}
CV Business Development Engineering Manager Project Management Scientist Project Controls Manager Manager from ALGERIA (JS116822) - Engineering Jobs - Expat Engineer
 
 

CV Business Development Engineering Manager Project Management Scientist Project Controls Manager Manager from ALGERIA (JS116822)

 
 
Ref #JS116822
Year of birth1958

Current Location/Address
City or TownBlida
State Blida
CountryALGERIA

Permanent/Home Location/Address
City or TownBlida
State Blida
CountryALGERIA

Languages
Primary LanguageFluency
FrenchRead, write and speak fluently

Nationalities
NationalityALGERIA

Experience Classification
Job FunctionYears Experience
Business Development10
Engineering Manager11
Project Management15
Scientist10
Project Controls Manager12
IndustryYears Experience
Engineering16
Oil and Gas15
Nuclear8
Water6
Petrochemical - Refinery4

Qualifications
Highest QualificationsMasters
QualificationSubject Establishment/Country Year
Masters or HigherNuclear Engineering National Research Center/ Algeria1988
DegreeBachlor in PhysicsAlgiers University/ ALgeria1981

Other Qualifications, Memberships, Certification

* Certification/diploma, ISO 9001 version 2000 Qualification - Algiers, Algeria
* Certification/diploma, PCS Software Mastering. Project COntrol System- Brown & Root Ltd, London, United Kingdom
* Union of the Algerian Insurers and Re Insurers (UAR)/ Expert for Industrial Facilities Diagnosis
* National Association of Corrosion Engineer (NACE) / Documentation subscriber




Computer Skills and Software Used
* MicroSoft Packages: Excel; Word; Power Point; Access; Outlook
* Primavera Project Planner; Monte Carlo Packages
* Pipe Phase, SIm Science
* Pro II, Sim Science

Work Locations
Are you willing to move or relocate?
Yes - I will travel domestically
Yes - I will travel internationally
Yes - I will relocate internationally

Availability
Start Immediately? Available Now
Earliest Start Date05/05/

Ideal Next Job
Looking for a challenging position in the oil and gas industry as Project Management Team Member in Middle East, Africa or Pacific Asia.
Targeting preferably a mobilization on site on single status basis.

Required Salary & Conditions
Minimum salary USD 10,000 per month plus housing .

Employment History
Total Years of Work Experience: 30
Commenced Full Time Work: 1982
Job Title:Manager
DurationFrom : 1999 To: 2008

Summary
Twenty six years experience in the field of energy technology, project management, computer software development and system modelling and simulating. An efficient management of multi-disciplinary team work, whether technical or human relationship. A good practice of ISO-9001 procedures and their implementation within an organization.
A perfect control of the evaluation and control of EPC projects through the development of detailed project planning, risk analysis and operation follow-up. Mastering business modeling and sensitivity analysis.

Work Experience
January 1999 - October 2008: General Manager CIMET spa
138 ter, Bvd Krim Belkacem, Telemly, Algeria
Company Industry: Engineering
Job Role/Department: Management
Duties : Business Administration ; Business Development Management ; Project Management ; Reporting to the Company Board

 ISO 9001 version 2000 Certification in February 2008.
 Diagnosis of Sewage Networks of Bejaia and Tizi-Ouzou towns. 2008. ($US 3.8 M project). Owner: Ministry of Water Resources
Objectives: Bidding phase for the diagnosis of Bejaia (250,000 inhabitants) and Tizi-Ouzou (180,000 inhabitants) sewage networks. Contract awarded in partnership with Southern Treatment Water (Republic of South Africa) 2008.
Duties: Bidding phase management ; Project execution plan development; Project planning, resource mobilization profile definition ; Budget definition, risk analysis and cash flow forecast
Tools: Windows XP, Excel, Primavera,
Duration : 6 months

