
• Obtained one-week training in Instrument designing software INtool (Smart Plant instrumentation) management development training Program for “Senior Executives” .from Petroman Lahore.
• Attended two week Management development program arranged by training centre of Attock Refinery Ltd Rawalpindi
Computer Courses:-
Primavera P3, MS project, SAP, INtool Designing software, PDMS Software for project design, Certification in internal quality auditors by DNV as per quality ISO9000.
|
 |  |  |
 |  |  |
 |  |  |
Last Updated on 11-Dec-11
-- End of CV/Resume --
Full CV/Resume available to paid companies/recruiters as an attachment
|