 EPC project of 600 capacity m3 aeronautical fuel storage facility, 2007-2008 . ($US 4.3 M project). Air Forces Command
Objectives: Detailed engineering, procurement, construction and start up of 600 m3 capacity of aeronautical fuel storage farm. Project financing with the External Bank of Algeria (BEA).
Duties: Conceptual design coordination and supervision; Project execution plan development; Project planning, resources allocating and mobilization profile definition; Budget definition, risk analysis and cash flow forecast; Project Financing; Detailed engineering and procurement management; Construction inspection and supervision; Client interfacing.
Technical Environment: Windows XP; Excel, Primavera; ADL Pipe, STAAD Pro.
Duration: 12 months

 EPC project of 600 capacity m3 gasoil storage facility, 2007-2008 ($US 1.5 M project). Army Logistics Command
Objectives: Detailed engineering, procurement, construction and start up of the gas oil storage farm. Project financing with the External Bank of Algeria (BEA), 2006-2007 (US$ 2 M project).
Duties: Conceptual design coordination and supervision; Project execution plan development ; Project planning; Budget definition, risk analysis and cash flow forecast ; Bid phase management ; Project Financing; Detailed engineering and procurement management ; Construction inspection and supervision; Detailed project schedule, field activity schedules, labor/ productivity analysis, work progress monitoring ; Monthly progress reporting ; Client interfacing; Closeout
Technical Environment: Windows XP; Excel, Primavera, Monte Carlo; ADL Pipe, STAAD Pro;
Duration: 10 months

 EPC project of 5, 000 m3/day capacity Unit for oily water treatment at El Borma ( Hassi Messaoud) 2005-2007. ($US 12.4 M project). SONATRACH
Objectives: Detailed engineering, procurement, construction and start up of 5,000 m3/day capacity unit for oily water treatment at El Borma (Hassi Messaoud) with 8 km fiber glass pipeline gathering network and 25,000 m3 concrete evaporation basins. 10 m3/day of oil were recovered, the water was treated for the re-injection needs to maintain reservoir pressure. Project financing with the External Bank of Algeria (BEA), 2005-2007 (US$12 M project).
Duties: Conceptual design coordination and supervision; Project execution plan development ; Project planning, resources allocating and mobilization profile definition; Budget definition, risk analysis and cash flow forecast ; Bid phase management ; Project Financing ; Process modeling supervision; Detailed engineering and procurement management ; Construction inspection and supervision; Detailed project schedule, field activity schedules, labor/ productivity analysis, work progress monitoring ; Monthly progress reporting ; Commissioning and start-up management ; Closeout
Technical Environment: Windows XP; Excel, Process modeling; Primavera, Monte Carlo; Pipe net, Pipe impulse, ADL Pipe, STAAD Pro.
Duration: 26 months

 Procurement and construction of four SCADA system Control Rooms for the electric power distribution network of Oran area, 2003. SONELGAZ . ($US 0.7 M project)
Objectives: Procurement, construction and start up for four SCADA control rooms of the electrical power supply system in Oran area. The scope of work was the civil work, electrical system development and installation, SCADA system installation, air conditioning system installation and fire detection system installation.
Duties: Design review ; Project execution plan development ; Project planning, resources allocating and mobilization profile definition; Budget definition and cash flow forecast ; Procurement management ; Construction inspection and supervision; Detailed project schedule, field activity schedules, labor/ productivity analysis, work progress monitoring ; Monthly progress reporting ; Client interfacing; Commissioning and start-up management ; Closeout
Technical Environment: Windows 2000; Excel, Primavera
Duration: 14 months

 Engineering Project of the Piping and the Fire Fighting System for a 50, 000 m3 Oil Storage Tank. NAFTEC, 2001.
Objectives: Detailed engineering for the piping system and the fire fighting system for 50,000 m3 oil storage tank in Algiers refinery.
Duties: Project execution plan development; Project planning, resources allocating; Bid phase management; Detailed engineering coordination; Weekly progress reporting; Closeout.
Technical Environment: Windows 2000; Excel, Primavera; Pipe net, Pipe impulse, ADL Pipe.
Duration: 4 months.

 Fabrication Documentation Development for a 3, 000 m3 Water Storage Tank of an Oil Field Fire Fighting System. SONATRACH, 2002.
Objectives: Detailed engineering and fabrication documentation development for 3,000 m3 water storage tank of the fire fighting system at Tin Fouyé Tanbankort oil field.
Duties: Project execution plan development; Project planning, budget definition and cash flow forecast; Bid phase management; Design supervision; Weekly progress reporting; Closeout
Technical Environment: Windows 2000; Excel, Primavera; ADL Pipe, STAAD Pro.
Duration: 4 months

 Detailed Engineering Project of a 50, 000 m3 Oil Storage Tank. NAFTEC, Skikda Refinery, 2003.
Objectives: Design and detailed engineering for 50,000 m3 oil storage tank in Skikda refinery. Development of the fabrication and mounting procedures of the tank as well as its piping system and its fire fighting system.
Duties: Project execution plan development; Project planning, budgeting; Bid phase management; Detailed engineering coordination; Weekly progress reporting; Closeout
Technical Environment: Windows 97; Excel, Primavera; Pipe impulse, ADL Pipe, STAAD Pro.
Duration: 6 months

 Diagnosis of the Refineries of Skikda, Algiers and Hassi Messaoud, NAFTEC 2001. jointly with BROWN&ROOT-CONDOR
Objectives: Bidding process for the three refineries regarding process, mechanical and electrical diagnosis in order to come up with recommendations for the production extension.
Duties: Project execution plan development; Project planning, budgeting; Bid phase management; Proposal presentation; Client interfacing.
Technical Environment: Windows 97; Excel, Primavera; HYSIM; ASPEN Plus
Duration: 4 months

 Engineering Project of Fire Detection and Fire Fighting System of the Military Hospital in Oran, 2000.
Objectives: Detailed engineering for fire detection system and fire fighting system of the military hospital in Oran.
Duties: Design supervision; Project planning, budget definition; Detailed engineering management; Biweekly progress reporting and client interfacing; Closeout
Technical Environment; Windows 97; Excel, Primavera; Pipe net, Pipe impulse, ADL Pipe.
Duration: 6 months.

 Testing of the Cathodic Protection System of Pipeline System at Hassi Berkine Oil Field, ANADARKO 2000.
Objectives: Testing and start-up of the cathodic protection system of the gas re-injection pipeline network.
Duties: Design review; Budget definition; On site measurement process supervision; System testing supervision; Start-up supervision; Final report elaboration; Closeout
Duration: 2 month.

 Civil Engineering and Steel Structure for a 1, 200 Tons/Day Urea Production Unit at Arzew 2002. Owner: FERTALGES Industries
Objectives: Detailed civil engineering and steel structure engineering for a urea production unit of 1,200 T/day capacity in Arzew.
Duties: Design review supervision; Project planning, budget definition; Third party interfacing; Monthly progress reporting; Closeout
Technical Environment: Windows 97; Excel, Primavera ; STAAD Pro
Duration: 8 months

 Revamping File Development for the Electrical Network of the National Insurance Company Headquarters, Algiers 2002.
Objectives: Detailed engineering redesign for the electrical network of the building.
Duties: Design review supervision; Budget definition; Redesign supervision; Final report development; Closeout
Duration: 2 months

 Revamping of 15, 000 m3/hr Pumping Station, El Harrach, Algiers 2003. National Water Supply Company
Objectives: Diagnosis and revamping recommendations of 15,000 m3/hr water pumping station.
Duties: Bid phase management; Installation design review; Installation inspection; Final report development and presentation.
Technical Environment: Windows 97; STAAD Pro
Duration: 3 months

 Construction Management of 140 km Pipeline System. SONATRACH, Hassi Messaoud, 2000
Objectives: Construction management of 140 km fiber glass pipeline networks. Oily water gathering network and water re-injection network.
Duties: Design review ; Project execution plan development; Project planning, resources allocating and mobilization profile definition; Budget definition, risk analysis and cash flow forecast; Construction inspection and supervision; Detailed project schedule, field activity schedules, labor/ productivity analysis, work progress monitoring; Monthly progress reporting.
Technical Environment: Windows 97; Excel, MS Project.
Duration: 14 months



March 1994 - November 1998: Project Manager ; Brown&Root-Condor
Hydra, Algeria
Company Industry: Engineering
Job Role/Department: Management

 Project Manager for the Optimization of Hassi Messaoud Hydrocarbon Gathering and Production System Project. The project was carried out, for SONATRACH, between Hassi Messaoud and Los Angeles at Brown&Root Inc offices, (1995-1997). ($US 3 M project)
Objectives: The aim of the project was the production system debottlenecking. Hassi Messaoud oil field production system was modeled, namely the gathering systems, the hydrocarbon treatment systems and the gas re-injection system. Scenarios of the field development were simulated regarding the technical and financial constraints. Optimal solutions were determined and revamping recommendations were issued.
Actions / Responsibilities: Bid phase management; Production documentation review; Project execution plan development; Project planning, resources allocating; Budget definition and cash flow forecast; As-built documentation update supervision; Modeling Process coordination and supervision; Simulations review; Work progress monitoring and monthly progress reporting; Interim and final report development and presentation; Closeout.
Technical Environment: Windows 95; Excel, Primavera; Sim Science packages : Pipe Phase, Pro II
Duration: 22 months

 EPC Project for three Phases Separation Unit of a total capacity of 12, 000 m3/day crude and 15, 000, 000 m3/day gas. The project was carried out for SONATRACH, at Hassi Messaoud, Algiers at Brown&Root-Condor offices and London at Brown&Root Ltd offices, (1994-1995). ($US 6.5 M project)
Objectives: Detailed engineering, procurement, construction and start up of three phase's separation unit of a total capacity of 12,000 m3/day crude and 15,000,000 stdM3/day gas. The detailed engineering was carried out at Brown&Root Ltd offices in Wimbledon - London.
Actions / Responsibilities: Conceptual design coordination and supervision; Project execution plan development; Project planning, budget definition; Design supervision; Detailed engineering and procurement management; Construction inspection and supervision; Monthly progress reporting.
Technical Environment: Windows 3.1; Excel, MS Project; ASPEN Plus, Model Manager
Duration: 12 months



September 1993 - March 1994: Engineering Manager; Condor Engineering
Hydra, Algeria
Company Industry: Engineering
Job Role/Department: Engineering

 Design and Optimization of a Gathering and Distribution Network in Bir Rbaa West Oil Field for AGIP’s Own. 1993
Objectives: Engineering management for the design and optimization of an oil gathering and gas re-injection system in Bir Rbaa West oil field for AGIP's own. Computer software was developed for the design of an optimal configuration of the pipeline network in terms of architecture and hydraulics.
Duties: Conceptual design coordination; Project execution plan development; Computer software development; Design supervision; Detailed engineering management.
Technical Environment: Vax 785, FORTRAN 77
Duration: 4 months

 Optimization of the Water Supply System for Sidi Bel Abbes City. Consultant Engineer, National Water Supply Company, Sid Bel Abbes, 1993.
Objectives: Feasibility study to determine the optimal development scenario of SIdi Bel-Abbes potable water supply system over the coming thirty years. The work consisted in defining an optimal investment program (pipeline, pumping stations, storage tanks and distribution network) in function of the evolution of the water demand.
Duties: Conceptual design; Computer software development; Simulation of scenarios; Interim and final report development.
Technical Environment: Windows 3.1; FORTRAN 77
Duration: 2 months



August 1985 - September 1993: Researcher; Engineer; Algerian National Research Center
Bvd Franz Fanon, Algeria
Company Industry: Science
Job Role/Department: Research

 Machining of Mechanical Parts by the electro-erosion process and training of engineers to the Computer-aided design and numerical command. Researcher at The Material Development Department 1992
 Nuclear Fuel Rod Cladding Simulation. The study was carried out at Mc Master University, Faculty of Engineering, 1992. Researcher.
Objectives: Simulation of fuel road cladding during Loss Of Coolant Accident (LOCA) using a finite element method software in order to determine the optimal cladding design regarding the stress-strain state behavior and the heat transfer.
Duties: Simulation of scenarios; Final report development
Technical Environment: Windows 3.1; FORTRAN 77.
Duration: 6 months

 Uranium Dioxide Pin Modeling and Simulation. Researcher at the Materials Development Department, 1991
Objectives: Software development, using the Finite Element Method, in order to analyze the stress-strain state generated by the temperature gradients through the uranium dioxide pins during the transient regimes.
Duties: Software development: Simulation execution; Final report development.
Technical Environment: Vax 780; FORTRAN 77.
Duration: 8 months

 Modeling of the Densification Phenomenon of Uranium Dioxide Fuel Pins. This work was presented at the fourth IAAE/KFK conference of "Characterization and Quality Control of Nuclear Fuels" in Karlsrhue, Germany, in June 1990, and published in Journal Of Nuclear Material 178 (1991) 300-305.
Objectives: Computer software development for the study of uranium dioxide fuel pins under irradiation and thermal treatment process. Simulation results were compared to experimental results in order to validate the phenomena models.
Duties: Software development: Final report development: Paper writing: Work presentation at the fourth IAAE/KFK conference.
Technical Environment: Vax 780; FORTRAN 77.
Duration: 14 months

 Responsible for the course of Physics of the Building Technology at the Institute of Architecture. Associate Lecturer at Blida University, 1991.
 Evaluations of the BACO Code (BArra COmbustible). Centro Atomico de Bariloche, Argentina in 1987.
Objectives: Evaluation of the BACO (BArra COmbustible) computer code. Evaluation of the simulation results regarding the experimental data. Definition of the fabrication tolerances of nuclear fuel rods. This work was carried out at the Centro Atomico de Bariloche, Argentina.
Duties: Code Development review; Simulations; Final report development
Technical Environment: Vax 785; FORTRAN 77
Duration: 10 months

 Training of Engineers to Software Development Techniques. Project Director, University of Tizi-Ouzou, Institute of Mechanics, 1990
Objectives: Computer software development for modeling and simulating the vibrations of a composite plate using the finite element method..
Duties: Code Development direction; Simulations; Final report review
Technical Environment: Vax 785; FORTRAN 77
Duration: 8 months


September 1983 - August 1985: Reserve Officer; Algerian National Army
Algeria
Company Industry: Military
Job Role/Department: Logistics

 In charge of the Logistic Control System. Bechar


September 1982 - September 1983: Assistant lecturer
Algiers University of Science and Technology
Bab Ezzouar, Algeria
Company Industry: Science
Job Role/Department: Education/Training

 In charge of lab classes in fundamental mechanics and electrical

Comments/ Hobbies/ Interests etc:
OBJECTIVES: Extensive experience in oil and gas technology, business development, project management, project finance and contract negotiations in downstream projects. Looking for a challenging position in the Oil & Gas Industry.

EXPERIENCE: A professional background in the field of energy technology. A long practice in ISO-9001 procedures and management of multi-disciplinary team work. Highly skilled in EPC Project Management, execution plan development, planning, risk analysis, and operation follow-up.


Last Updated on 26-Jan-10


-- End of CV/Resume --


Full CV/Resume available to paid companies/recruiters as an attachment

If you would like to contact this person, you will need to purchase
access to our CV/Resume database.

Please contact our sales department for pricing

sales@expatjob.net



www.expatengineer.net | Engineering Jobs | Site Map